Search NASA⌕ Search

SEARCH · Search NASA

Results for “Transmission Line”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Understanding the impact of an applied axial magnetic field on efficient current coupling on the Z machine

Magnetized liner inertial fusion (MagLIF) is an attractive concept for producing thermonuclear fusion reactions. The MagLIF platform involves the operation of Helmholtz coils to apply a 15 Tesla axial magnetic field to the load region, where a cylindrical, fuel-filled metal liner is imploded by a ∼ 2 0 MA current pulse. The fringe field from these coils extends into the transmission line that delivers the current to the target. We investigated the extent to which this applied field disturbs the nominal power flow within that transmission line. A simplified model of the geometry shows that adding the applied magnetic field results in magnetic field lines that connect the cathode to the anode, suggesting electrons may not be magnetically insulated in this region. Particle-in-cell simulations indicated the addition of the applied magnetic field would not significantly impact the current delivery to the load. Velocimetry was used to experimentally assess the current delivery with and without the applied magnetic field. We find no measurable effects of the applied field on current delivery in the configuration investigated in this study. Published by the American Physical Society 2024

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

State Spotlight on Resilience: The Washington Utilities and Transportation Commission’s Wildfire Mitigation Plans

Wildfires present a significant risk to critical infrastructure, endangering energy systems by damaging transmission lines and imposing a variety of costs on utilities and their customers. Wildfires have increased nationally in both extent and intensity as vegetation conditions become drier and wind patterns become more turbulent. Aging infrastructure may also cause transmission lines to ignite vegetation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Exploring Wildfire & Energy data toward State Prioritization Index (WESPI)

Energy infrastructure can both induce and suffer risks from wildfires ranging from direct damage to energy assets such as substations and power lines to Public Safety Power Shutoffs. Recent wildfire events underscore the need for data-driven approaches that help states and utilities proactively plan for wildfire risk. Existing national tools such as Federal Emergency Management Agency (FEMA)’s National Risk Index (NRI) are valuable for community hazard planning. However, they are less suited for energy infrastructure, as they emphasize population and building exposure rather than system vulnerabilities. In this paper, we explore relationships between energy and wildfire data and present a Wildfire-Energy State Prioritization Index (WESPI). Our methodology combines data from the US Forest Service’s Fire Simulation (FSIM) dataset with energy resilience metrics, historical fire incidents, and geospatial data on transmission lines and fire stations. Correlation analyses suggest that FSIM burn probability is more strongly associated with power outage metrics (ρ = 0.32) than NRI wildfire frequency, and counties with a greater density of fire stations experience more frequent, but less intense wildfires. We further leverage data for burn probability, transmission line density, and fire station density to develop a Wildfire-Energy State Prioritization Index (WESPI) to highlight counties where wildfire hazard, infrastructure exposure, and limited suppression capacity converge. The index provides a consistent, scalable framework for state energy offices and utilities to screen counties for vegetation management, optimization of outage management system deployment, and to inform wildfire mitigation plans.

Critical infrastructure↗

Multi-parametric analysis for mixed integer linear programming: An application to transmission upgrade and congestion management

Upgrading the capacity of existing transmission lines is essential for meeting the growing energy demands, facilitating the integration of renewable energy, and ensuring the security of the transmission system. This study focuses on the selection of lines whose capacities and by how much should be expanded from the perspective of the Independent System Operators (ISOs) to minimize the total system cost. We employ advanced multi-parametric programming and an enhanced branch-and-bound algorithm to address complex mixed-integer linear programming (MILP) problems, considering multi-period time constraints and physical limitations of generators and transmission lines. To characterize the various decisions in transmission expansion, we model the increased capacity of existing lines as parameters within a specified range. This study first relaxes the binary variables to continuous variables and applies the Lagrange method and Karush-Kuhn-Tucker (KKT) conditions to obtain optimal solutions and identify critical regions associated with active and inactive constraints. Moreover, we extend the traditional branch-and-bound (B&B) method by determining the problem’s upper and lower bounds at each node of the B&B decision tree, helping to manage computational challenges in large-scale MILP problems. Here, we compare the difference between the upper and lower bounds to obtain an approximate optimal solution within the decision-makers’ tolerable error range. In addition, the first derivative of the objective function on the parameters of each line is used to inform the selection of lines for easing congestion and maximizing social welfare. Finally, the capacity upgrades are selected by weighing the reductions in system costs against the expense of upgrading line capacities. The findings are supported by numerical simulations and provide transmission-line planners with decision-making guidance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluating pulse-shaping capabilities of next-generation pulsed power architectures

