At least 55 records · Page 3

Safety-Related Instrumentation and Control Pilot Upgrade: Initial Scoping Phase Implementation and Lessons Learned

In May 2016, the U.S. Nuclear Regulatory Commission (NRC) staff provided a digital instrumentation and control (I&C) regulatory infrastructure integrated action plan to the NRC for approval. One of the objectives of that plan was to establish a clear regulatory structure with reduced regulatory uncertainty to enable the expanded safe use of digital I&C in commercial nuclear reactors while continuing to ensure safety and security. To achieve this end, the NRC, with collaboration from industry, developed a streamlined License Amendment Request Alternate Review (AR) process for safety-related (SR) digital I&C upgrades. In spite of this effort, the industry has remained reluctant to perform such I&C upgrades because of perceived regulatory and financial risks associated with being the first or an early adopter of the AR process for SR I&C upgrades. The U.S. Department of Energy Light Water Reactor Sustainability Program at the Idaho National Laboratory performed Initial Scoping Phase research to help break this impasse by supporting a SR I&C Pilot Upgrade, working with MPR Associates, ScottMadden Inc., and Exelon Generation. Exelon’s Limerick Generating Station (LGS) was selected as the target for this research. This paper summarizes the Initial Scoping Phase engineering and operations, licensing, and project management activities necessary to bound the scope, schedule, and estimated cost of the project sufficiently to enable utility management authorization of Conceptual Design Phase activities. These efforts and associated products are intended to provide a template to support larger industry efforts to perform similar upgrades as a foundation stone for a digital transformation that will improve plant safety, reliability, and operational performance while lowering plant total cost of ownership. As a result of the combined effort of Exelon Generation and research participants, Conceptual Design Phase activities for the subject upgrade at LGS were approved by Exelon. Further, the U.S. Department of Energy also awarded a $50 million cost share award to Exelon in order to pave the way for SR I&C modernization and associated control room upgrades across the U.S. nuclear fleet. Additional research reports are planned for the Conceptual Design Phase, Detailed Design Phase, and the Implementation Phase of the LGS project to document the process followed and promulgate lessons learned to industry.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Safety-Related Instrumentation and Control Pilot Upgrade (Initial Scoping Phase Implementation Report)

This research report (1) describes the process followed and products developed during the SR I&C Pilot Project Initial Scoping Phase, and (2) captures lessons learned. Exelon Generation and LWRS collaborated to develop a Digital Transformation Strategy as part of a larger Advanced Concept of Operations. The proposed SR I&C Pilot Upgrade provides a foundation stone for this Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant Total Cost of Ownership (TCO). Initial Scoping Phase activities for this Pilot Project have been performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process (SDP), NISP-EN-04, Standard Digital Engineering Process (SDEP), and Electric Power Research Institute (EPRI) Report 3002011816, Digital Engineering Guide (DEG). Completing Initial Scoping Phase Engineering and Operations, Licensing, and Project Management Activities was necessary to sufficiently bound the scope, schedule, and estimated cost of the Project to enable utility management to authorize moving into the Conceptual Design Phase. A significant finding of the Business Case Analysis (BCA) methodology developed and applied as part of this effort was that the growth rate of material costs for sustaining the operation of obsolete SR I&C equipment is accelerating. This directly contributed to the Project Economic Analysis created to justify continuing the Project. Project Initial Scoping Phase lessons learned have also been captured to assist the larger industry in understanding the Digital Transformation Strategy and SR I&C Pilot Project Initial Scoping Phase efforts. This is in keeping with the public/private partnership that has been established between the Department of Energy (DOE) and Exelon for this effort with engagement from the NRC. By addressing first-of-a-kind (FOAK) risks and capturing lessons learned, the SR I&C Pilot Upgrade Project addresses technical, regulatory, and business risks to enable subsequent implementers of similar upgrade.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Safety-Related Instrumentation & Control Pilot Upgrade Initiation Phase Implementation Report

