Search NASA⌕ Search

SEARCH · Search NASA

Results for “electric cooperatives”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Developing a Hybrid Electric Vehicle Eco-Cooperative Adaptive Cruise Control System at Signalized Intersections.

This study develops an eco-driving strategy for hybrid electric vehicles (HEVs) in the vicinity of signalized intersections, entitled HEV Eco-Cooperative Adaptive Cruise Control at Intersections (Eco-CACC-I). The proposed system computes real-time, energy-optimized vehicle trajectories using HEV vehicle dynamics and energy consumption models. In the proposed system, a simple HEV energy model is used to compute the instantaneous fuel consumption. This HEV energy model is selected since it is general, transferable, and can be easily used to compute instantaneous energy consumption levels for HEVs without the additional input of vehicle engine data or complicated power control strategies. In addition, a vehicle dynamics model is used to capture the relationship between speed, acceleration level, and tractive/resistance forces on vehicles. The energy-optimum problem is formulated as an optimization problem with constraints, which is solved using a moving-horizon dynamic programming approach. The proposed HEV Eco-CACC-I system was tested to evaluate its performance for various speed limits, roadway grades, and signal timings. Lastly, the proposed HEV controller was implemented in a microscopic traffic simulation software to test its network-wide performance. The test results from an arterial corridor with three signalized intersections demonstrate that the proposed system can effectively reduce stop-and-go traffic in the vicinity of signalized intersections producing savings of 7.4% in energy consumption, 5.8% in traffic delay and 23% vehicle stops, respectively.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Direct Probe of the Interior of an Electric Pion in a Cooper Pair Superinsulator.

The nature of hadrons is one of the most fundamental mysteries of physics. It is generally agreed that they are made of "colored" quarks, which move nearly free at short scales but are confined inside hadrons by strong interactions at large distances. Because of confinement, quarks are never directly observable and, experimentally, their properties can be tested only indirectly, via high energy collisions. Here we show that superinsulating films realize a complete, one-color model system of hadron physics with Cooper pairs playing the role of quarks. We report measurements on highly controlled NbTiN films that provide a window into the interior of "Cooper pair mesons" and present the first direct evidence of asymptotic freedom, `t Hooft's dual superconductivity confinement mechanism, and magnetic monopoles.

Diamantini, M. C.↗

Front-End Engineering and Design: Project Tundra Carbon Capture System (Final Report)

As the next phase of Project Tundra, Minnkota Power Cooperative (MPC) completed a front-end engineering and design (FEED) study to install a post-combustion CO 2 capture system (CCS) at the MPC operated (Square Butte Electric Cooperative-owned) Milton R. Young Station (MRYS) Unit 2 (MRY2), a 477-MW power plant fueled by North Dakota lignite. The project team completed the FEED with Fluor’s Econamine FG Plus℠ (EFG+) technology and is taking the next steps leading up to start of construction. Team members included FEED technical lead Fluor Enterprises (Fluor); owner’s engineer and balance of plant (BOP) engineer Burns & McDonnell (BMcD); leading carbon capture consultants (David Greeson Consulting, Hunt International Energy Services); environmental consultants (AECOM, Agora Environmental), other BOP engineering consultants (Golder Associates, Nels); cost-share funding agency, the North Dakota Industrial Commission (NDIC); and the Energy & Environmental Research Center (EERC). Project Tundra’s goal is to implement carbon capture, utilization, and storage (CCUS) in North Dakota, while preserving the use of lignite. Future options could lead to revitalizing legacy oil fields and creating a new CO 2 enhanced oil recovery (EOR) industry. The topic of this report is the FEED study for the carbon dioxide capture portion of Project Tundra. Building on the findings of a pre-FEED study for MRY2, the key deliverables contained in this FEED study are: a) design, costing, and performance data needed to commence project financing activities; b) engineering and material balances required to file for all project permits; and c) a final project schedule. Based on the results of the previous pre-FEED study, MPC and its team evaluated two options to provide the large amount of steam needed to operate the CCS: 1) installation of new natural gas package boilers and a new pipeline to supply natural gas to the facility and 2) extraction of steam from the existing MRYS steam turbine generator. The FEED study was performed using the package boilers option, as it was deemed to have the lowest technical risk, overall cost, and cost uncertainty. A key feature of the design, however, was the mixing the natural gas boilers’ flue gas with the MRY2 flue gas. This increased the size of the CCS system. This design also enabled the tie-in of Unit 1 flue gas for times when Unit 2 is offline. The CCS was designed to capture a combined 12,978 short tons per day (STPD) of CO 2 from the flue gases produced by the existing MRY Unit 2 along with flue gas produced by the new boiler package within the CCS. The 12,978 STPD CO 2 capture is achieved by normally processing 100% of the total available MRY Unit 2 flue gas (considering full load operation) and 100% of the boiler package flue gas, then removing 90% of the CO 2 available from the processed flue gas streams.