This project evaluated the pulse shaping capabilities of next-generation pulsed power (NGPP) architectures. NGPP architectures share several common attributes including multiple independent pulse-generation lines, a radial water-insulated impedance transformer, and a central vacuum insulated load region. A multi-module circuit model was developed, incorporating independent pulse-generation lines and a 2-D transmission line mesh of the radial impedance transformer to assess the effects of azimuthal asymmetry in pulse-shaped experiments. Circuit model simulations demonstrated that NGPP architectures are able to produce the the desired current pulse shapes for exemplar NGPP experiments. Additionally, the project explored automated methods for experiment design, including derivative -ree optimization and machine learning. Pulse-shaped experiments require designers to determine machine parameters that reliably produce the desired current pulse at the load, a process that typically relies on expert knowledge and iterative adjustments using the Z circuit model. Given the increased complexity of NGPP systems, this manual approach may be impractical. While the evaluated methods do not eliminate the need for manual iteration, they can reduce the time required for experiment design. Derivative-free optimization automates much of the trial-and-error process, providing a close starting point for manual adjustments or making small modifications to near-final designs. Meanwhile, deep neural network methods can generate a good qualitative match to the desired current pulse in under one second without requiring circuit model simulations.

42 ENGINEERING↗

Cooperative Transmission Expansion Planning Experiment Data and Results

GO WEST is an open-source power grid modeling framework for U.S. Western Interconnection, which allows users to tailor the model depending on their research study and science questions. It covers 28 balancing authorities (BA) and 12 states in U.S. Western Interconnection. GO WEST allows users to select different number of nodes and come up with a simplified network by utilizing 10,000 nodal topology of U.S. Western Interconnection created by Texas A&M University. Users can try and select different number of nodes, mathematical formulations (linear programming vs. mixed-integer linear programming), transmission line limit scaling factors, and hurdle rate scaling factors. GO WEST offers a unit commitment and economic dispatch (UC/ED) module to simulate grid operations on an hourly scale. In this sense, users can calibrate and validate their model versions by comparing model outputs to historical datasets. TEP is an open-source transmission capacity expansion model, built on GO WEST framework. It utilizes linear programming to optimize transmission capacity addition investment on existing lines within GO WEST framework. In this sense, TEP model only increases the thermal capacity of existing transmission lines and does not add new lines to the system, which leaves the topology preserved. TEP minimizes the total cost of the system which comprises the operational cost of satisfying electricity demand (i.e., generation cost), cost of loss of load (i.e., unserved energy), cost of power flow, and cost of new transmission capacity additions (i.e., investment cost). In order to use TEP model, users need to create scenarios with GO WEST framework. In this analysis, outputs from several models are used to create future inputs to GO WEST and TEP models, including GCAM-USA, TELL, CERF and reV. This dataset includes experiment inputs and outputs from three different transmission expansion scenarios (cooperative, intermediate, and individual) for 2019 and 2059. For 2019, a base scenario to illustrate the default (i.e., historical) power grid operations is also included. This study utilizes rcp45hotter_ssp3 scenario from a previous version of GCAM-USA simulations. Sources of the shapefiles in supplementary data are HIFLD Open and U.S. Energy Atlas. Please see the README file for a detailed description of the main and supplementary data.