This research report (1) describes the process followed and products developed during the SR I&C Pilot Project Initial Scoping Phase, and (2) captures lessons learned. Exelon Generation and LWRS collaborated to develop a Digital Transformation Strategy as part of a larger Advanced Concept of Operations. The proposed SR I&C Pilot Upgrade provides a foundation stone for this Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant Total Cost of Ownership (TCO). Initial Scoping Phase activities for this Pilot Project have been performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process (SDP) [Reference 2], NISP-EN-04, Standard Digital Engineering Process (SDEP) [Reference 3], and Electric Power Research Institute (EPRI) Report 3002011816, Digital Engineering Guide (DEG). Completing Initial Scoping Phase Engineering and Operations, Licensing, and Project Management Activities was necessary to sufficiently bound the scope, schedule, and estimated cost of the Project to enable utility management to authorize moving into the Conceptual Design Phase. A significant finding of the Business Case Analysis (BCA) methodology developed and applied as part of this effort was that the growth rate of material costs for sustaining the operation of obsolete SR I&C equipment is accelerating. This directly contributed to the Project Economic Analysis created to justify continuing the Project. Project Initial Scoping Phase lessons learned have also been captured to assist the larger industry in understanding the Digital Transformation Strategy and SR I&C Pilot Project Initial Scoping Phase efforts. This is in keeping with the public/private partnership that has been established between the Department of Energy (DOE) and Exelon for this effort with engagement from the NRC. By addressing first-of-a-kind (FOAK) risks and capturing lessons learned, the SR I&C Pilot Upgrade Project addresses technical, regulatory, and business risks to enable subsequent implementers of similar upgrades.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Forestry applications project/timber resource. Sam Houston National forest inventory and development of a survey planning model

The Forestry Applications Project has been directed towards solving the problem of meeting informational needs of the resource managers utilizing remote sensing data sources including satellite data, conventional aerial photography, and direct measurement on the ground in such combinations as needed to best achieve these goals. It is recognized that sampling plays an important role in generating relevant information for managing large geographic populations. The central problem, therefore, is to define the kind and amount of sampling and the place of remote sensing data sources in that sampling system to do the best possible job of meeting the manager's informational needs.

Colwell, R. N.↗

Enhancing the Flexibility of Generation of Run-Of-the-River Hydro Power Plants

Run-of-the-River Hydro Power Plants (ROR HPPs) output can be characterized as fixed and predictable output with low cost of both installation and operation. ROR HPP generation is proportional to the water flow and cannot be adjusted to provide inertia to the grid, which is critical to power systems stability. Hence ROR HPP can only participate in low profit energy markets and not in the high profit ancillary service market. With the advances in energy storage, they can help build a synthetic energy reservoir. The combined operation of ROR HPPs and energy storage are capable of both ramping and variable power output, allowing participation in the ancillary service markets. However, energy storage technologies such as supercapacitors and flywheels, which are power dense can quickly charge/discharge within a short duration. Energy dense storage technologies such as batteries can provide long duration energy injection while the maximum ramping rate is much lower than power dense energy storage. In order to provide long duration fast ramping capability, Hybrid Energy Storage Systems (HESSs) including both power and energy dense energy storage are proposed to be integrated to enable the flexible operation of ROR HPP. Power dense energy storage with quick burst of energy can assist in regulation, whereas energy dense storage can provide energy balance over larger time. In this paper, the properties of different types of energy storage including the ramping rate, affordable energy storage capacity, thermal management, etc. are analyzed. The size of each type of energy storage is determined to ensure optimal combination of HESS and ROR HPP. A generic Front End Controller (FEC) is developed and customized for ROR HPP to provide real time control and cohesive operation of multiple units. FEC serves as the interface between utility management systems and ROR HPPs to ensure their integration with the centralized controls. Using the Automatic Generation Control (AGC) signal received from grid operator, FEC optimizes the ROR HPP turbine and HESS so that the aggregated generation can satisfy the market needs. Based on the study, system operator can acquire extra inertia support for system stability, and the ROR HPP operators can enhance their revenues by participating in wider market avenues.

13 HYDRO ENERGY↗

Bill Savings vs. Backup Power: Evaluating operational tradeoffs for home solar+storage systems [Slides]

This study explores tradeoffs between the use of home solar+storage systems for backup power versus day-to-day utility bill savings. The study focuses specifically on the “reserve setting” available with most home battery storage systems, which allow the customer to maintain some minimum level of storage in reserve in case of an unforeseen power interruption. The more capacity that is held in reserve, the greater the customer’s ability to ride-through possible power interruptions, but less capacity is then available to manage utility bills on a day-to-day basis. This study evaluates this operational tradeoff across a diverse set of locations and residential electricity tariff structures, relying on Berkeley Lab’s PRESTO model to stochastically simulate power interruption events, and exploring a range of sensitivities, including variations in customer value of lost load (VoLL), interruption frequency, and other key drivers. The results show that, in most circumstances, the opportunity cost of holding storage capacity in reserve, in terms of foregone bill saving, tends to outweigh any gains in reliability value associated with mitigated power interruptions. This finding is robust across tariff structures and across most of the sensitivities considered, including those related to rate level, customer load level, and storage sizing. There are a limited set of circumstances where raising the reserve setting improves the overall customer value (comprised of bill savings plus reliability value). Specifically, that exception occurs when all of the following conditions apply: (a) the customer resides in a location with exceptionally poor reliability, (b) the customer has exceptionally high VoLL; (c) the customer is on a net billing rate or on a TOU rate that allows grid discharging but not grid charging; and (d), depending on the location, the price arbitrage differential on that rate is relatively small. In all other circumstances analyzed, total customer value declines with reserve level.

14 SOLAR ENERGY↗

Barriers and Opportunities to Broader Adoption of Integrated Demand Side Management at Electric Utilities: A Scoping Study

Integrated demand-side management (IDSM) is a strategic approach to designing and delivering a portfolio of demand side management (DSM) programs to customers. IDSM typically delivers customer centric strategies with the goal of increasing the amount of DSM in the field, but doing so in a way that integrates various measures and technologies to improve their collective performance and/or penetration. Specifically, IDSM can be defined as the integrated or coordinated delivery of three or more of: (1) energy efficiency (EE), (2) demand response (DR), (3) distributed generation (DG), (4) storage, (5) electric vehicle (EV) technologies, and (6) time-based rate programs to residential and commercial electric utility customers. The electric industry’s limited experience deploying IDSM to date suggests that significant barriers may exist. This report explores recent electric utility experience with IDSM to provide an assessment of the barriers and potential benefits perceived or experienced by program administrators in their attempts to implement integrated programs. The research draws on surveys and interviews with eleven staff from a sample of eight DSM program administrators and program implementers who were currently implementing or had previously attempted to implement an IDSM program or initiative. Respondents provided their perspectives on drivers for IDSM and barriers to broader deployment. They also reported on actions they had undertaken to promote expanded delivery of IDSM and provided their assessments of the most important under-tapped opportunities for expanding IDSM efforts, both for program administrator and regulatory organizations.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Regulatory Incentives and Disincentives for Utility Investments in Grid Modernization