01 COAL, LIGNITE, AND PEAT↗

Ammonia-Based Energy Storage Technology

The University of North Dakota Energy & Environmental Research Center (EERC), in partnership with the U.S. Department of Energy National Energy Technology Laboratory (NETL), Basin Electric Power Cooperative, Minnkota Power Cooperative, Otter Tail Power Company, and the North Dakota Industrial Commission (energy technology research and development sponsor), undertook a project to model, validate, and advance (from Technology Readiness Level [TRL] 2 to TRL 3) the ammonia-based energy storage technology (NH 3 -BEST) concept. The concept is designed to enable electricity-generating unit (EGU) accommodation of power demand fluctuations while steadily operating within an optimal-performance baseline power output range, ensuring maximum EGU operational efficiency and minimum degradation of materials, equipment, and performance because of load-cycling-driven stresses.

25 ENERGY STORAGE↗

Cooperative fault management for resilient integration of renewable energy

Cooperative fault management (CFM) is designed herein to control different types of renewable energy resources cooperatively during electrical faults. This paper studies systems with a high penetration of photovoltaic (PV) energy and wind energy. First, CFM leverages power converters of PV farms to boost the ride-through capability of nearby doubly-fed induction generators (DFIGs). By controlling PV farms’ output voltages to change smoothly during both fault initiation and fault clearance, the widely used crowbar in DFIGs is less likely to be activated. Crowbar activation adversely makes DFIGs lose controllability and absorb reactive power. The second contribution is the development of a software-defined CFM controller and a controller in-the-loop demonstration of the real-time performance of this optimization-based CFM. CFM capitalizes on distributed optimization formulation to enable flexibility, plug-and-play, and privacy-preserving. Computation time, however, is a major concern for optimization-based dynamics control. Here, real-time controller-in-the-loop simulation results show optimization-based CFM can output reference values around 60 ms and is quick enough for dynamic control.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Economic Extraction and Recovery of REEs and Production of Clean Value-Added Products from Low-Rank Coal Fly Ash

