Search NASA⌕ Search

SEARCH · Search NASA

Results for “Grid Connection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

A review on protection challenges of Transmission Lines connected to Inverter Based Resources

The increased penetration of inverter-based resources (IBRs) connected to transmission grids is challenging how traditional electric power systems operate. Such systems were originally designed based on the dominant presence of synchronous generators. Some main challenges include the increased concerns about system stability due to the reduced system inertia caused by IBRs and the reduced protection reliability caused by the non-deterministic fault current response of IBRs. The protection relays’ algorithms have been designed and validated based on well-known fault current characteristics of synchronous generations, while the short-circuit responses of IBRs heavily depend on their vendor-specific control schemes, which are mainly set to protect inverter semiconductor switches and DC components. The magnitude of short current that IBRs contribute is typically between 1.1–1.5 times the rated current that may behave unstably and incoherently with the voltages. The control scheme of the IBRs also controls the active (P) and reactive (Q) support during system voltage sag and swell conditions. These characteristics challenge not only protective relay schemes but also existing short-circuit software tools to correctly model IBRs for fault studies and protection coordination analyses.

14 SOLAR ENERGY↗

Generator Interconnection Costs to the Transmission System in non-ISO Balancing Authorities [Slides]

Electric transmission system operators—including Independent System Operators (ISOs), Regional Transmission Organizations (RTOs), and utilities—require proposed power plants to undergo a series of interconnection studies before connecting to the grid. These studies assess what transmission upgrades or new infrastructure may be necessary and assign the associated costs to the project. Lawrence Berkeley National Laboratory has compiled, aggregated, and cleaned interconnection cost data, originally for ISOs/RTOs, and now for five non-ISO Balancing Authorities: PacifiCorp, Bonneville Power Authority, Duke Energy Progress, Duke Energy Carolinas and Duke Energy Florida. Insufficient transparency in interconnection cost data may contribute to rapidly expanding interconnection queues, with active queue capacities tripling between 2020 and 2024 in the studied BAs. Most projects withdraw after receiving high interconnection cost estimates. Interconnection costs have increased since the early 2000s, with average costs for "complete" projects reaching $194/kW between 2018 and 2024. Active queue projects and withdrawn projects incur substantially higher costs, primarily due to rising network upgrade costs. Recent interconnection costs in non-ISO balancing authorities are higher than in ISO regions, potentially due to a greater willingness to pay among developers. Utility-scale solar, wind, and storage projects have interconnection costs that exceed those for natural gas. However, when focusing on projects that do not withdraw from the queue, the interconnection costs for these technologies are more similar to natural gas projects. Other key findings include: (1) Larger generation projects benefit from lower proportional interconnection costs, (2) capacity transmission service (NRIS) often requires additional network investments, and (3) projects with high network upgrade costs are often clustered geographically. The dataset includes results from 2,104 interconnection studies conducted between 2000 and 2024, covering projects that are operational, withdrawn, or still progressing through the study process. The Excel file contains (a) the complete project-level interconnection cost dataset, and (b) seven additional tabs summarizing cost metrics across dimensions such as time, market structure, cost category (point of interconnection vs. broader network upgrades), fuel type, service type (ERIS vs. NRIS), generator size, and geography.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Powered By ERAD [Slides]

Energy Resilience Analysis for Distribution Power System (ERAD) is a free, open-source Python toolkit for estimating the energy and service impacts of hazards like earthquakes and flooding. It uses a graph-based approach to capture high resolution connectivity among the grid, critical services, and customers and rapidly compute household level metrics and aggregated statistics across large distribution systems. It uses asset fragility curves that relate hazard severity to survival probability for power system equipment including cables, transformers, substations, etc. The tool is designed to be modular and extensible, allowing it to interface with third-party hazard simulators and integrate into broader resilience analysis workflows. ERAD enables researchers, students, communities, distribution utilities, and other stakeholders to understand hazard impacts and evaluate the effectiveness of different programs to improve energy resilience. The webinar was hosted by NLR researcher Aadil Latif.

24 POWER TRANSMISSION AND DISTRIBUTION↗

CERF Visualization: Projected locations of new natural gas combined cycle power plants (with recirculating cooling) in Wyoming, USA (2020-2050)

Visualization of CERF outputs for years 2030-2050 in 5-year time steps for a region in Wyoming, USA. This visualization was built using a custom CesiumJS application. The region of interest was zoomed into and then the app shows the layered application of natural gas combined cycle power plants (with recirculating cooling) suitability criteria, show the siting for each year in planform, simulates the selection of a site using Net Locational Cost, and then zooms into to show a single functional gas plant and simulates its connection to the grid.

CERF↗

NASTRAN hydroelastic modal studies. Volume 1: Introduction, theory, and results

The implementation of a general three-dimensional hydroelastic capability in the NASTRAN computer program is described. A method for analyzing the combined mode shapes of arbitrary fluid and structure finite element models was developed. The fluid was modeled with three-dimensional solid elements with options for tetrahedron, wedge, and hexahedron shapes. The elements were then connected to fluid grid points which defined the pressure in the fluid at the specified location. Matrices were formulated to provide efficient solutions for large-order problems. The structure matrices were processed separately and could be reduced using matrix condensation procedures or through a modal formulation using the normal modes of the empty structure as solution coordinates. The fluid/structure interface and the free surface were defined by the user with special NASTRAN boundary elements. A special purpose mesh generator program was provided to generate the actual NASTRAN data cards for the fluid, the structure, and the boundary elements for typical tank-type models.

Source record↗

NASTRAN hydroelastic modal studies. Volume 3: NASTRAN 3-D hydroelastic analysis and MESHGEN user's manuals

The method used to formulate the fluid/structure equations is described in the updates to the NASTRAN Theoretical Manual. The basis for defining the fluid are three dimensional finite elements connected to fluid grid points defining the Eulerian pressure at a point fixed in space. The use of a pressure single degree of freedom at each point rather than three displacements allows a finer mesh of elements with a reasonable matrix order. In the formulation of the fluid/structure system the interior fluid degrees of freedom are transformed and removed from the solution matrices. The eigenvalues of the combination are extracted from small, fully dense, symmetric mass and stiffness matrices, efficiently processed with the Givens method. The solution matrices are defined by the free surface displacements and the reduced structure coordinates.

Source record↗

Development and Testing of the Glenn Research Center Visitor's Center Grid-Tied Photovoltaic Power System

The NASA Glenn Research Center (GRC) has developed, installed, and tested a 12 kW DC grid-tied photovoltaic (PV) power system at the GRC Visitor s Center. This system utilizes a unique ballast type roof mount for installing the photovoltaic panels on the roof of the Visitor s Center with no alterations or penetrations to the roof. The PV system has generated in excess of 15000 kWh since operation commenced in August 2008. The PV system is providing power to the GRC grid for use by all. Operation of the GRC Visitor s Center PV system has been completely trouble free. A grid-tied PV power system is connected directly to the utility distribution grid. Facility power can be obtained from the utility system as normal. The PV system is synchronized with the utility system to provide power for the facility, and excess power is provided to the utility. The project transfers space technology to terrestrial use via nontraditional partners. GRC personnel glean valuable experience with PV power systems that are directly applicable to various space power systems, and provides valuable space program test data. PV power systems help to reduce harmful emissions and reduce the Nation s dependence on fossil fuels. Power generated by the PV system reduces the GRC utility demand, and the surplus power aids the community. Present global energy concerns reinforce the need for the development of alternative energy systems. Modern PV panels are readily available, reliable, efficient, and economical with a life expectancy of at least 25 years. Modern electronics has been the enabling technology behind grid-tied power systems, making them safe, reliable, efficient, and economical with a life expectancy of at least 25 years. Based upon the success of the GRC Visitor s Center PV system, additional PV power system expansion at GRC is under consideration. The GRC Visitor s Center grid-tied PV power system was successfully designed and developed which served to validate the basic principles described, and the theoretical work that was performed. The report concludes that grid-tied photovoltaic power systems are reliable, maintenance free, long life power systems, and are of significant value to NASA and the community.

Eichenberg, Dennis J.↗

Development and Testing of a Prototype Grid-Tied Photovoltaic Power System

The NASA Glenn Research Center (GRC) has developed and tested a prototype 2 kW DC grid-tied photovoltaic (PV) power system at the Center. The PV system has generated in excess of 6700 kWh since operation commenced in July 2006. The PV system is providing power to the GRC grid for use by all. Operation of the prototype PV system has been completely trouble free. A grid-tied PV power system is connected directly to the utility distribution grid. Facility power can be obtained from the utility system as normal. The PV system is synchronized with the utility system to provide power for the facility, and excess power is provided to the utility. The project transfers space technology to terrestrial use via nontraditional partners. GRC personnel glean valuable experience with PV power systems that are directly applicable to various space power systems, and provide valuable space program test data. PV power systems help to reduce harmful emissions and reduce the Nation s dependence on fossil fuels. Power generated by the PV system reduces the GRC utility demand, and the surplus power aids the community. Present global energy concerns reinforce the need for the development of alternative energy systems. Modern PV panels are readily available, reliable, efficient, and economical with a life expectancy of at least 25 years. Modern electronics has been the enabling technology behind grid-tied power systems, making them safe, reliable, efficient, and economical with a life expectancy of at least 25 years. Based upon the success of the prototype PV system, additional PV power system expansion at GRC is under consideration. The prototype grid-tied PV power system was successfully designed and developed which served to validate the basic principles described, and the theoretical work that was performed. The report concludes that grid-tied photovoltaic power systems are reliable, maintenance free, long life power systems, and are of significant value to NASA and the community.

Eichenberg, Dennis J.↗

A Renewably Powered Hydrogen Generation and Fueling Station Community Project

The proposed project goal is to encourage the use of renewable energy and clean fuel technologies for transportation and other applications while generating economic development. This can be done by creating an incubator for collaborators, and creating a manufacturing hub for the energy economy of the future by training both white- and blue-collar workers for the new energy economy. Hydrogen electrolyzer fueling stations could be mass-produced, shipped and installed in collaboration with renewable energy power stations, or installed connected to the grid with renewable power added later.