Electric power is America's most capital-intensive industry, with more than $100 billion invested each year in energy infrastructure. Investment needs are likely to grow as electric utilities make power systems more reliable and resilient, deploy advanced digital technologies, and facilitate new services to meet some consumers' expectations for greater choice and control. But do current regulatory approaches provide the appropriate incentives for grid modernization investments? This report presents three perspectives: -Financial analyst Steve Kihm begins by explaining that any major investor-owned electric utility that wants to raise capital today can do so at a reasonable cost. The question is whether utility managers want to raise capital for grid modernization. Specifically, they look for investments that create the most value for their existing shareholders. In cases where grid modernization investments are not the best choice in terms of shareholder value, Kihm describes shareholder incentive mechanisms that regulators could consider to encourage such investments when they are in the public interest. -From an institutional perspective, Dr. Janice Beecher finds that the traditional rate-base/rate of return regulatory model provides powerful incentives for utilities to pursue investments, cost control, efficiency and even innovation, and it is well suited to the policy objectives of grid modernization. Prudence of grid modernization investments (fair returns) depends on careful evaluation of the specific asset, and any special incentives (bonus returns) should be used only if they promote economic efficiency consistent with the core goals of economic regulation. According to Beecher, realizing the promises of grid modernization depends on effective implementation of the traditional regulatory model and ratemaking tools to serve the public interest. -Conversely, former commissioner and clean energy consultant Ron Lehr says that rapid electric industry changes require a better alignment of utility investment incentives with changes challenging the electricity sector, emerging grid modernization options and benefits, and public policies. For example, investor-owned utilities typically have an incentive to make capital investments, but rarely to employ expense-based solutions, since utilities do not earn profits on expenses. Further, Lehr cites a variety of factors that stand in the way of creating well targeted and well aligned utility incentives, including litigated regulatory processes. These may be a poor choice for finding the right balance among competing interests, establishing rules of prospective application, justifying demonstrations of new technologies and approaches to meeting emerging consumer demands, and keeping pace with rapid change.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Final Report on Community Solar Design Models for Consumer, Industry, & Utility Success

Since the inception of the first community solar program in 2006, a number of different utility, solar industry and consumer driven community solar program models have emerged across the country with varying regulatory and solar market frameworks behind them. There is little consistency in how programs are administered, participant benefits are assigned, and customers are charged for participation. Further, while it is regularly speculated that community solar programs meet the needs of customers, no such consumer research has been completed against different community solar program models. This collaborative research effort addressed three primary issues: Program design models are numerous and evolving, with varying degrees of applicability across different state policy, utility regulatory, and solar market types. The agents, transaction methods, and accruing costs and benefits are highly variable and largely built on anecdotally successful model evolution. ‘Community solar’ (shared/group solar, solar gardens, etc.) has become a catch-all concept that means different things to different stakeholders, limiting constructive program development and growth. Everything from green pricing programs to remote net metering to metering aggregation has been framed as community solar. Consumer research on individual concepts and program models has been done, but no comprehensive and comparative market research on the broader design models and attributes has been performed. SEPA’s collaborative research effort on Community Solar Design Models for Consumer, Industry, & Utility Success is premised on the principle that greater standardization of community solar models and better understanding of consumer interests are key underpinnings of increased community solar deployment. Utilizing a cross-sectional multi-stakeholder working group, as well as focus groups and surveys, webinars, targeted outreach, and other tools, this project aims to expand the community solar knowledge base, facilitate information exchange, identify opportunities for standardization and improvement, determine what consumers’ interests are and how best to message to them, promote the research results within the solar and utility industries, and advance key opportunities for strategic deployment plans for community solar. A summary of these key takeaways/lessons learned during the grant period include: Siting of system should be evaluated up-front in the process Engage stakeholders collaboratively and early to help ensure the best chance for a successful program IT/billing departments must have a seat at the design table Establish upfront target objectives with respect to residential and commercial program access levels helps ensure program success Balance trade-offs to manage utility and developer risk with customer participation carefully to optimize pricing and sizing the program offering Over the course of the 42 month grant period, SEPA and its project team conducted a series of activities all designed to accelerate the number and size of community solar programs across the country. These activities included: Community Solar Program Design Models (2 reports) – SEPA, in collaboration with its projects team, the Coalition for Community Solar Access, and over 60 administrators of actual community solar programs, developed two reports providing hard data on the developments of community solar. These reports touched on program performance, quantity and type of programs, and program design steps, among other aspects. The reports collectively received over 2000 unique downloads. Market Research Report – SEPA, in collaboration with The Shelton Group, conducted a series of national surveys and focus groups to identify what customers were looking for in a community solar offering. The resulting report, “What the Community Solar Customer Wants”, received over 1,000 unique downloads. Technical Assistance Projects – SEPA supported 8 organizations who were pursuing community solar programs. Based on this support, over 5.7 MWs of new solar capacity have been developed. Technical Assistance Case Studies – SEPA developed two case studies detailing the technical assistance work in Fremont, NE Department of Utilities and the public power arm of Minster Ohio. These two reports have received 1,002 unique downloads. Webinar – SEPA hosted two webinars on community solar which collectively received 743 participants. The webinars focused on disseminating the findings of the research conducted under this project, as well as the research conducted in separate solar market pathways projects. Community Solar Design Workshops – 120 registrants learned about the trends in community solar and participated a business case exercise to design their own programs.