The University of North Dakota (UND) Energy & Environmental Research Center (EERC) teamed with Pacific Northwest National Laboratory (PNNL) , the North Dakota Industrial Commission Lignite Research Program, and commercial partners Basin Electric Power Cooperative, Great River Energy, and Southern Company to execute a Cooperative Agreement funded by the U.S. Department of Energy’s (DOE’s) National Energy Technology Laboratory (NETL) focused on identifying unique pathways and pretreatments to extract rare-earth elements (REEs) from low-rank coal (LRC) ash in a more economical and environmentally benign manner than current methods. The EERC drew upon the unique and deep knowledge of the team regarding LRC geochemistry, ash transformation mechanisms during combustion, and fly ash chemistry in the approach to understand the portioning of REEs in LRC ash. A comprehensive characterization effort was undertaken to fully establish the form, associations, and partitioning of the REEs and other elements/minerals of interest in fly ash, as well as the ash chemistry, mineralogy, and morphology. Using this information, the team tested methods of REE extraction to take advantage of the unique and advantageous properties of LRC ash. Multiple complementary approaches were evaluated that combined both novel and proven methods to develop an extractive process for REEs and other high-value metals from LRC ash that provide technological and economic progress on the current state of the art. Methodologies were also evaluated for the potential to synergistically remove toxic metals while extracting other high-value metals from the ash, generating a clean, safe ash material as a value-added product. This would eliminate waste and offer significant additional revenue potential. Based on laboratory-scale testing, an initial high-level technical and economic analysis to estimate operating expenses and product revenues to guide future phases of technology development was implemented. By focusing on minimizing process steps and consumptive use of extraction solutions, a tunable, economically viable process for REE extraction from LRC ash was developed. The tunable process has the ability to be adjusted to adapt to the differing ash chemical and physical properties that are characteristic of LRC ash. This is key to deployment as a commercial process. In demonstrating the process, the EERC was able to illustrate mixed REE concentration greater than the goal of 2 wt%. High-level economic analysis of the process with LRC ash of moderate REE levels demonstrated the potential of the process, but recovery of just the REEs was insufficient to cover operational costs. With the additional extraction of other high-value metals found in LRC ash, the process economics approach would break even, and it is anticipated that with process optimization, the developed process could potentially be economically sound. The same economic analysis performed utilizing LRC ash with high levels of REEs showed the recovery of the REEs alone would make the process economically viable even without further optimization.