Capacity Expansion Model↗

IM3 Projected U.S. Western Interconnection Grid Stress Dataset

This dataset provides projected grid stress and reliability results (including all model inputs and outputs from GO WEST and TEP) for Integrated Multisector, Multiscale Modeling (IM3) Phase 2 simulations across eight different scenarios for the U.S. Western Interconnection through 2055. The scenarios include combinations of two Shared Socioeconomic Pathways (SSP3 and SSP5) with four high-resolution climate projections specific to the United States from a set of Thermodynamic Global Warming (TGW) simulations. These climate projections include "hotter" and "cooler" variants for two Representative Concentration Pathways (RCP4.5 and RCP8.5). The resulting eight simulations are: rcp45cooler_ssp3 rcp45cooler_ssp5 rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85cooler_ssp3 rcp85cooler_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 GO WEST is an open-source power grid modeling framework for the U.S. Western Interconnection, which allows users to tailor the model depending on their research study and science questions. It covers 28 balancing authorities (BAs) and 12 states in U.S. Western Interconnection. GO WEST allows users to select different number of nodes and come up with a simplified network by utilizing 10,000 nodal topology of the U.S. Western Interconnection (ACTIVSg10k). Users can select different number of nodes, mathematical formulations (linear programming vs. mixed-integer linear programming), transmission line limit scaling factors, and hurdle rate scaling factors. GO WEST offers a unit commitment and economic dispatch (UC/ED) module to simulate grid operations on an hourly scale. In this sense, users can calibrate and validate their model versions by comparing model outputs to historical datasets. TEP is an open-source transmission capacity expansion model, built on the GO WEST framework. It utilizes linear programming to optimize transmission capacity addition investment on existing lines within the GO WEST framework. The TEP model only increases the thermal capacity of existing transmission lines and does not add new lines to the system, which leaves the topology preserved. In order to use TEP model, users need to create scenarios with the GO WEST framework. Please refer to README file for a detailed description of the dataset including individual files and references.

Capacity Expansion Model↗

The Statistical Spread of Transmission Outages on a Fast Protection Time Scale Based on Utility Data

When there is a fault, the protection system automatically removes one or more transmission lines on a fast time scale of less than one minute. The outaged lines form a pattern in the transmission network. We extract these patterns from utility outage data, determine some key statistics of these patterns, and then show how to generate new patterns consistent with these statistics. The generated patterns provide a new and easily feasible way to model the overall effect of the protection system at the scale of a large transmission system. This new data-driven generative modeling of protection is expected to contribute to simulations of disturbances in large grids so that they can better quantify the risk of blackouts. Analysis of the pattern sizes suggests an index that describes how much outages spread in the transmission network at the fast timescale.

Transmission↗

Analysis of Line Distance Elements for Various Ibr Controllers and System Conditions

The large-scale penetration of inverter-based resources in power systems has challenged protection engineers because of the different fault behaviors these sources provide compared to conventional generation systems. The main challenges include a low level of fault current magnitude, unpredictable angles of sequence currents, and lack of inertia that can lead to maloperation of conventional phasor-based protection elements. This paper presents a sensitivity analysis of transmission line distance protection elements during phase-to-ground and phase-to-phase faults for different inverter controllers and power system conditions. It also summarizes which line protection elements remain secure near IBR terminations and identifies the ones affected by the inverter-based response. The paper concludes by highlighting that regulating negative-sequence current injection during the fault aids correct protection decisions, but does not address the entire challenge. Finally, alternative protection elements to those affected by the inverter fault response are discussed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Fault-Tolerant Decentralized Control for Large-Scale Inverter-Based Resources for Active Power Tracking

Integration of inverter-based resources (IBRs) which lack the intrinsic characteristics such as the inertial response of the traditional synchronous-generator (SG)-based sources presents a new challenge in the form of analyzing the grid stability under their presence. While the dynamic composition of IBRs differs from that of the SGs, the control objective remains similar in terms of tracking the desired active power. This letter presents a decentralized primal-dual-based fault-tolerant control framework for the power allocation in IBRs. Overall, a hierarchical control algorithm is developed with a lower level addressing the current control and the parameter estimation for the IBRs and the higher level acting as the reference power generator to the low level based on the desired active power profile. The decentralized network-based algorithm adaptively splits the desired power between the IBRs taking into consideration the health of the IBRs transmission lines. The proposed framework is tested through a simulation on the network of IBRs and the high-level controller performance is compared against the existing framework in the literature. The proposed algorithm shows significant performance improvement in the magnitude of power deviation and settling time to the nominal value under faulty conditions as compared to the algorithm in the literature.