14 SOLAR ENERGY↗

Investigation using data from ERTS-1 to develop and implement utilization of living marine resources

The author has identified the following significant results. This 15-month ERTS-1 investigation produced correlations between satellite, aircraft, menhaden fisheries, and environmental sea truth data from the Mississippi Sound. Selected oceanographic, meteorological, and biological parameters were used as indirect indicators of the menhaden resource. Synoptic and near real time sea truth, fishery, satellite imagery, aircraft acquired multispectral, photo and thermal IR information were acquired as data inputs. Computer programs were developed to manipulate these data according to user requirements. Preliminary results indicate a correlation between backscattered light with chlorophyll concentration and water transparency in turbid waters. Eight empirical menhaden distribution models were constructed from combinations of four fisheries-significant oceanographic parameters: water depth, transparency, color, and surface salinity. The models demonstrated their potential for management utilization in areas of resource assessment, prediction, and monitoring.

Stevenson, W. H.↗

Electric Access System Enhancement (EASE): Assessment of a Distributed Energy Resource Management System for Enabling Dynamic Hosting Capacity

The Electric Access System Enhancement (EASE) project demonstrated a scalable, interoperable, and cost-effective means of integrating high penetration of distributed energy resources (DERs). The control architecture developed leveraged a Distributed Energy Resource Management System, Distribution System Operator for transacting energy, and 3rd Party DER Aggregator platform. The project identified ways to enhance the customer interconnection process to the grid and improve access to information from DERs and optimize the usage of DERs to provide energy services in a simulated day-ahead shadow market while maintain grid reliability. By integrating these capabilities into a scalable system of systems, the DSO can effectively balance DER generation and customer demand on the distribution network. This capability allows the grid to host more DER than traditionally possible on wires alone. Hosting more DER has the added benefit of supplying increased demand growth, sometimes beyond the capacity limits of the distribution network itself. This is known as a dynamic hosting capacity, which could help utilities manage the forecasted growth in electricity demand as California switch to electric vehicles and appliances. This could help to establish energy storage and PV generation as a “pseudo firm” generation resource mix if managed appropriately and provide sufficient resource adequacy for distribution capacity upgrade deferrals.

14 SOLAR ENERGY↗

Winners are not keepers: Characterizing household engagement, gains, and energy patterns in demand response using machine learning in the United States

Demand-response programs can help utilities manage rapidly evolving electric grids, but these programs are subject to the complexities of human behavior. This paper explores a novel method for uncovering heterogeneity in households. In this work, we use a machine-learning method known as a Conditional Inference Tree (c-tree) algorithm to categorize households based on their energy behavior characteristics collected via smart meters, and explore how this translates through into heterogeneity in their real-world response to a DR program. Using data from randomized controlled trial, we generate estimates of the changes in energy use caused by the program within each household group. Our results show that the c-tree approach differentiates households by their energy-use characteristics in a way that increases the spread in enrollment rates and critical peak reduction among household groups, compared with the spreads achieved via several conventional segmentation methods. Thus, the c-tree analysis enables the most tailored targeting of major potential energy savers and could provide the greatest increase in cost-effectiveness of household recruitment into DR programs. Our results also offer fresh insights into the relationships between household energy behavior characteristics – such as peak energy use and “structural winningness” (the ability to save money under a DR program without changing energy-use behaviors) – and household decisions about enrolling in DR programs and reducing energy use. Our research also demonstrates the potential of smart meter data, combined with machine learning and econometric methods, to provide significant value to utilities, program implementers, researchers, and other stakeholders.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Electric load shape benchmarking for small- and medium-sized commercial buildings

