Status Update of a Harmonic Kicker Development for JLEIC
The Jefferson Lab Electron-Ion Collider (JLEIC) is an asymmetric high luminosity ring-ring collider proposed as the next major R&D facility for the nuclear physics community. Both of JLEIC?s electron and ion collider rings have high beam current with gaps serving the pur-poses of beam abort, ion clearing, etc. Those gaps will cause time-varying beam loading in the storage RF cavi-ties, and may result in modulation of cavity RF phase/voltage and cyclic shift of collision point, which could lead to significant luminosity loss. We studied a few approaches to mitigate the RF phase modulation and IP shift, such as correcting the RF phase/voltage modula-tion with traditional LLRF feedback, one-turn feedback (OTFB), or RF feedforward (FF); optimizing the bunch fill pattern to limit the RF phase/voltage modulation to a small fraction of the bunch trains in the collider ring; or matching the RF phase modulation in the two rings. The preliminary results are discussed in this paper.