Search NASASearch

SEARCH · Search NASA

Results for “Lunar Surface Thermal Analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,614 records · Page 36

Activating magnetite ores for aqueous ironmaking at high current densities

Low-temperature electrochemical cells reducing iron oxides to metal in alkaline electrolytes can support fully electrified steelmaking processes. Previous studies on these cells have primarily focused on high-surface-area hematite, Fe 2 O 3 , reactants whereas attempts to reduce suspensions of magnetite, Fe 3 O 4 —one of the two feedstocks for existing ironmaking reactors—have generally been limited to low rates of reaction (<30 mA cm −2 ). Here, in this study, we control the crystalline domain size of Fe 2 O 3 and Fe 3 O 4 particles in 10 M NaOH electrolytes to study how the nanoscale morphology of oxides controls the rate of electrochemical ironmaking. Rotating-ring disk electrode measurements of Fe 2+ , in situ Raman spectroscopy of the electrode surface, and ex situ electron microscopy were consistent with a hypothesized passivation process at Fe 3 O 4 surfaces that may prevent the continuous formation of soluble intermediates. Sufficiently small (<100 nm diameter) oxide particles yielded Fe partial current densities >160 mA cm −2 , a fivefold increase relative to previously reported rates for Fe 3 O 4 suspensions and comparable to active Fe 2 O 3 . Electron microscopy revealed that electrodeposited films were composed of micron-scale crystalline Fe domains with a porous film of Fe 3 O 4 nanoparticles and supports a model where Fe is grown primarily from soluble Fe 2+ intermediates. Based on these insights, inactive blast-furnace-grade iron-oxides were transformed into high surface area nanoparticles (1.6 to 229.2 m 2 g −1 ) via reprecipitation, leading to a ninefold enhancement in faradaic efficiency and an Fe partial current density of 120 mA cm −2 . When integrated with chlor-iron cells producing reagents for reprecipitation, this approach could lead to a cost-competitive process for electrochemical ironmaking from industrially relevant feedstocks.

TEM

Using Open Innovation in Reducing Risk to Crews

In the exploration of destinations outside of Earth's neighborhood, specifically Mars, scientific and engineering inquiries have occurred by two means; observations from satellites and observations by landed spacecraft. Satellite observations (Mariner, MRO, Mars Odyssey, provide global-scale spatial and temporal data while landed spacecraft (Viking, Mars Pathfinder, Spirit, Opportunity, Phoenix Mars Lander) investigate highly localized areas of the surface of the planet. In preparation for human exploration, extensive knowledge of the surface and atmospheric environments should be known before the first human leaves Earth. The primary goal of performing reconnaissance on Mars on a sub-global scale is to know as much as possible about the environment to which crews will be subjected. At the current rate of launching and landing probes to Mars, it will take a very long time to understand the surface and atmospheric conditions associated with the regions where prospective crews may land. Meanwhile electronics and electrical systems are rapidly getting smaller. One can argue that to acquire the knowledge of the region, one must take hundreds, maybe thousands of measurements simultaneously. One means to perform such a task is to deploy a swarm of sensors. Such a swarm would perform an in-situ assessment of the region. Imagine a close flyby mission to Mars for example, where mini- to micro-sensors are deposited into the atmosphere over half an orbit or more. The sensors, captured by the atmospheric drag and Martian gravity slowly descend buffeted about by Martian winds and weather until they settle on the surface a great time later (think of how long dust takes to settle). As they descend they communicate a vast array of data; temperature, chemistry, pressure, radiation dose, electric or magnetic properties from a region of the planet and an individual sensor need not measure the same quantity as its neighbors. Initially, they could move at the whim of the environment but later versions could have locomotion or propulsion mechanisms. Humans wouldn't need to decide where the sensors go, the sensors do that for themselves. This is a key strength of a sensor swarm. The intelligence relies on the group not on a decision maker on earth. Real time sensor inputs direct what the swarm considers most interesting to investigate resulting in emergent behavior. We issued a $20,000 challenge to the global innovators to provide solutions as to how such a swarm could be initialized and by what protocols and methodologies by which they operate. Over 400 innovators from 49 countries took a look at the problem, with three receiving partial awards for solutions.