01 COAL, LIGNITE, AND PEAT↗

North Dakota Integrated Carbon Storage Complex Feasibility Study. Final report

In spring 2017, the Energy & Environmental Research Center (EERC) initiated an effort to determine the feasibility of developing a commercial-scale CO 2 geologic storage complex able to store 50+ million tonnes (Mt) of CO 2 in central North Dakota safely, permanently, and economically. The objective was to fulfill the goals of the U.S. Department of Energy (DOE) Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative and address technical and nontechnical challenges specific to commercial-scale deployment of a CO2 storage project. The findings clearly show that the concept of capturing CO 2 from a lignite-fired electrical generation facility in central North Dakota and safely and permanently storing the CO 2 in the deep subsurface is indeed technically, economically, and socially feasible. This project evaluated two study areas and their respective geologic storage complexes located adjacent to separate coal-fired facilities in North Dakota: the Basin Electric Power Cooperative (BEPC)-owned Great Plains Synfuels Plant (GPSP) and the Minnkota Power Cooperative (Minnkota)-owned Milton R. Young Station (MRYS). These locations, one with CO 2 capture in place and an existing CO 2 pipeline, are bolstered by progressive North Dakota pore space ownership and long-term liability laws. These elements and a motivated team created an ideal synergistic scenario for ensuring success of the CarbonSAFE Initiative and promoting North Dakota’s statewide vision for carbon management. The project included drilling two new geologic characterization wells, integrating an existing 3-D seismic survey, creating a geologic model subsequently used for injection simulation, a risk assessment, public outreach, and generating a site development plan based on results. In addition, the performance of select National Risk Assessment Partnership tools was evaluated. The geologic characterization wells were drilled ~5600 feet deep to the Broom Creek Formation; ~350 feet of core was retrieved from each well. The core included the Broom Creek (targeted injection zone) and a portion of the overlying Opeche Shale (seal). The Flemmer-1 well, west of Beulah, North Dakota, yielded 169 feet of sandstone. The BNI-1 well located south of Center, North Dakota, yielded 124 feet of sandstone. In each case, laboratory analysis of the sandstone showed permeability in the 300–1000-mD range, with porosity of 20%–30%. The Flemmer-1 well was sited within the boundaries of an existing 3-D seismic survey. Colocating the well with the seismic survey maximized the relationship between new and legacy data and developed a first-of-its-kind interpretation of the geologic fabric of the Broom Creek. Geologic characterization data were integrated into a 5544-mi 2 geocellular model that encompassed both new wells and stratigraphy from the surface to the Amsden Formation (underlying the Broom Creek). The model was later expanded vertically to include the deeper Black Island–Deadwood interval to examine its potential viability as a storage target. The geocellular model provided the foundation for dynamic simulation of CO 2 into the Broom Creek. Results of the simulation suggest that the Broom Creek could accept the DOE target rate of 2 Mt/yr of CO 2 into as few as two wells. To bracket the expected capture from MRYS, simulations were also investigated for a 4-Mt/yr rate near MRYS. Although more wells are needed (two additional), the Broom Creek still has the storage resource to accept the CO 2 at the increased rate. A risk assessment exercise was conducted to identify and assess technical and nontechnical risks that could prevent potential candidate storage complexes within the study area from serving as commercial storage sites. The assessment identified and evaluated six technical risk categories: 1) CO 2 injectivity, 2) storage capacity, 3) lateral migration of CO 2 , 4) lateral pressure propagation, 5) vertical migration of CO 2 or formation brine, and 6) induced seismicity. Following two rounds of analysis and scoring, no risks were determined to preclude continued efforts to develop carbon capture, utilization, and storage (CCUS) in central North Dakota. The risk assessment results will be used to guide future site characterization, modeling and simulation, and monitoring activities. A specific nontechnical strategic risk based on challenges that may be realized in amalgamation of pore space resulted in vertically expanding the geologic model to incorporate the potential for stacked storage in multiple saline reservoirs. By including the Black Island–Deadwood interval (the basal sedimentary reservoir in this region), the amalgamated areal extent could be reduced by as much as 45%. Working with a smaller geographic area reduces risks and costs associated with monitoring and pore space leasing. An economic evaluation incorporating capture; transport (<5 mi); Class VI wells; permitting; and monitoring, verification, and accounting suggests implementing commercial-scale CCUS is economically attractive if the federal tax benefits of 45Q are included. This is validated by Minnkota’s continued pursuit of CO 2 capture and geologic storage at MRYS through its Project Tundra initiative, indicating that there is a business case for CCUS in central North Dakota. Currently, North Dakota is the only state with underground injection control (UIC) Class VI primacy. Built into the North Dakota Century Code is a series of regulatory requirements that guide the process to obtain a Class VI CO 2 storage facility permit. As part of this project, a site development plan was compiled to assure compliance with North Dakota’s requirements to permit a commercial-scale CO 2 storage operation and includes a prospective time line encompassing a general breakdown of activities. In total, an estimated 30 months would be needed to execute the necessary steps to attain a North Dakota CO 2 storage facility permit. Outreach was an integral part of the project and encompassed any project-related activity that had contact or exposure beyond the project team. The goals of outreach were to foster an environment from which stakeholders could make informed decisions about the project and gauge community receptiveness to a CCUS project. A consistent set of messages and outreach products were developed in conjunction with an outreach advisory board that integrated project partners and team members. To gauge public acceptability of geologically storing CO 2 , 5611 households in the project area were invited to participate in an online survey. The survey results indicate that the public attitude regarding CCUS is neutral to positive, with strong sentiment that CO 2 capture and storage may be an approach to maintain the economic vitality of the region. To achieve project objectives, critical support in the form of financial backing, engineering evaluations, site access, outreach collaboration, operations data, risk assessment/evaluation, and software access was provided by BEPC, the North Dakota Industrial Commission Lignite Research Council, ALLETE Clean Energy, BNI Energy, North American Coal Corporation, Minnkota, Prairie Public Broadcasting, Computer Modelling Group Ltd., and Schlumberger.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization through Integration of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution of wall conditions in utility boilers. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of a coal-fired utility boiler in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

