Search NASA⌕ Search

SEARCH · Search NASA

Results for “continuous beams”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

FFA@CEBAF beam transport error and tolerance simulation studies

The Continuous Electron Beam Accelerator Facility (CEBAF) is a 12 GeV recirculating electron accelerator at the Thomas Jefferson National Accelerator Facility (JLAB). Major upgrades to the accelerator are being investigated which include a new 650 MeV injection beamline and state-of-the-art fixed-field alternating (FFA) gradient recirculation arcs. The upgrade will extend the energy of the electron beam to over 20 GeV. In this paper, we provide an error and tolerance simulation study of the amended beam optics transport of the existing accelerator tuned for 22 GeV operation. The study is conducted with the particle tracking codes elegant and Bmad in two parts. In the first part, we treat each section of the accelerator (electromagnetic arcs and linacs) modularly with ideal conditions at the beginning. The second part is a pseudo start-to-end (S2E) simulation with accumulated errors propagating from one beamline to the next.

Accelerator Physics↗

Exploring Causes of Beam Loss at CEBAF

At Jefferson Lab, the Continuous Electron Beam Accelerator (CEBAF) features a unique design with two linear accelerators and two arc sections allowing for multiple turns of the electron beam, as well as four experimental end stations. This topology leads to increased beam losses, especially in the spreader and recombiner regions connecting the arcs to the linacs and in the extraction regions connecting the experimental end stations to the accelerator. These losses result in equipment activation and operational interruptions. Recent upgrades to the facility’s diagnostic systems, including the addition of xenon ion chambers, have provided higher-resolution data regarding these loss events. Building on this improved observational capability, we are developing a simulation framework using optics codes and the Geant4-based BDSIM to model beam extinction and halo formation in these regions. This work aims to correlate simulation results with experimental data to isolate the causes of beam loss and inform future machine tuning strategies. We present a summary of conclusions drawn from recent operational studies and outline a plan to model the beam loss and validate the simulations.

Matthews, C. [Old Dominion Univ., Norfolk, VA (Uni↗

Capture Cavities for the CW Polarized Positron Source Ce+BAF

The initial design of the capture cavities for a continuous wave (CW) polarized positron beam for the Continuous Electron Beam Accelerator Facility (CEBAF) up-grade at Jefferson Lab is presented. A chain of standing wave multi-cell copper cavities inside a solenoid channel are selected to capture positrons in CW mode. The cavity shunt impedance is surveyed by tuning the cavity geometry while considering accommodating large phase space distribution positron beams with large beam pipe radius while ensuring a large enough passband mode separation. The RF field wall loss power and maximum wall loss power density are considered in cavity and waveguide design. A range of design parameters are given for larger system optimization when the capture cavities are considered together with thermal calculation and beam dynamics in next phase of work.

Wang, S.↗

Inverted Geometry Ceramic Insulators in High Voltage DC Electron Guns for Accelerators

A direct current (dc) high voltage photo-emission electron gun operating at 130 kV is utilized at the Jefferson Lab (JLab) Continuous Electron Beam Accelerator Facility to generate spin-polarized electrons for nuclear physics experiments. Over the past decade, JLab has tested and implemented inverted-geometry ceramic insulators in photoguns, connecting the cathode electrode in vacuum to the high voltage power supply using commercial high voltage cables. This contribution reports on tests performed up to 375 kV dc, implementation of inverted insulators in a 300 kV dc photogun generating magnetized electron beams, and describes plans to develop a reliable insulator-cable connector for applying 500 kV dc to a future polarized beam photogun operating reliably and without field emission at 350 kV.

Hernandez-Garcia, C.↗

Design progress for the 22 GeV CEBAF energy upgrade

In this work we examine the progress made in the design of the proposed FFA upgrade to the Continuous Electron Beam Accelerator Facility (CEBAF). This proposed upgrade will double the number of passes through the two linacs by replacing the two highest energy arcs with new Fixed Field Alternating Gradient (FFA) arcs, roughly doubling the energy. These FFA arcs will use permanent magnets in a Halbach configuration to shape their fields. The design involves new optics for the linacs and remaining electromagnetic arcs, as well as new electromagnetic separators. These feed into the permanent magnet FFA arcs. We also report on ongoing studies of the dynamics of the beams, and an experiment to measure the effects of radiation on the permanent magnets.

Accelerator Physics↗

Light dark matter searches with positrons

We discuss two complementary strategies to search for light dark matter (LDM) exploiting the positron beam possibly available in the future at Jefferson Laboratory. LDM is a new compelling hypothesis that identifies dark matter with new sub-GeV “hidden sector” states, neutral under standard model interactions and interacting with our world through a new force. Accelerator-based searches at the intensity frontier are uniquely suited to explore it. Thanks to the high intensity and the high energy of the Continuous Electron Beam Accelerator Facility (CEBAF) beam, and relying on a novel LDM production mechanism via positron annihilation on target atomic electrons, the proposed strategies will allow us to explore new regions in the LDM parameters space, thoroughly probing the LDM hypothesis as well as more general hidden sector scenarios.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Towards large phase space beams at the CEBAF injector

We report on the status of a degrader device to generate large phase space beams for machine acceptance studies in the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab. The degrader device consists of thin, low-Z targets to degrade the electron beam phase space through multiple scattering, two apertures to define the maximum transverse emittance, and a solenoid to aid in matching to the rest of the injector beamline. The engineering design of the degrader device and projected degraded beam phase space parameters are presented.

Sy, A.↗

Selection of Target Thickness and Size of Drive Electron Beam for Ce+BAF Injector

A baseline concept for a continuous wave (CW) polarized positron injector was developed for the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab. This concept is based on the generation of CW longitudinally polarized positrons by a high-current, polarized electron beam (1 mA, 130-370 MeV, and 90% longitudinal polarization) that passes through a rotating, water-cooled, tungsten target. The positron yield and longitudinal polarization are calculated for the 123 MeV Ce+BAF injector at the Low Energy Recirculator Facility (LERF). The longitudinal and transverse CEBAF acceptances, defined as an energy spread of less than 1% and a normalized emittance of less than 100 mm·mrad, have been used in these calculations. The impact of target thickness, transverse electron beam size, and electron beam energy on the yield and polarization of a positron injector is evaluated. The total energy deposited by the beams in the tungsten target and the peak energy density are calculated for different target thicknesses, electron beam sizes, and energies.

Ushakov, Andriy [Thomas Jefferson National Acceler↗

Status of permanent magnet radiation resiliency studies at CEBAF

An ongoing investigation for the future of Jefferson Lab’s Continuous Electron Beam Accelerator Facility (CEBAF) lies in upgrading its maximum nominal energy using Fixed-Field Alternating-gradient (FFA) technology for its recirculating arcs, using permanent magnets for the FFA arcs. A common concern among the community is the degradation of these permanent magnets during operation due to the radiation environment in which they will be present. This work, funded by a Laboratory Directed R&D grant, aims to measure the permanent magnet degradation in the CEBAF tunnel enclosure, and extrapolate to the energies expected from the upgrade. We present the latest results of this study, as well as plans moving forward.

Accelerator Physics↗

CEBAF Injector Model for KL Beam Conditions

The Jefferson Lab KL experiment will run at the Continuous Electron Beam Accelerator Facility with a much lower bunch repetition rate (7.80 or 15.59 MHz) than nominally used (249.5 or 499 MHz). While the proposed average current of 2.5 - 5.0 muA is relatively low compared to the maximum CEBAF current of approximately 180 muA, the corresponding bunch charge is atypically high for CEBAF injector operation. In this work, we investigated the evolution and transmission of low-rep-rate, high-bunch-charge (0.32 to 0.64 pC) beams through the CEBAF injector. Using the commercial software General Particle Tracer, we have simulated and analyzed the beam characteristics for both values of bunch charge. We performed these simulations with the existing injector using a 130 kV gun voltage. We have calculated and measured the transmission as a function of the photocathode laser spot size and pulse length. We report on the findings of these simulations and optimum parameters for operating the experiment.

Pokharel, Sunil↗

Measurements of Electron Beam-Induced Spin-Relaxation in Frozen-Spin Hydrogen-Deuteride (HD)

Targets of solid hydrogen-deuteride (HD) can be prepared in a frozen-spin state with spin relaxation times (T1) in excess of a year. The present work has studied their potential use in experiments with electron beams. Polarization relaxation rates have been measured during exposure to sub-nanoAmp currents of 9.7 MeV electron beams from the recently commissioned Upgraded Injector Test Facility (UITF) at Jefferson Lab (JLab). These UITF measurements can be used to anticipate the expected performance at the GeV energies typical of JLab experiments, since the energy deposition in a target is almost independent of beam energy. An in-beam dilution refrigerator equipped with superconducting solenoids has been used to maintain solid HD samples at ?0.1 K and ?1 tesla, and internal NMR coils have been used to monitor hydrogen polarization. Spin-relaxation in two frozen-spin targets, with initial H-polarizations of 40% and 34%, have been tracked while exposed to beams under varying conditions of current, dose, beam duty factor and temperature. At a fixed accumulated dose, the spin-relaxation rates drop with current, suggesting depolarization by the charge cloud of the beam. Imposing a duty factor on the otherwise continuous UITF beam, with forced millisecond scale gaps, has shown no obvious correlation to polarization loss rates. After an accumulated dose of ?2 ?C/cm2, beam-off spin-relaxation rates drop from their immeasurably long pre-irradiation values to the order of weeks (with beam-on T1 values typically an order of magnitude shorter), reflecting a buildup of paramagnetic charge centers within the HD lattice. The accumulated polarization loss was approximately proportional to dose in both targets, dropping to 1/e of their initial values after ?6 ?C/cm2. Thermal equilibrium polarizations of targets not in the frozen-spin state (with intentionally short T1) have been used to deduce the in situ temperature of solid HD while under electron bombardment. A model for depolarization by beam-associated paramagnetic impurities largely accounts for the data, and suggests that improvements in heat removal could lead to significant increases in the in-beam T1.

O'Connell, Thomas↗

Development of a direct-sampling RF receiver for precision beam charge measurements in the MOLLER experiment

Here, we have developed and tested a direct-sampling RF receiver capable of measuring the amplitude of a 1497 MHz sinusoidal beam signal in 0.5 ms integration windows with a relative uncertainty of better than 10 parts per million. The receiver is intended for measuring signals from beam current monitoring cavities on the beamline of the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab. The beam signal strength, frequency, and integration window fulfill the thus far unmet requirements of the upcoming MOLLER experiment to measure the beam charge for different helicity states.

47 OTHER INSTRUMENTATION↗

CHARACTERIZATION OF RADIATION DAMAGES TO POSITRON SOURCE MATERIALS

The secondary beam production target at future positron sources at the Continuous Electron Beam Accelerator Facility (CEBAF), the International Linear Collider (ILC) or the Future Circular Collider (FCC), features unprecedented mechanical and thermal stresses which may compromise sustainable and reliable operation. Candidate materials are required to possess high melting temperature together with excellent thermal conductivity, elasticity and radiation hardness properties. In order to substantiate the material choice for the CEBAF and ILC positron sources, the response of candidate materials such as titanium alloys, tungsten, and tantalum to electron beam irradiation was experimentally investigated. CEBAF and ILC expected operating conditions were mimicked using the 3.5 MeV electron beam of the MAMI facility injector. The material degradations were precisely analyzed via high energy X-ray diffraction at the HEMS beamline operated by the Helmholtz-Zentrum Hereon at the PETRA III synchrotron facility. This work reports the results of these measurements and their interpretation.

Lengler, T.↗

Machine Learning Based Cavity Fault Classification and Prediction

We report on the development of machine learning models for classifying C100 superconducting radio frequency (SRF) cavity faults in the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab. CEBAF is a continuous-wave recirculating linac utilizing 418 SRF cavities to accelerate electrons up to 12 GeV through 5-passes. Of these, 96 cavities (12 cryomodules) are designed with a digital low-level RF system configured such that a cavity fault triggers waveform recordings of 17 RF signals for each of the eight cavities in the cryomodule. Subject matter experts (SME) can analyze the collected time-series data, identify which of the eight cavities faulted first, and classify the type of fault. This information is used to find trends and strategically deploy mitigations to problematic cryomodules. However, manually labeling the data is laborious and time-consuming. By leveraging machine learning, near real-time – rather than post-mortem – identification of the offending cavity and classification of the fault type has been implemented. We discuss the performance of the ML models during a recent physics run.

43 PARTICLE ACCELERATORS↗

Impact of superlattice size on quantum efficiency and polarization in MOCVD-grown strained GaAs/GaAsP photocathodes

Strained superlattice GaAs photocathodes are crucial for providing high photocurrent beams of spin-polarized electrons at several accelerator facilities including the Continuous Electron Beam Accelerator Facility at Thomas Jefferson National Accelerator Facility and the future Electron–Ion Collider at Brookhaven National Laboratory. Here, in this work, we study the effects of varying the number of superlattice pairs on the polarization and photocurrent of the photocathodes. We observe a saturation in quantum efficiency beyond 30 pairs, with additional layers yielding minimal photocurrent improvement while noticeably reducing the polarization of the beam.

Chemical vapor deposition↗

Warm Unit Stand Analysis for Proton Improvement Project II

The Proton Improvement Project II, commonly referred to as PIP II, is a linear accelerator overhaul at Fermilab to eventually double the output of its existing proton beam to continue to be the leading force in high energy physics. The proton beam is created through a series of high frequency cryomodules that must be connected utilizing a combination of magnets and vacuum pumps to ensure the beam is properly aligned. A housing mechanism for the magnets and vacuum pumps (Warm Units) will be placed between the cryomodules for realignment and require multiple stages of 6 degree-of-freedom adjustment options, to ensure that the beam alignment can fit all realistic requirements. Extensive testing and design modifications on the Warm Unit stand was completed to confirm not only the strength of the unit in nominal configuration, but also at each possible adjustment orientation for each 6 degree-of-freedom option. Structural analysis was also completed for various unique loading conditions i ncluding transportation loading and confirming the unit satisfies international building code. Simultaneously, testing and design modifications were done to confirm that the frequency modes of the system resided outside of concern ranges, which is determined by Fermilab safety codes and is set to exceed 15 Hz. Design changes that simultaneously stiffen the system to raise the lowest frequency modes while expanding access for technicians and allow for easier fabrication were developed and implemented into the Warm Unit stand. Various relationships between the design changes and the overall vibrational patterns were also developed for future use and study as the rest of PIP II matures.

43 PARTICLE ACCELERATORS↗

FFA BEAM TRANSPORT DEMONSTRATION DEVELOPMENT FOR THE CEBAF 22 GeV UPGRADE

Jefferson Lab is planning an upgrade of the Continuous Electron Beam Accelerator Facility (CEBAF) to deliver highly polarized electron beams up to 22 GeV using Fixed- Field Alternating-gradient (FFA) magnets. As the application of FFA technology in the 10–22 GeV energy range is unprecedented, experimental validation is required prior to full-scale implementation. To support this effort, a dedicated FFA test insert is proposed within the existing CEBAF infrastructure, with candidate locations in the Beam Switchyard (BSY) dump line or the Hall C beamline. The testbed will consist of a half or full FFA cell using combined-function permanent magnets and will enable systematic studies of beam transport, field quality, alignment, and magnet performance under realistic conditions. Operation with polarized beams in the 5–11 GeV range will closely replicate the energy scaling of the full upgrade. This paper presents the current design status and layout options for the proposed FFA beam transport test line.

Ogur, S. [Thomas Jefferson National Accelerator Fa↗