Small- and medium-sized commercial buildings owners and utility managers often look for opportunities for energy cost savings through energy efficiency and energy waste minimization. However, they currently lack easy access to low-cost tools that help interpret the massive amount of data needed to improve understanding of their energy use behaviors. Benchmarking is one of the techniques used in energy audits to identify which buildings are priorities for an energy analysis. Traditional energy performance indicators, such as the energy use intensity (annual energy per unit of floor area), consider only the total annual energy consumption, lacking consideration of the fluctuation of energy use behavior over time, which reveals the time of use information and represents distinct energy use behaviors during different time spans. To fill the gap, this study developed a general statistical method using 24-hour electric load shape benchmarking to compare a building or business/tenant space against peers. Specifically, the study developed new forms of benchmarking metrics and data analysis methods to infer the energy performance of a building based on its load shape. We first performed a data experiment with collected smart meter data using over 2,000 small- and medium-sized businesses in California. We then conducted a cluster analysis of the source data, and determined and interpreted the load shape features and parameters with peer group analysis. Finally, we implemented the load shape benchmarking feature in an open-access web-based toolkit (the Commercial Building Energy Saver) to provide straightforward and practical recommendations to users. The analysis techniques were generic and flexible for future datasets of other building types and in other utility territories.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Decentralized Control Synthesis for Air Traffic Management in Urban Air Mobility

Urban air mobility (UAM) refers to air transportation services within an urban area, often in an on-demand fashion. We study air traffic management (ATM) for vehicles in a UAM fleet, while guaranteeing system safety requirements such as traffic separation. Existing ATM methods for unmanned aerial systems, such as UAS traffic management, utilize alternative approaches which do not provide strict safety guarantees. No established infrastructure exists for providing ATM at scale for UAM. We provide a decentralized, hierarchical approach for UAM ATM that allows for scalability to high traffic densities as well as providing theoretical guarantees of correctness with respect to user-provided safety specifications. Our main contributions are two-fold. First, we propose a novel UAM ATM architecture that divides the control authority between vertihubs that are each in charge of all UAM vehicles in their local airspace. Each vertihub also contains a number of vertiports that are in charge of UAM vehicle takeoffs and landings. The resulting architecture is decentralized and hierarchical, which not only enables scalability, but also robustness in the event of any individual vertihub or vertiport no longer being operational. Second, we provide a contract-based correct-by-construction reactive synthesis approach that provably guarantees safety properties with respect to user-provided specifications in linear temporal logic. We demonstrate the approach on large-volume UAM air traffic data.

Urban Air Mobility↗

Harnessing distributed GPU computing for generalizable graph convolutional networks in power grid reliability assessments

Although machine learning (ML) has emerged as a powerful tool for rapidly assessing grid contingencies, prior studies have largely considered a static grid topology in their analyses. This limits their application, since they need to be re-trained for every new topology. Here, this paper explores the development of generalizable graph convolutional network (GCN) models by pre-training them across a range of grid topologies and contingency types. We found that a GCN model with auto-regressive moving average (ARMA) layers with a line graph representation of the grid offered the best predictive performance in predicting voltage magnitudes (VM) and voltage angles (VA). We introduced the concept of phantom nodes to consider disparate grid topologies with a varying number of nodes and lines. For pre-training the GCN ARMA model across a variety of topologies, distributed graphics processing unit (GPU) computing afforded us significant training scalability. The predictive performance of this model on grid topologies that were part of the training data is substantially better than the direct current (DC) approximation. Although direct application of the pre-trained model to topologies that are not part of the grid is not particularly satisfactory, fine-tuning with small amounts of data from a specific topology of interest significantly improves predictive performance. In general, this paper highlights the feasibility of training large-scale GNN models to assess the reliability of power grids by considering a wide variety of grid topologies and contingency types. With the advent of foundational models in ML and the exponential increase in GPU computing clusters, generalizable ML models will significantly enhance how utilities manage power systems and make decisions in real-time or near-real-time.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Backup power or bill savings? How electricity tariffs impact residential solar-plus-storage usage in the United States

Adoption of paired solar-plus-storage systems has accelerated in recent years, driven by both the demand for backup power and a desire to manage utility bills. Tradeoffs between those two uses can arise through the reserve setting on the battery storage system, which serves to maintain a minimum state of charge in case of a power interruption. Our paper applies an economic framework to evaluate this tradeoff in terms of changes in bill savings and customer reliability value across reserve levels, considering how those tradeoffs depend on the underlying electricity rate structure and levels. The analysis is based on a representative set of load profiles, solar profiles, tariff designs, and stochastic power interruption events across ten different regions in the United States. We find that the opportunity cost of holding storage capacity in reserve, in terms of foregone bill reductions, outweighs any gains in reliability value from mitigated power interruptions in the majority of customer situations. Higher storage reserve levels increase total customer value only in specific circumstances, such as for customers with inferior reliability (10x average interruptions), with a very high value of lost load ($50/kWh), and with tariff or interconnection rules that disallow grid charging. However, even this result is dampened when considering tariff designs with higher price differentials that increase the opportunity cost of holding storage in reserve (e.g. import/export or time-of-use rates). Allowing grid charging in tariffs essentially eliminates the necessity to hold any storage in reserve in all sensitivity cases explored.

Electric resilience↗

Optimizing Grid-interactive Efficient Building Designs with Stacked Value Streams

Grid-interactive efficient buildings (GEBs) are those characterized by the combination of energy efficiency and demand flexibility with smart technologies and communications to not only deliver greater affordability and comfort to buildings, but also help utilities manage grid operations and lower system costs. This paper presents an innovative techno-economic assessment framework to effectively examine different GEB design options, explore various use cases, define technically achievable benefits, and thereby assist in informed decision-making. In particular, building load flexibility, thermal storage, and battery energy storage are considered. Advanced optimal dispatch problem is formulated to maximize the stacked value streams from multiple, competing use cases, subject to the physical capabilities and operational flexibility associated with different designs and configurations. Comprehensive case studies were performed for a real-world building to evaluate the cost-effectiveness of different GEB designs and offer in-depth insights. It was found that the proposed assessment method could effectively capture the costs and benefits linked to each GEB design option. Furthermore, the study revealed that outage mitigation and demand response are the two most significant sources of benefits for GEBs.

Ma, Xu↗

Facility Energy Decision System (FEDS) version 7.0

Designed for building energy managers, utilities and firms providing energy services, FEDS provides a comprehensive and user-friendly method for users to quickly and accurately identifying energy conversion and end-use technology improvements that offer maximum savings in energy usage and cost. FEDS enables the user to assess energy efficiency and consumption, identify retrofit opportunities, select minimum life cycle costs, determine payback, and prioritize investments in energy efficiency retrofit projects for multiple or single buildings across a particular site. As part of the life-cycle cost optimization it also considers several options for partial or complete abandonment of central energy plants including: individual technologies dropping off a thermal loop, a loop and all technologies dropping off a central plant, and all technologies and loops dropping off a central plant resulting in its complete abandonment. Improvements in release 7.0 include: FEDS 7.0 is now a full hourly simulation model (runs every hour of the year as opposed to the previous simplified hourly approach which ran 9 24-hour periods to represent each month). Enhanced building operation and occupancy modeling; New HVAC technology options (VAV, Economizers, Demand Controlled Ventilation, Terminal Reheat, Subcool Dehumidification); Additional chiller types; New lighting technologies (LED, Halogen, Induction, additional fluorescent options); Completely updated retrofit cost and performance data; Regional cost data tied to zip code (previously applied state level averages); Updated and enhanced reporting capabilities; and New pier floor model

Dirks, James↗