42 ENGINEERING↗

Williston Basin Carbon Ore, Rare Earth, and Critical Minerals (CORE-CM) Program

The U.S. Department of Energy’s Office of Fossil Energy awarded 13 CORE-CM programs as part of the CORE-CM Initiative, designed to develop the technology and upstream and midstream supply chains to extract rare-earth elements (REEs) and critical minerals (CMs) from the nation’s coal supplies. The intent is to catalyze regional economic growth and job creation while strengthening the use of domestic resources. The Williston Basin CORE-CM Program aims to drive the expansion and transformation of coal and coal-based resource usage within the Williston Basin to produce REEs, CMs, and nonfuel carbon-based products (CBPs). The work constitutes Phase 1 of a long-term program. The objectives of Phase 1 are to identify the existing knowledge base and gaps and to develop a series of assessments/plans, including an initial basinal assessment; a characterization and data acquisition plan; a waste stream reuse plan; a basinal strategies assessment for infrastructure, industries, and business; a technology assessment, development, and field testing plan; a technology innovation center plan(s); and a stakeholder outreach and education plan. The goal of this project is to initiate the development of a new industry in the resource-rich Williston Basin that will catalyze economic growth and job creation through a coalition team of private industry, university, and state, local, and federal government entities. A coalition team of nearly 30 private industry, university, and state, local, and federal government partners was formed for this program. Partners include the University of North Dakota Energy & Environmental Research Center, Institute for Energy Studies, and Nistler College; North Dakota State University; Montana Tech University; Pacific Northwest National Laboratory; Critical Materials Institute; North Dakota Geological Survey; South Dakota Geological Survey; U.S. Geological Survey; North American Coal Corporation; BNI Energy; Basin Electric Power Cooperative; Minnkota Power Cooperative; and many more.

Kay, John P.↗

Williston Basin Carbon Ore, Rare Earth, and Critical Minerals (CORE-CM) Program

The U.S. Department of Energy’s (DOE’s) Office of Fossil Energy awarded 13 Carbon Ore, Rare-Earth and Critical Minerals (CORE-CM) programs as part of the CORE-CM Initiative, designed to develop the technology and upstream and midstream supply chains to extract rare-earth elements (REEs) and CMs from the nation’s coal supplies. The intent is to catalyze regional economic growth and job creation while strengthening the use of domestic resources. The Williston Basin CORE-CM Program aims to drive the expansion and transformation of coal and coal-based resource usage within the Williston Basin to produce REEs, CMs, and nonfuel carbon-based products (CBPs). The work constitutes Phase 1 of a long-term program. The objectives of Phase 1 are to identify the existing knowledge base and gaps and to develop a series of assessments/plans, including an initial basinal assessment; a characterization and data acquisition plan; a waste stream reuse plan; a basinal strategies assessment for infrastructure, industries, and business; a technology assessment, development, and field-testing plan; a technology innovation center plan(s); and a stakeholder outreach and education plan. Originally, the CORE-CM programs were to do little if any sample collection as part of the Phase 1 program. As part of the ongoing interactions with DOE regarding the progress of the 13 CORE-CM programs, DOE has decided to extend Phase 1 with additional funding to allow all of the Phase 1 CORE-CM programs to collect and characterize more samples that have potential to be sources of REEs and CMs. The goal of this project is to initiate the development of a new industry in the resource-rich Williston Basin that will generate economic growth and job creation through a coalition team of private industry; university; and state, local, and federal government entities. A coalition team of nearly 30 private industry; university; and state, local, and federal government partners was formed for this program. Partners include the University of North Dakota Energy & Environmental Research Center, Institute for Energy Studies, and Nistler College; North Dakota State University; Montana Tech University; Pacific Northwest National Laboratory; Critical Materials Institute; North Dakota Geological Survey; South Dakota Geological Survey; U.S. Geological Survey; North American Coal Corporation; BNI Energy; Basin Electric Power Cooperative; Minnkota Power Cooperative; and many more.