Mel Ferebee

Uncertainty quantification for competing failure mechanisms in unidirectionally reinforced carbon–carbon composites

Microstructure-informed finite element models play a key role in the carbon–carbon composite design process. Variability in manufacturing process parameters and experimental limitations introduce model parameter uncertainty. This study quantifies the effect of model parameter uncertainty on transverse tensile fracture behavior and proposes a methodology to predict the failure mode based on competing microscale damage mechanisms. Finite element simulations incorporate fiber–matrix interface debonding with cohesive zones and matrix damage with a smeared crack band approach in a unidirectional carbon–carbon composite. Results from a variance-based global sensitivity analysis identifies interfacial and matrix damage parameters as the primary source of variability in fracture behavior. Sobol’ indices indicate that matrix and cohesive zone strengths contribute 94% of the variance in the effective ultimate stress. A local analysis elucidates the relationship between these constituent strength parameters and failure mode by estimating the probability of cohesive, matrix, and mixed-mode dominated failure. Based on the results for 4000 simulations, 93% exhibit mixed-mode or interfacial dominated failure, which underscores the crucial role of fiber–matrix interface debonding in the transverse tensile failure of carbon–carbon composites. These uncertainty quantification results facilitate more efficient model calibration and provide a framework for microstructure-informed failure predictions in the face of manufacturing-induced uncertainty.

36 MATERIALS SCIENCE

Battery cell thermal-conductive coating increases efficiency

Thin coating of high-temperature epoxy resin provides necessary electrical insulation, as well as good thermal conductivity between battery cells. Insulation increases efficiency of nickel-cadmium battery, as it would any multicell battery assembly in which cell-to-cell thermal balance is critical.

Doyle, H. M.

Thermal Vacuum Testing of the Cryostat Heat Removal System for COSI SMEX

The Cryostat Heat Removal System (CHRS) of the Compton Spectrometer and Imager (COSI) consists of cryocooler, three transport aluminum ammonia Constant Conductance Heat Pipes (CCHP), three radiators with CCHP spreaders and Cryocooler Control Electronics (CCE) attached to a separate radiator. A Thermal Vacuum (TVAC) test was conducted at NASA Goddard Space Flight Center to characterize the integrated COSI CHRS in the flat configuration. This presentation summarizes the measured COSI CHRS performance along with lessons learned.

Pipes

Transit Thermal Control Design for Galileo Entry Probe for Planet Jupiter

A totally passive design was completed for the thermal control of the Galileo entry probe during its transit to the planet Jupiter. The design utilizes radio isotope heater units, multilayer insulation blankets and a thermal radiator in conjunction with a design conductance support structure to achieve both the required storage and critical initial planet atmosphere entry temperatures. The probe transit thermal design was completed and verified based on thermal vacuum testing of a prototype probe thermal test model.

George C. Haverly

Development and Validation of a High-Vacuum Thermal Conductivity Testbed for Aerospace Interface Materials

Thermal Interface Materials (TIMs) are critical components in spacecraft thermal management systems, where thermal performance is strongly influenced by vacuum conditions, interface contact resistance, and layered metallic joint behavior. However, manufacturer-reported thermal conductivity values are often derived under idealized conditions and may not accurately represent performance within operational aerospace applications. To address this limitation, the Testbed for Advanced Interface Materials in Vacuum (TAIMV) was developed as a modular vacuum-compatible thermal conductivity characterization platform capable of evaluating aerospace-relevant TIM configurations under both ambient and high-vacuum environments. The testbed was derived from the ASTM C1044-16 guarded hot plate methodology and incorporates interchangeable layers of stainless steel coupon geometries, independently controlled main and guard heaters, embedded resistance temperature detectors (RTDs), thermocouples, multi-layer insulation (MLI), and a temperature-controlled cold plate to characterize through-thickness thermal gradients across layered interfaces. In the current configuration, interface compression is limited to the nominal contact pressure generated by the experimental stack assembly. Initial experimental campaigns were conducted at ambient pressure and below 1×10-5 torr for vacuum cases using multiple interface materials including Braycote 601EF and Krytox-based greases across a range of thermal operating conditions. In parallel, a coupled numerical Python thermal model was developed to predict temperature distribution throughout the stack while accounting for conduction, radiation, and parasitic heat transfer pathways and effective interface resistance effects. Experimental measurements and numerical predictions showed consistent thermal trends across multiple operating conditions and environmental states. Results also revealed measurable differences between ambient and vacuum thermal behavior, demonstrating the importance of interface resistance, parasitic heat transfer mechanisms, and stack geometry in determining effective thermal performance within layered thermal interfaces. The presented work establishes a foundation for future thermal model correlation efforts and expanded characterization of aerospace thermal interface materials under representative environmental conditions. Future work will focus on the integration of a load cell system to enable controlled pressure-dependent characterization of thermal interface materials under compressive loading. This capability will allow investigation of the influence of contact pressure on effective thermal conductivity, interface resistance, and thermal performance within layered aerospace thermal interfaces under representative operational conditions.

Thermal Development Testing

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI