Search NASA⌕ Search

SEARCH · Search NASA

Results for “Power Purchasing Agreements”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Use of a Geothermal-Solar Hybrid Power Plant to Mitigate Declines in Geothermal Resource Productivity

Many, if not all, geothermal resources are subject to decreasing productivity manifested in the form of decreasing brine temperature, flow rate, or both during the life span of the associated power generation project. The impacts of resource productivity decline on power plant performance can be significant; a reduction in heat input to a power plant not only decreases the thermal energy available for conversion to electrical power, but also adversely impacts the power plant conversion efficiency. The reduction in power generation is directly correlated to a reduction in revenues from power sales. Further, projects with Power Purchase Agreement (PPA) contracts in place may be subject to significant economic penalties if power generation falls below the default level specified. A potential solution to restoring the performance of a power plant operating from a declining productivity geothermal resource involves the use of solar thermal energy to restore the thermal input to the geothermal power plant. There are numerous technical merits associated with a renewable geothermal-solar hybrid plant in which the two heat sources share a common power block. The geo-solar hybrid plant could provide a better match to typical electrical power demand profiles than a stand-alone geothermal plant. The hybrid plant could also eliminate the stand-alone concentrated solar power plant thermal storage requirement for operation during times of low or no solar insolation. This paper identifies hybrid plant configurations and economic conditions for which solar thermal retrofit of a geothermal power plant could improve project economics. The net present value of the concentrated solar thermal retrofit of an air-cooled binary geothermal plant is presented as functions of both solar collector array cost and electricity sales price.

14 SOLAR ENERGY↗

TidGen Power System Commercialization Project

ORPC Maine, LLC, a wholly-owned subsidiary of Ocean Renewable Power Company, LLC (collectively ORPC), submits this Final Technical Report for the TidGen® Power System Commercialization Project (Project), partially funded by the U.S. Department of Energy (DE-EE0003647). The Project was built and operated in compliance with the Federal Energy Regulatory Commission (FERC) pilot project license (P-12711) and other permits and approvals needed for the Project. This report documents the methodologies, activities and results of the various phases of the Project, including design, engineering, procurement, assembly, installation, operation, licensing, environmental monitoring, retrieval, maintenance and repair. The Project represents a significant achievement for the renewable energy portfolio of the U.S. in general, and for the U.S. marine hydrokinetic (MHK) industry in particular. The stated Project goal was to advance, demonstrate and accelerate deployment and commercialization of ORPC’s tidal-current based hydrokinetic power generation system, including the energy extraction and conversion technology, associated power electronics, and interconnection equipment capable of reliably delivering electricity to the domestic power grid. ORPC achieved this goal by designing, building and operating the TidGen® Power System in 2012 and becoming the first federally licensed hydrokinetic tidal energy project to deliver electricity to a power grid under a power purchase agreement in North America. Located in Cobscook Bay between Eastport and Lubec, Maine, the TidGen® Power System was connected to the Bangor Hydro Electric utility grid at an on-shore station in North Lubec on September 13, 2012. ORPC obtained a FERC pilot project license for the Project on February 12, 2012 and the first Maine Department of Environmental Protection General Permit issued for a tidal energy project on January 31, 2012. In addition, ORPC entered into a 20-year agreement with Bangor Hydro Electric Company on January 1, 2013 for up to 5 megawatts at a price of $215/MWh, escalating at 2.0% per year.

16 TIDAL AND WAVE POWER↗

SAM™ (System Advisor Model™) [SWR-16-02, SWR-10-13]

See the SAM™ website to build a desktop version of the National Laboratory of the Rockies' (NLR's) System Advisor Model™ (SAM). https://sam.nlr.gov/ The System Advisor Model™ (SAM™) is a free techno-economic software model that facilitates decision-making for people in the renewable energy industry: -Project managers and engineers -Policy analysts -Technology developers -Researchers SAM can model many types of renewable energy systems: -Photovoltaic systems, from small residential rooftop to large utility-scale systems -Battery storage with Lithium ion, lead acid, or flow batteries for front-of-meter or behind-the-meter applications -Concentrating Solar Power systems for electric power generation, including parabolic trough, power tower, and linear Fresnel -Industrial process heat from parabolic trough and linear Fresnel systems -Wind power, from individual turbines to large wind farms -Marine energy wave and tidal systems -Solar water heating -Fuel cells -Geothermal power generation -Biomass combustion for power generation -High concentration photovoltaic systems SAM's financial models are for the following types of projects: -Residential and commercial projects where the renewable energy system is on the customer side of the electric utility meter (behind the meter), and power from the system is used to reduce the customer's electricity bill. -Power purchase agreement (PPA) projects where the system is connected to the grid at an interconnection point, and the project earns revenue through power sales. The project may be owned and operated by a single owner or by a partnership involving a flip or leaseback arrangement. -Third party ownership where the system is installed on the customer's (host) property and owned by a separate entity (developer), and the host is compensated for power generated by the system through either a PPA or lease agreement. For a more detailed description of SAM, see Blair et al. (2018), System Advisor Model (SAM) General Description (Version 2017.9.5), NREL/TP-6A20-70414. https://www.nrel.gov/docs/fy18osti/70414.pdf

Ryberg, David↗

Concentrating Solar Panels: Bringing the Highest Power and Lowest Cost to the Rooftop

Soliant Energy is a venture-capital-backed startup focused on bringing advanced concentrating solar panels to market. Our fundamental innovation is that we are the first company to develop a racking solar concentrator specifically for commercial rooftop applications, resulting in the lowest LCOE for rooftop electricity generation. Today, the commercial rooftop segment is the largest and fastest-growing market in the solar industry. Our concentrating panels can make a major contribution to the SAI's objectives: reducing the cost of solar electricity and rapidly deploying capacity. Our commercialization focus was re-shaped in 2009, shifting from an emphasis solely on panel efficiency to LCOE. Since the inception of the SAI program, LCOE has become the de facto standard for comparing commercial photovoltaic systems. While estimation and prediction models still differ, the emergence of performance-based incentive (PBI) and feed-in tariff (FIT) systems, as well as power purchase agreement (PPA) financing structures make LCOE the natural metric for photovoltaic systems. Soliant Energy has designed and demonstrated lower-cost, higher-power solar panels that consists of 6 (500X) PV module assemblies utilizing multi-junction cells and an integrated two-axis tracker. In addition, we have designed and demonstrated a prototype 1000X panel assembly with 8. Cost reductions relative to conventional flat panel PV systems were realized by (1) reducing the amount of costly semiconductor material and (2) developing strategies and processes to reduce the manufacturing costs of the entire system. Performance gains against conventional benchmarks were realized with (1) two-axis tracking and (2) higher-efficiency multi-junction PV cells capable of operating at a solar concentration ratio of 1000X (1000 kW/m2). The program objectives are: (1) Develop a tracking/concentrating solar module that has the same geometric form factor as a conventional flat, roof mounted photovoltaic (PV) panel - the Soliant module will produce more power and cost less than conventional panels of the same size; (2) Target LCOE: $0.079/kWh in 2010; (3) Target efficiency - 26% in 2010 (22% for 2008 prototype, 24% for 2009 pilot); and (4) Target performance - equivalent to 650Wp in 2010 (490W for 2008 prototype, 540W for 2009 pilot).

14 SOLAR ENERGY↗

Solar PV Project Financing: Regulatory and Legislative Challenges for Third-Party PPA System Owners

Residential and commercial end users of electricity who want to generate electricity using on-site solar photovoltaic (PV) systems face challenging initial and O&M costs. The third-party ownership power purchase agreement (PPA) finance model addresses these and other challenges. It allows developers to build and own PV systems on customers? properties and sell power back to customers. However, third-party electricity sales commonly face five regulatory challenges. The first three challenges involve legislative or regulatory definitions of electric utilities, power generation equipment, and providers of electric services. These definitions may compel third-party owners of solar PV systems to comply with regulations that may be cost prohibitive. Third-party owners face an additional challenge if they may not net meter, a practice that provides significant financial incentive to owning solar PV systems. Finally, municipalities and cooperatives worry about the regulatory implications of allowing an entity to sell electricity within their service territories. This paper summarizes these challenges, when they occur, and how they have been addressed in five states. This paper also presents alternative to the third-party ownership PPA finance model, including solar leases, contractual intermediaries, standardized contract language, federal investment tax credits, clean renewable energy bonds, and waived monopoly powers.