Kay, John P.↗

Williston Basin Carbon Ore, Rare Earths, and Critical Minerals (CORE-CM) Program

The U.S. Department of Energy’s Office of Fossil Energy awarded 13 CORE-CM programs as part of the CORE-CM Initiative, designed to develop the technology and upstream and midstream supply chains to extract rare-earth elements (REEs) and critical minerals (CMs) from the nation’s coal supplies. The intent is to catalyze regional economic growth and job creation while strengthening the use of domestic resources. The Williston Basin CORE-CM Program aims to drive the expansion and transformation of coal and coal-based resource usage within the Williston Basin to produce REEs, CMs, and nonfuel carbon-based products (CBPs). A coalition team of nearly 30 private industry, university, and state, local, and federal government partners was formed for this task. Partners include the University of North Dakota’s Energy & Environmental Research Center, College of Engineering and Mines Research Institute, and Nistler College; North Dakota State University; Montana Tech University; Pacific Northwest National Laboratory; Critical Materials Institute; North Dakota Geological Survey; South Dakota Geological Survey; U.S. Geological Survey; North American Coal Corporation; BNI Energy; Basin Electric Power Cooperative; Minnkota Power Cooperative; and many more. This presentation will focus on the current status and results to date of the Williston Basin CORE-CM Program, with a focus on core sample characterization for REE and CM content.

Folkedahl, Bruce C.↗

Economic Extraction and Recovery of REEs and Production of Clean Value-Added Products from Low-Rank Coal Fly Ash

TechConnect World Innovation Conference & Expo, Washington, DC, June 13–15, 2022. The University of North Dakota (UND) Energy & Environmental Research Center (EERC) teamed with Pacific Northwest National Laboratory; the North Dakota Industrial Commission Lignite Research Program; and commercial partners Basin Electric Power Cooperative, Great River Energy, and Southern Company to execute a Cooperative Agreement funded by the U.S. Department of Energy’s National Energy Technology Laboratory (NETL) focused on identifying unique pathways and pretreatments to extract rare-earth elements (REEs) from low-rank coal (LRC) ash in a more economical and environmentally benign manner than current methods. By focusing on minimizing process steps and consumptive use of extraction solutions, a tunable, economically viable process for REE extraction from LRC ash was developed.

01 COAL, LIGNITE, AND PEAT↗

Unalakleet Microgrid Optimization for Tribal Community Resilience

The Unalakleet Microgrid Optimization Project aimed to strengthen the reliability and efficiency of the isolated electric power system that serves the Tribal community of Unalakleet, Alaska. The community relies entirely on a local wind-diesel microgrid, consisting of four 475 kW diesel generators and six 100 kW wind turbines, to provide electricity to approximately 745 residents and Tribal facilities. Because Unalakleet is not on a road system and is located nearly 400 miles from the nearest major power grid, maintaining a resilient and efficient local energy system is critical. The scope of this project included upgrading a portion of the transmission line between the wind farm and the power plant to increase voltage and reduce line losses, along with modernizing the Supervisory Control and Data Acquisition (SCADA) system to improve monitoring, control, and data management of the power system. These upgrades were designed to increase wind energy utilization, reduce diesel fuel consumption by tens of thousands of gallons annually, and improve overall grid stability. By allowing more of the community’s electricity to be supplied by local renewable wind resources, the project was designed to lower operating costs, reduce dependence on imported fuel, and strengthen the long-term resilience of the power system. These improvements represent an important step toward the community’s long-term energy vision of expanding renewable generation, incorporating energy storage, and eventually achieving “diesels-off” operation, where essential Tribal loads are powered primarily by local renewable resources.

17 WIND ENERGY↗

High-Temperature Multi-Process Sensor Development and Demonstration at a Full-scale PC Combustion System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution of wall conditions in utility boilers. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of a coal-fired utility boiler in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