24 POWER TRANSMISSION AND DISTRIBUTION↗

How Inverter-Based Resources (IBRs) Affect Protection Relay Elements

This presentation starts with the details of IEEE 2800-2022 requirements of IBR for balanced and unbalanced faults. Then, it shows how to design a droop based GFM control to be IEEE 2800-2022 compliant. An performance evaluation is carried out to see if three OEM GFM inverters 2800-2022 compliant or not. And finally we show how IEEE 2800-2022 complaint and non-compliant GFM inverter will impact the transmission line protection elements, such as directional element and FID. Finally, recommendations are made if the GFM is not IEEE 2800-2022 compliant to disable the protection elements that rely on reliable and regulated negative sequence current.

24 POWER TRANSMISSION AND DISTRIBUTION↗

High-Voltage DC MULTI-terminal SIMulation (HVDC MULTISIM): Technical Program Summary

Expansion of the power grid in the USA is essential to fulfilling the rising energy demand of the country. In particular, the transmission grid, a network of electrical energy corridors that enable the flow of large amounts of energy from the point of generation to the point of consumption, needs significant expansion to cater to this growth of electrification. The current infrastructure is also dated, and any new transmission corridor should be based on a vision of building a modern infrastructure that is futureproof. High voltage DC (HVDC) transmission technology falls in this category: it is the most economical way to build large transmission lines and relies on sophisticated electronics and flexible controls, rather than just passive components like switchgear and transformers. This project is aimed at establishing the technical and economic feasibility of a network of HVDC lines that are interconnected to form a multi-terminal DC network. HVDC transmission is not a new technology and United States has a number of such lines; however, these are point to point transmissions and do not form a DC grid. Modeling and analyzing DC grids is challenging since there are no established modeling tools and the traditional ways of modeling AC grids fall short of providing the fidelity required the fast dynamics of the DC grid. This project aims to build a software-in-the-loop simulator for a multi-terminal HVDC grid, called MULTISIM and, establish new control and protection algorithms to operate such a connected DC system. NLR, a key partner, established the core framework of the MULTISIM simulator and validated its functionality. The GE Vernova team, created a full-scale model of a four-terminal HVDC network using PSCAD (Power Systems Computer Aided Design) software and established the baseline performance of the system during normal and fault operation. The project was started on 10/12024 with a kick-off meeting held on 12/11/2024 and ran through two quarters till termination. All the tasks, milestones and deliverables during this period were met. Several interim reports detailing the various tasks were submitted. The following sections provide details on the completed tasks till the project pause and termination after Q2.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Comprehensive Study of the Impact of Inverter-Based Resource (IBR) Modeling and Control on Protection Relay Elements

Inverter-based resources (IBRs) exhibit fault responses that differ significantly from those of synchronous generators, which can challenge the reliable operation of many commonly used power system protection elements. The fault response of IBRs is primarily influenced by their control algorithms and configurations, but the impact of these controls on protection relays is not yet fully understood. This presentation provides a comprehensive study of how IBR modeling and controls affect transmission line protection. Key modeling and control aspects include the DC source, inverter model, power level control, current control, and current limiting. The study reveals that certain aspects - such as the type of DC source (battery, PV, or hybrid), inverter model (average vs. switching), and power level control methods (PQ dispatch vs. Vdc-Vac control for grid-following IBRs, and droop vs. VSM for grid-forming IBRs) - do not significantly affect relay response. However, faster control loops, such as current control and current limiting, do influence the relay behavior. Additionally, the study explores the effects of other factors, including momentary cessation, operating points, fast/slow current responses, and grid strength on relay performance. Finally, the study offers recommendations for both IBR and protection engineers to improve IBR fault response and enhance the reliability of protection systems.

