Search NASA⌕ Search

SEARCH · Search NASA

Results for “Complexity management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Space station data management system assessment methodology

A computer-aided modeling tool and methodology was developed and is currently being used to assess candidate designs for the Space Station Data Management System (DMS). The DMS will be a complex distributed computer system including processors, storage devices, local area networks, and software that will support all processing functions on board the Space Station. The methodology produces assessments of the performance, reliability, cost, and physical attributes of the candidate designs. This paper describes the architecture and design of the modeling tool and presents the modeling methodology.

Jones, W. R.↗

Environmental projects. Volume 5, part 1: Study of subsurface contamination. Part 2: Guide to implement environmental compliance programs

In support of the national goal for the preservation of the environment and the protection of human health and safety, NASA, the Jet Propulsion Laboratory, and the Goldstone Deep Space Communications Complex have adopted the position that their operating installations shall maintain a high level of compliance in regard to regulations concerning environmental hazards. An investigation carried out by Engineering Science, Inc. focused on possible underground contamination that may have resulted from leaks and/or spills from storage facilities at the Goldstone Communications Complex. It also involved the cleanup of a non-hazardous waste dumpsite at the Mojave Base Site at the Goldstone complex. The report also includes details of the management duties and responsibilities needed to maintain compliance with environmental laws and regulations.

Bengelsdorf, I.↗

The evaluative imaging of mental models - Visual representations of complexity

The paper deals with some design issues involved in building a system that could visually represent the semantic structures of training materials and their underlying mental models. In particular, hypermedia-based semantic networks that instantiate classification problem solving strategies are thought to be a useful formalism for such representations; the complexity of these web structures can be best managed through visual depictions. It is also noted that a useful approach to implement in these hypermedia models would be some metrics of conceptual distance.

Dede, Christopher↗

Lessons learned in the development of the Hubble Space Telescope software

The lessons learned in the development of the Hubble Space Telescope software are described. Those aspects of the development that were successful are discussed. Areas which in retrospective analysis could have been more efficient are identified. It is concluded that few hardware oriented project managers understand or are comfortable with software technology. Most managers overestimate the size and magnitude of the complex tasks assigned.

Harrington, Michael↗

Catalytic methods using molecular oxygen for treatment of PMMS and ECLSS waste streams, volume 2

Catalytic oxidation has proven to be an effective addition to the baseline sorption, ion exchange water reclamation technology which will be used on Space Station Freedom (SSF). Low molecular weight, polar organics such as alcohols, aldehydes, ketones, amides, and thiocarbamides which are poorly removed by the baseline multifiltration (MF) technology can be oxidized to carbon dioxide at low temperature (121 C). The catalytic oxidation process by itself can reduce the Total Organic Carbon (TOC) to below 500 ppb for solutions designed to model these waste waters. Individual challenges by selected contaminants have shown only moderate selectivity towards particular organic species. The combined technology is applicable to the more complex waste water generated in the Process Materials Management System (PMMS) and Environmental Control and Life Support System (ECLSS) aboard SSF. During the phase 3 Core Module Integrated Facility (CMIF) water recovery tests at NASA MSFC, real hygiene waste water and humidity condensate were processed to meet potable specifications by the combined technology. A kinetic study of catalytic oxidation demonstrates that the Langmuir-Hinshelwood rate equation for heterogeneous catalysts accurately represent the kinetic behavior. From this relationship, activation energy and rate constants for acetone were determined.

Akse, James R.↗

Virtually Out of This World!

Ames Research Center granted Reality Capture Technologies (RCT), Inc., a license to further develop NASA's Mars Map software platform. The company incorporated NASA#s innovation into software that uses the Virtual Plant Model (VPM)(TM) to structure, modify, and implement the construction sites of industrial facilities, as well as develop, validate, and train operators on procedures. The VPM orchestrates the exchange of information between engineering, production, and business transaction systems. This enables users to simulate, control, and optimize work processes while increasing the reliability of critical business decisions. Engineers can complete the construction process and test various aspects of it in virtual reality before building the actual structure. With virtual access to and simulation of the construction site, project personnel can manage, access control, and respond to changes on complex constructions more effectively. Engineers can also create operating procedures, training, and documentation. Virtual Plant Model(TM) is a trademark of Reality Capture Technologies, Inc.