14 SOLAR ENERGY↗

Revisiting the Long-Term Hedge Value of Wind Power in an Era of Low Natural Gas Prices

Expanding production of the United States’ vast shale gas reserves in recent years has put the country on a path towards greater energy independence, enhanced economic prosperity, and (potentially) reduced emissions of greenhouse gases and other pollutants. The corresponding expansion of gas-fired generation in the power sector – driven primarily by lower natural gas prices – has also made it easier and cheaper to integrate large amounts of variable renewable generation, such as wind power, into the grid. At the same time, however, low natural gas prices have suppressed wholesale power prices across the nation, making it harder for wind and other renewable power technologies to compete on cost alone – even despite their recent cost and performance improvements. A near-term softening in policy-driven demand from state-level renewable energy mandates, coupled with a possible phase-out of a key federal tax incentive over time, may exacerbate wind’s challenge in the coming years. As wind power finds it more difficult to compete with gas-fired generation on the basis of near-term cost, it will increasingly need to rely on other attributes, such as its “portfolio” or “hedge” value, as justification for inclusion in the power mix. This article investigates the degree to which wind power can still serve as a cost-effective hedge against rising natural gas prices, given the significant reduction in gas prices in recent years, coupled with expectations that prices will remain low for many years to come. It does so by drawing upon a rich sample of long-term power purchase agreements (“PPAs”) between existing wind generators and electric utilities in the U.S., and comparing the contracted prices at which utilities will be buying wind power from these existing projects for decades to come to a variety of long-term projections of the fuel costs of gas-fired generation modeled by the Energy Information Administration (“EIA”).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Methods of integrating a high penetration photovoltaic power plant into a micro grid.

The island of Lanai is currently one of the highest penetration PV micro grids in the world, with the 1.2 MWAC La Ola Solar Farm operating on a grid with a peak net load of 4.7 MW. This facility interconnects to one of Lanai's three 12.47 kV distribution circuits. An initial interconnection requirements study (IRS) determined that several control and performance features are necessary to ensure safe and reliable operation of the island grid. These include power curtailment, power factor control, over/under voltage and frequency ride through, and power ramp rate limiting. While deemed necessary for stable grid operation, many of these features contradict the current IEEE 1547 interconnection requirements governing distributed generators. These controls have been successfully implemented, tested, and operated since January 2009. Currently, the system is producing power in a curtailed mode according to the requirements of a power purchase agreement (PPA).

14 SOLAR ENERGY↗

Status and Trends in the Voluntary Market (2018 Data)

Green power refers to renewable electricity voluntarily purchased by retail electricity customers. Renewable energy sources for green power include solar, wind, biomass, geothermal, and small-scale hydropower. This report summarizes data on the various ways in which voluntary purchasers - including residential, commercial, and institutional customers - purchase green power. We summarize key historic trends in U.S. voluntary green power markets and the current status of green power sales through seven products: utility green pricing programs, utility renewable contracts, competitive suppliers, unbundled renewable energy certificates, community choice aggregations, power purchase agreements, and community solar.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Status and Trends in the U.S. Voluntary Green Power Market (2017 Data)

Green power refers to renewable electricity voluntarily purchased by retail electricity customers. Renewable energy sources for green power include solar, wind, biomass, geothermal, and small-scale hydropower. This report summarizes data on the various ways in which voluntary purchasers - including residential, commercial, and institutional customers - purchase green power. We summarize key historic trends in U.S. voluntary green power markets and the current status of green power sales through seven products: utility green pricing programs, utility renewable contracts, competitive suppliers, unbundled renewable energy certificates, community choice aggregations, power purchase agreements, and community solar.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Status and Trends in the Voluntary Market (2021 Data)

Green power refers to renewable electricity voluntarily purchased by retail electricity customers. Renewable energy sources for green power include solar, wind, biomass, geothermal, and small-scale hydropower. This report summarizes data on the various ways in which voluntary purchasers including residential, commercial, and institutional customers purchase green power. We summarize key historic trends in U.S. voluntary green power markets and the current status of green power sales through seven products: utility green pricing programs, utility renewable contracts, competitive suppliers, unbundled renewable energy certificates, community choice aggregations, and power purchase agreements. It includes discussion of how the voluntary market may impact the grid.

ENERGY PLANNING, POLICY, AND ECONOMY↗

Navigating Integration: Key Challenges for Data Centers, Nuclear Stakeholders, and Utility Operators

he exponential growth of data centers—driven by artificial intelligence and cloud computing—is reshaping the U.S. energy landscape, presenting urgent challenges and transformative opportunities for data center developers, nuclear energy providers, and utility operators. As data centers are projected to consume up to 12% of U.S. electricity by 2028, stakeholders must address rapid deployment needs, grid congestion, and the demand for reliable, high-quality power. This presentation explores the multifaceted barriers to integrating data centers with nuclear and utility infrastructure, including land use constraints, public perception, regulatory complexity, and workforce alignment. It highlights the distinct priorities and operational cultures of each sector, and the friction that arises from misaligned planning horizons and risk tolerances. We examine collaborative strategies such as co-siting, hybrid power-purchase agreements, unified community engagement, and innovative financing models.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Status and Trends in the U.S. Voluntary Green Power Market (2021 Data)

This data book provides certain data behind figures and tables found in the NREL presentation "Status and Trends in the Voluntary Market (2021 Data)." These data reflect estimates based on the best available data. Excluded Data This data book excludes data for certain figures using confidential survey data or purchased data for which NREL does not own the rights. In particular, renewable energy certificate (REC) price data are not included in this data book Rounding: Some estimates may be slightly inconsistent across tabs due to estimate rounding Citation for the data: E. O'Shaughnessy and J. Heeter. 2022. Status and Trends in the Voluntary Market. Golden, CO: NREL. For more information: contact Jenny Heeter (jenny.heeter@nrel.gov). For more information on voluntary green power markets see NREL's resources at https://www.nrel.gov/analysis/green-power.html. Acronyms CCA Community choice aggregation MWh Megawatt hour PPA Power purchase agreement RECs Renewable energy certificate

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Environmental mercantilism: how Not to meet America's renewable energy targets

Our ambitious renewables objectives can be met - without exposing ratepayers to cost overruns - but only if we harness the best of regulation and competition. An open and competitive process, leading to long-term power purchasing agreements, overseen by state and federal regulators, can get the job done. (author)

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Optimizing the physical design and layout of a resilient wind, solar, and storage hybrid power plant

We report as wind and solar technologies improve and their costs decrease, the share of power produced by these sources will increase. As the market penetration increases, these power sources will need to provide grid services, such as dispatchability, in addition to providing energy. One way to reduce variability, provide higher quality power to the grid, and address local grid stability issues is through colocating wind and solar power plants. In addition to operating reliably during normal operating conditions, in scenarios with high penetrations of renewable generation, it is important that these hybrid plants can withstand production disruptions and continue to supply power despite prolonged resource reduction, extreme weather events, or other disruptions. In this paper, we present a methodology to optimize a wind-solar-battery hybrid power plant down to the component level that is resilient against production disruptions and that can continually produce some minimum required power. We introduce the models and assumptions we used to simulate a hybrid power plant as well as the design variable parameterization and specific methods we used to optimize the plant. We demonstrate the performance of our method by comparing a plant optimized for different objectives, generation outage durations, minimum power requirements, and power purchase agreements. Although the plant design is sensitive to model parameters and various other assumptions, our results demonstrate some of the optimal designs that occur in different scenarios and what one should expect when designing a hybrid wind-solar-storage power plant.

14 SOLAR ENERGY↗

Financing Microgrids in the Federal Sector

Recent high-impact events such as hurricanes and wildfires highlight the need for energy system resilience. One potential impact of these events is the loss of utility grid power to federal sites, negatively affecting the ability to carry out their missions. Depending on the need to sustain critical functions, it may be important to continue operations during an outage of the electric grid, or at least have power restored quickly after the event. One approach to addressing this need is through a microgrid. Microgrids can provide a more reliable solution than the traditional approach of using a backup generator at individual buildings. A microgrid can enhance a site’s electrical power system during normal operations, as well as provide reliable backup power to critical loads when electric utility power is interrupted. Many times, certain components of a microgrid (and potentially the entire system) can be justified economically and paid for out of energy savings or avoided costs. In cases where savings can cover the project costs, one of several privately financed procurement mechanisms may be used to implement the project. Procurement options available to all federal agencies include utility energy services contracts (UESC), energy savings performance contracts (ESPC), and utility services contracts (USC); other mechanisms such as a power purchase agreement (PPA), enhanced use lease (EUL), and utility privatization (UP) may also be useful to agencies that have the authority to use them. Implementing a microgrid in a comprehensive effort that also includes energy efficiency can provide an important savings component, while reducing power requirements for critical loads, thus reducing the cost of the microgrid and associated distributed energy resources (DER). However, it can be difficult to achieve enough savings and avoided costs to cover the entire microgrid system, so leveraging these avoided costs in combination with appropriated funds may be necessary to implement the full project. When a site is deciding if a microgrid is the best solution, activities early in the process include identifying critical loads and existing DERs, conversations with the local electric utility, and implementation options that work best for the agency and site. This paper explores procurement options and agreements that may be useful to federal agencies interested in implementing microgrids at their sites. Microgrid complexities, implementation considerations, and suggestions to get started are also discussed. This information will be most useful to agencies when they are exploring electric energy system resilience options and/or considering different procurement options to meet their needs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Preliminary Analysis of Nuclear-Powered Data Center Scenarios

This report provides a comprehensive analysis of the potential for nuclear energy to meet the growing energy demands of data centers (DCs). It evaluates the technical, economic, and socio-environmental implications of coupling Nuclear Power Plants (NPPs) with DCs, providing initial responses to several key research questions: What is the potential increased energy demand from DCs in the U.S., in the short, medium and long term? The U.S. is experiencing a rapid increase in energy demand from DCs, with projections indicating a total increase of 24-74 GWy(e) by 2028. Meeting this demand with nuclear energy would require 27–85 GWe of installed capacity. While this surge is expected to slow in the long term, the DC industry needs reliable, scalable, and clean energy sources. How much nuclear capacity can be deployed to meet DC demand and in which timeframe? Several pathways for increasing nuclear capacity were identified, including uprates, restarts of recently retired reactors, power purchase agreements with existing fleet, and new construction. Approximately 20‒28 GWe of nuclear capacity could be dedicated to DCs by the early 2030s. How much High Assay Low Enriched Uranium (HALEU) would be needed to support some nuclear deployment scenarios for DCs? Meeting the deployment targets announced by Google and Amazon for the Kairos Power Fluoride-Salt-Cooled High-Temperature Reactor or KP-FHR (~500 MWe by 2035) and the Xe-100 (~1 GWe by 2040), respectively, requires ramping up 19.75% enriched HALEU production to ~6 t/yr by 2040. What types of nuclear energy/DC coupling options exist, and what are the different benefits/challenges? Five coupling options were analyzed, ranging from grid-connected configurations to colocated, behind-the-meter setups. Key design considerations include the proximity to high- and/or medium-voltage transmission lines, the desired internal fault tolerance, and the sources of alternative/backup power during outages. Each coupling option offers unique benefits and challenges in terms of reliability, system costs, regulation, timeline, etc. A list of NPP/DC deployment scenarios was developed, considering existing or newly built NPP or DC projects. Colocated DCs with new small modular reactors or large reactors on greenfield and brownfield sites are the focus of this report. What types of reactors, especially what size, may be incentivized by DCs? Reactor sizing optimization revealed that the ideal reactor size and number of units depend on DC demand, coupling configurations defined in this report, and other economic factors. Larger reactors are preferred for high-demand DCs and grid-connected systems, while larger number of smaller reactors are better suited for DC configurations without grid backup. Which sites may be compatible with co-located nuclear-powered DCs? Siting those projects is a complicated evaluation factoring local water resources, grid connection availability and reliability, IT infrastructure, local work force, proximity to population zones, etc. For this effort greenfield and brownfield sites such as retired coal-fired plants were used to evaluate this question. This evaluation is not meant to recommend any particular site but it highlights key siting criteria and demonstrates large-scale site availability. What are the socio-economic impacts of co-located nuclear-powered DCs? Those projects generate substantial economic benefits to the local economy, particularly in urban settings. Hyperscale DCs colocated with nuclear power plants (sized around 1 GW of power) can create nearly 1,700 jobs for annual operations and more than 7,300 jobs among the supply chain and local businesses as a result of increased household spending. Rural projects also provide significant benefits, but at lower magnitudes compared to urban deployments.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

EverGREEN 2045: An Energy Mix to Decarbonize Washington State

Washington State’s future resource mix is likely to be comprised of intermittent renewables and carbon-free generation including hydropower by 2045. Generation will likely be comprised of wind, solar photovoltaic (PV), batteries, pumped storage hydropower (PSH), existing nuclear power plants, and potentially enhanced geothermal systems and advanced nuclear reactor technologies. To assess the cost and stability of the future resource mix, we partner with X-energy (advanced reactor design) and AltaRock Energy (enhanced geothermal system) for proprietary cost data. After estimating the costs of these two new technologies, we design plausible future resource mix scenarios to meet Washington State’s Clean Energy Transformation Act which transitions the state to carbon-free generation by 2045. We assess the cost and stability of the future resource mix with power system analysis tools, finding revenues are sufficient to cover variable operating and maintenance costs for most technologies providing power in 2030 and 2045, but capacity payments or power purchase agreements will likely be necessary for flexible resources, including enhanced geothermal systems and advanced nuclear reactors, to participate in the future resource mix.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Land-Based Wind Market Report: 2021 Edition

The U.S. Department of Energy's 2021 edition of its land-based wind market report provides an overview of key trends in the U.S. wind power market, with a focus on 2020. You can find a report, data file and presentation on the Files tab, below. Additionally, several data visualizations are available on the Visualizations tab. Highlights of this year’s update include: -Wind comprises a growing share of electricity supply: U.S. wind power capacity grew at a record pace in 2020, with 25 billion dollars invested in 16.8 GW of capacity. Wind energy output rose to account for more than 8% of the entire nation’s electricity supply, and is more than 20% in 10 states. At least 209 GW of wind are seeking transmission interconnection; 61 GW of this capacity are offshore wind and 13 GW are hybrid plants that pair wind with storage or PV. -Wind project performance has increased over time: The average capacity factor among recently built projects was over 40%, considerably higher than projects built earlier. The highest capacity factors are seen in the interior ‘wind belt’ of the country. -Turbines continue to get larger: Improved plant performance has been driven by larger turbines mounted on taller towers and featuring longer blades. In 2010, no turbines employed blades that were 115 meters in diameter or larger, but in 2020, 91% of newly installed turbines featured such rotors. Proposed projects indicate that total turbine height will continue to rise. -Low wind turbine pricing has pushed down installed project costs over the last decade: Wind turbine prices are averaging 775–850 dollars/kW. The average installed cost of wind projects in 2020 was 1,460 dollars/kW, down more than 40% since the peak in 2010, though stable for the last three years. The lowest costs were found in Texas and the (non-ISO) West. -Wind energy prices remain low, around 20 dollars/MWh in the interior of the country: After topping out at 70 dollars/MWh for power purchase agreements (PPAs) executed in 2009, the national average price of wind PPAs has dropped. In the interior ‘wind belt’ of the country, recent pricing is around 20 dollars/MWh. In the West and East, prices tend to average 30 dollars/MWh or more. These prices, which are possible in part due to federal tax support, fall below the projected future fuel costs of gas-fired generation. -Wind PPA prices are often attractive compared to wind’s grid-system market value: The value of wind in wholesale power markets is affected by the location of wind plants, their hourly output profiles, and how those characteristics correlate with real-time electricity prices and capacity markets. The market value of wind declined in 2020, following natural gas prices lower and averaging under 15 dolalrs/MWh in ERCOT, MISO, NYISO and SPP; higher values were seen in CAISO, ISO-NE and PJM. -The average levelized cost of wind energy is down to 33 dollars/MWh: Levelized costs, which exclude the impacts of federal tax incentives, vary across time and geography, but the national average stood at 33 dollars/MWh in 2020—down substantially historically, though consistent with the previous two years. Levelized costs were lowest in ERCOT, SPP, and the (non-ISO) West. -The health and climate benefits of wind in 2020 were larger than its grid-system value, and the combination of all three far exceeds the current levelized cost of wind: Wind generation reduces power-sector emissions of carbon dioxide, nitrogen oxides, and sulfur dioxide. These reductions, in turn, provide public health and climate benefits that vary regionally, but together are economically valued at an average of 76 dollars/MWh-wind nationwide in 2020. -The domestic supply chain for wind equipment is diverse: For wind projects recently installed in the U.S., domestically manufactured content is highest for nacelle assembly (>85%), towers (60-75%), and blades and hubs (30-50%), but is much lower for most components internal to the nacelle.

17 WIND ENERGY↗