14 SOLAR ENERGY↗

Evaluation of a Reduced-Order Model for IBR Fault Response Representation via OEM Blackbox Models: Preprint

Driven by the need to capture the electromagnetic transients of transmission lines, inverter switching behavior, and detailed control systems, electromagnetic transient (EMT) studies have become increasingly important in industry, such as IBR interconnection study and fault study. However, original equipment manufacturer (OEM) inverter models typically include extensive parameters and proprietary settings that are unavailable to protection engineers. This paper introduces a data-driven, reduced-order model (ROM) developed as a PSCAD library component for use in EMT-based fault studies. The ROM replicates key OEM model behaviors without requiring detailed knowledge of control design or parameterization. The accompanying Python automation scripts streamline data generation, parameter fitting, and validation. The ROM's performance is demonstrated through comparison with both IEEE 2800-compliant and non-compliant OEM models in a real-world power system. Relay responses show nearly identical results, while simulation runtime is reduced by an average of 32.8\%, highlighting the ROM's practicality for protection engineers.

14 SOLAR ENERGY↗

Energy storage planning for enhanced resilience of power systems against wildfires and heatwaves

Extreme weather events pose significant risks to power grid stability due to their severe consequences and potential for widespread failures. Energy storage systems hold great potential for enhancing grid resilience against such events by providing reliable power during peak demand periods. However, accurately quantifying the size, location, and investment costs of new energy storage assets is a complex task, as energy storage planning decisions depend on the investment choices of other generation technologies and the integration of new transmission projects. Here, this paper presents a novel capacity expansion planning framework that simultaneously optimizes investments in energy storage, generation, and transmission, determining their optimal size, location, and type, while incorporating extreme weather events into long-term planning. More specifically, our stress-event-informed planning framework integrates the impact of heatwaves and wildfires into the planning process, identifying least-cost investment solutions that comply with policy goals and enhance grid resilience. The proposed framework employs machine-learning-based modeling to project heatwave-induced loads and performance-based risk assessment to evaluate wildfire-driven transmission line derates. Using industry-standard datasets to accurately represent the transmission topology of the Western Interconnection (WI) system, the proposed framework is applied to the WI 40-zone system, with investment decisions reported for the years 2030, 2035, and 2040. Simulation results reveal that with just a 10% increase in investment costs, resilience against extreme events can be significantly improved, with investment decisions heavily favoring energy storage, particularly 4-hour energy storage systems.

25 ENERGY STORAGE↗

Integration of New Technology Considering the Trade-Offs Between Operational Benefits and Risks: A Case Study of Dynamic Line Rating

Electric grid operators are adept at handling complexity and uncertainty. However, with increasing introduction of renewable generation, distributed energy resources, and more frequent severe weather events, operators will experience new workload and challenging decision scenarios. Here, this paper quantifies risks and benefits from an operator's perspective of introducing weather based forecast Dynamic Line Ratings (DLR) using variable wind conditions in addition to ambient temperature to relieve transmission congestion and facilitating more offshore wind (OSW). A concept of operations (CONOPS) applied to a forecast DLR implementation and its integration with OSW is defined. A method for evaluating tradeoffs of derating to make the rating more conservative but decreasing the benefit was developed and applied to a case study for two existing overhead transmission lines on Long Island, New York. The CONOPS uses historical day-ahead and hour-ahead High Resolution Rapid Refresh weather forecasts and weather station data to support planning and real-time operations. The analysis determines the risk of downgrades in real-time operational rating compared to the forecast and quantifies the frequency and severity of last-minute downgrades. The risk is compared against the benefits in increased capacity to provide insights on the additional amount of uncertainty DLR and OSW will add to the operator's workload.

17 WIND ENERGY↗

A grid-scale study of demand bidding by large industrial users

A demand bidding mechanism for engaging large industrial electricity users in the operation of the power grid is presented. Demand bidding is formulated as an optimization problem based on a modified version of the alternating current optimal power flow problem, and can be interpreted as a tâtonnement process between the grid operator and electricity users. Here, the work provides the first – to the authors’ knowledge – grid-scale case study of demand bidding, using a synthetic grid structure in the footprint of the grid of Texas. Results reveal that the demand bidding lowers overall power generation costs, but economic benefits plateau as the number of participants increases. Transmission line and transformer capacity constraints become the limiting factors, revealing that expanding and fortifying the transmission infrastructure is key to expanding demand-side participation. Demand bidding does not substantially alter the optimal operation of existing bidding entities when the number of bidders increases, thereby supporting existing bidders to stay in the system and encouraging new ones to join.

Chlor-alkali plant↗