Source record↗

Contingency Software in Autonomous Systems: Technical Level Briefing

Contingency management is essential to the robust operation of complex systems such as spacecraft and Unpiloted Aerial Vehicles (UAVs). Automatic contingency handling allows a faster response to unsafe scenarios with reduced human intervention on low-cost and extended missions. Results, applied to the Autonomous Rotorcraft Project and Mars Science Lab, pave the way to more resilient autonomous systems.

autonomous systems↗

Programs Automate Complex Operations Monitoring

Kennedy Space Center, just off the east coast of Florida on Merritt Island, has been the starting place of every human space flight in NASA s history. It is where the first Americans left Earth during Project Mercury, the terrestrial departure point of the lunar-bound Apollo astronauts, as well as the last solid ground many astronauts step foot on before beginning their long stays aboard the International Space Station. It will also be the starting point for future NASA missions to the Moon and Mars and temporary host of the new Ares series rockets designed to take us there. Since the first days of the early NASA missions, in order to keep up with the demands of the intricate and critical Space Program, the launch complex - host to the large Vehicle Assembly Building, two launch pads, and myriad support facilities - has grown increasingly complex to accommodate the sophisticated technologies needed to manage today s space missions. To handle the complicated launch coordination safely, NASA found ways to automate mission-critical applications, resulting in streamlined decision-making. One of these methods, management software called the Control Monitor Unit (CMU), created in conjunction with McDonnell Douglas Space & Defense Systems, has since left NASA, and is finding its way into additional applications.

Source record↗

A Human-in-the-Loop Evaluation of Multi-Sector Planning in Mixed Equipage Airspace (MSP III)

A human-in-the-loop (HITL) simulation was conducted in May 2010 to determine the feasibility and value 01 conducting multi-sector planning (MSP) operations in a mixed equipage environment. Aircraft were categorized as equipped or unequipped based on the presence or absence of an air-ground data communications (Data Comm) capability for receiving auto-loadable clearances and transfer of communication messages from the air navigation service provider (ANSP). The purpose of the study was to determine the feasibility and possible benefits of introducing multi-sector planning in a mixed equipage context, or whether Data Comm equipage was required for MSP operations. Each test scenario presented one of three different equipage levels to the controllers (10%, 50% or 90% equipped aircraft), so that the operational impact of different equipage levels could be observed. Operational feasibility assessment addressed two related questions: (1) are MSP operations feasible for unequipped aircraft, and (2) are they feasible in a mixed equipage context. Similarly, two categories of potential benefits were explored: (1) system performance improvements (e.g., throughput, workload) associated with MSP at different equipage levels, and (2) the possibility of providing differential service for equipage through MSP operations. Tool requirements (for both planning and controller stations), as well as planning and coordination procedures - within facility (traffic management unit/operational area) and within sector (R-Side/D-Side) - were two other topics addressed in the study. Overall, results suggested that MSP operations were feasible in a mixed equipage environment and that the tools were effective with both equipped and unequipped aircraft. Using the MSP tools, traffic management coordinators were able to manage controller task load, effectively balancing throughput with complexity and controller task load at each of the three equipage levels tested.

Smith, Nancy↗

Update - Concept of Operations for Integrated Model-Centric Engineering at JPL

The increasingly ambitious requirements levied on JPL's space science missions, and the development pace of such missions, challenge our current engineering practices. All the engineering disciplines face this growth in complexity to some degree, but the challenges are greatest in systems engineering where numerous competing interests must be reconciled and where complex system level interactions must be identified and managed. Undesired system-level interactions are increasingly a major risk factor that cannot be reliably exposed by testing, and natural-language single-viewpoint specifications areinadequate to capture and expose system level interactions and characteristics. Systems engineering practices must improve to meet these challenges, and the most promising approach today is the movement toward a more integrated and model-centric approach to mission conception, design, implementation and operations. This approach elevates engineering models to a principal role in systems engineering, gradually replacing traditional document centric engineering practices.

The Concept of Operations (ConOps)↗

Facilitating NASA Earth Science Data Processing Using Nebula Cloud Computing

Cloud Computing has been implemented in several commercial arenas. The NASA Nebula Cloud Computing platform is an Infrastructure as a Service (IaaS) built in 2008 at NASA Ames Research Center and 2010 at GSFC. Nebula is an open source Cloud platform intended to: a) Make NASA realize significant cost savings through efficient resource utilization, reduced energy consumption, and reduced labor costs. b) Provide an easier way for NASA scientists and researchers to efficiently explore and share large and complex data sets. c) Allow customers to provision, manage, and decommission computing capabilities on an as-needed bases

Pham, Long↗

Integrating Existing Simulation Components into a Cohesive Simulation System

A tradition of leveraging the re-use of components to help manage costs has evolved in the development of complex system. This tradition continues on in the Joint Polar Satellite System (JPSS) Program with the cloning of the Suomi National Polar-orbiting Partnership (NPP) satellite for the JPSS-1 mission, including the instrument complement. One benefit of re-use on a mission is the availability of existing simulation assets from the systems that were previously built. An issue arises in the continual shift of technology over a long mission, or multi-mission, lifecycle. As the missions mature, the requirements for the observatory simulations evolve. The challenge in this environment becomes re-using the existing components in that ever-changing landscape. To meet this challenge, the system must: establish an operational architecture that minimizes impacts on the implementation of individual components, consolidate the satisfaction of new high-impact requirements into system-level infrastructure, and build in a long-term view of system adaptation that spans the full lifecycle of the simulation system. The Flight Vehicle Test Suite (FVTS) within the JPSS Program is defining and executing this approach to ensure a robust simulation capability for the JPSS multi-mission environment

McLaughlin, Brian J.↗

Underestimation of Project Costs

Large projects almost always exceed their budgets. Estimating cost is difficult and estimated costs are usually too low. Three different reasons are suggested: bad luck, overoptimism, and deliberate underestimation. Project management can usually point to project difficulty and complexity, technical uncertainty, stakeholder conflicts, scope changes, unforeseen events, and other not really unpredictable bad luck. Project planning is usually over-optimistic, so the likelihood and impact of bad luck is systematically underestimated. Project plans reflect optimism and hope for success in a supposedly unique new effort rather than rational expectations based on historical data. Past project problems are claimed to be irrelevant because "This time it's different." Some bad luck is inevitable and reasonable optimism is understandable, but deliberate deception must be condemned. In a competitive environment, project planners and advocates often deliberately underestimate costs to help gain project approval and funding. Project benefits, cost savings, and probability of success are exaggerated and key risks ignored. Project advocates have incentives to distort information and conceal difficulties from project approvers. One naively suggested cure is more openness, honesty, and group adherence to shared overall goals. A more realistic alternative is threatening overrun projects with cancellation. Neither approach seems to solve the problem. A better method to avoid the delusions of over-optimism and the deceptions of biased advocacy is to base the project cost estimate on the actual costs of a large group of similar projects. Over optimism and deception can continue beyond the planning phase and into project execution. Hard milestones based on verified tests and demonstrations can provide a reality check.

Cost estimation↗

Traveler: Trustworthy Autonomy

This presentation discusses the FAA belief that this research may hold the key to enabling safe autonomous operation of vehicles.

complex systems↗

Temporal Consistency Between Gross Primary Production and Solar-Induced Chlorophyll Fluorescence in the Ten Most Populous Megacity Areas over Years

The gross primary production (GPP) of vegetation in urban areas plays an important role in the study of urban ecology. It is difficult however, to accurately estimate GPP in urban areas, mostly due to the complexity of impervious land surfaces, buildings, vegetation, and management. Recently, we used the Vegetation Photosynthesis Model (VPM), climate data, and satellite images to estimate the GPP of terrestrial ecosystems including urban areas. Here, we report VPM-based GPP (GPPvpm) estimates for the world's ten most populous megacities during 2000-2014. The seasonal dynamics of GPPvpm during 2007-2014 in the ten megacities track well that of the solar-induced chlorophyll fluorescence (SIF) data from GOME-2 at 0.5deg x 0.5deg resolution. Annual GPPvpm during 2000-2014 also shows substantial variation among the ten megacities, and year-to-year trends show increases, no change, and decreases. Urban expansion and vegetation collectively impact GPP variations in these megacities. The results of this study demonstrate the potential of a satellite-based vegetation photosynthesis model for diagnostic studies of GPP and the terrestrial carbon cycle in urban areas.

urban↗

NASA Space Network Project Operations Management: Past, Present and Future for the Tracking and Data Relay Satellite Constellation

The NASA Space Network (SN) Operations began with the launch of the first Tracking and Data Relay Satellite (TDRS-1) on April 4, 1983 with on-orbit operations conducted from the White Sands Ground Terminal (WSGT) in Las Cruces, New Mexico. Over the past 35 years, the SN has evolved to its current configuration comprised of four strategically located satellite ground stations and a constellation of ten geosynchronous Tracking and Data Relay Satellites that provide customer support 24 hours a day, 365 days per year, at an unprecedented 99.9% proficiency. The Space Network provides total global Communications, Data Relay, and Tracking services for Low Earth Orbiting (LEO) satellites, Human Space Flight, Expendable Launch Vehicles (ELV) and Scientific missions. This paper will address the Operations Management of the NASA Space Network and the complexities associated with this responsibility, as well as significant mission support highlights.

Sobchak, Ted↗

A Framework for Dynamic Architecture and Functional Allocations for Increasing Airspace Autonomy

To enable scalability of air travel for use cases such as cargo delivery, it is anticipated that future air traffic operations will involve unmanned aircraft operated by remote pilots. Of particular interest are schemes where a small number of pilots operate a large number of vehicles, mitigating high cost and pilot shortage issues. Such architectures require increased levels of automation and supervisory control modes. They also require ensuring safe operations when the command and control link to the vehicle is degraded or lost completely, rendering the vehicle autonomous. To evaluate these variable and dynamic architectures, this paper will present a framework for decomposing the functions necessary to ensure safe, orderly, and expeditious air travel, assessing the agents in the system, and classifying the levels of autonomy. Then, an example allocation to agents of roles for the function of separation assurance is presented, highlighting the dependency of the allocation on three main factors: time criticality of a potential separation violation, the ratio of pilots to vehicles, and the loss of the command and control link.

air traffic management, function allocation, auton↗

A Framework for Dynamic Architecture and Functional Allocations for Increasing Airspace Autonomy

To enable scalability of air travel for use cases such as cargo delivery, it is anticipated that future air traffic operations will involve unmanned aircraft operated by remote pilots. Of particular interest are schemes where a small number of pilots operate a large number of vehicles, mitigating high cost and pilot shortage issues. Such architectures require increased levels of automation and supervisory control modes. They also require ensuring safe operations when the command and control link to the vehicle is degraded or lost completely, rendering the vehicle autonomous. To evaluate these variable and dynamic architectures, this paper will present a framework for decomposing the functions necessary to ensure safe, orderly, and expeditious air travel, assessing the agents in the system, and classifying the levels of autonomy. Then, an example allocation to agents of roles for the function of separation assurance is presented, highlighting the dependency of the allocation on three main factors; time criticality of a potential separation violation, the ratio of pilots to vehicles, and the loss of the command and control link.

air traffic management↗