Lyons, Valerie J.↗

Dynamic simulation and load-following control of an integrated gasification combined cycle (IGCC) power plant with CO{sub 2} capture

Load-following control of future integrated gasification combined cycle (IGCC) plants with pre-combustion CO{sub 2} capture is expected to be far more challenging as electricity produced by renewable energy is connected to the grid and strict environmental limits become mandatory requirements. To study control performance during load following, a plant-wide dynamic simulation of a coal-fed IGCC plant with CO{sub 2} capture has been developed. The slurry-fed gasifier is a single-stage, downward-fired, oxygen-blown, entrained-flow type with a radiant syngas cooler (RSC). The syngas from the outlet of the RSC goes to a scrubber followed by a two-stage sour shift process with inter-stage cooling. The acid gas removal (AGR) process is a dual-stage physical solvent-based process for selective removal of H{sub 2}S in the first stage and CO{sub 2} in the second stage. Sulfur is recovered using a Claus unit with tail gas recycle to the AGR. The recovered CO{sub 2} is compressed by a split-shaft multistage compressor and sent for sequestration after being treated in an absorber with triethylene glycol for dehydration. The clean syngas is sent to two advanced “F”-class gas turbines (GTs) partially integrated with an elevated-pressure air separation unit. A subcritical steam cycle is used for heat recovery steam generation. A treatment unit for the sour water strips off the acid gases for utilization in the Claus unit. The steady-state model developed in Aspen Plus® is converted to an Aspen Plus Dynamics® simulation and integrated with MATLAB® for control studies. The results from the plant-wide dynamic model are compared qualitatively with the data from a commercial plant having different configuration, operating condition, and feed quality than what has been considered in this work. For load-following control, the GT-lead with gasifier-follow control strategy is considered. A modified proportional–integral–derivative (PID) control is considered for the syngas pressure control. For maintaining the desired CO{sub 2} capture rate while load-following, a linear model predictive controller (LMPC) is implemented in MATLAB®. A combined process and disturbance model is identified by considering a number of model forms and choosing the final model based on an information-theoretic criterion. The performance of the LMPC is found to be superior to the conventional PID control for maintaining CO{sub 2} capture rates in an IGCC power plant while load following.

01 COAL, LIGNITE, AND PEAT↗

Control system design for maintaining CO{sub 2} capture in IGCC power plants while loading-following

Load-following requirements for future integrated gasification combined cycle (IGCC) power plants with precombustion CO{sub 2} capture are expected to be far more challenging as electricity produced by renewable energy is connected to the grid and strict environmental limits become mandatory requirements. In this work, loadfollowing studies are performed using a comprehensive dynamic model of an IGCC plant with pre-combustion CO{sub 2} capture developed in Aspen Engineering Suite (AES). Considering multiple single-loop controllers for power demand load following, the preferred IGCC control strategy from the perspective of a power producer is gas turbine (GT) lead with gasifier follow. In this strategy, the GT controls the load by manipulating its firing rate while the slurry feed flow to the gasifier is manipulated to control the syngas pressure at the GT inlet. The syngas pressure control is an integrating process with significant time delay mainly because of the large piping and equipment volumes between the gasifier and the GT inlet. A modified proportional–integral–derivative (PID) control is considered for IGCC syngas pressure control. The desired CO{sub 2} capture rate must be maintained while the IGCC plant follows the load. For maintaining the desired CO{sub 2} capture rate, the control performance of PID control is compared with linear model predictive control (LMPC). The results show that the LMPC outperforms PID control for maintaining CO{sub 2} capture rates in an IGCC power plant while load following.

20 FOSSIL-FUELED POWER PLANTS↗

The path to clean energy: direct coupling of nuclear and renewable technologies for thermal and electrical applications

The U.S. Department of Energy (DOE) recognizes the need to transform the energy infrastructure of the U.S. and elsewhere to systems that can significantly reduce environmental impacts in an efficient and economically viable manner while utilizing both clean energy generation sources and hydrocarbon resources. Thus, DOE is supporting research and development that could lead to more efficient utilization of clean nuclear and renewable energy generation sources. A concept being advanced by the DOE Offices of Nuclear Energy (NE) and Energy Efficiency and Renewable Energy (EERE) is tighter coupling of nuclear and renewable energy sources in a manner that better optimizes energy use for the combined electricity, industrial manufacturing, and the transportation sectors. This integration concept has been referred to as a “hybrid system” that is capable of providing energy (thermal or electrical) where it is needed, when it is needed. For the purposes of this work, the hybrid system would integrate two or more energy resources to generate two or more products, one of which must be an energy commodity, such as electricity or transportation fuel. This definition requires coupling of subsystems ‘‘behind’’ the electrical transmission bus, where energy flows are dynamically apportioned as necessary to meet demand and the system has a single connection to the grid that provides dispatchable electricity as required while capital intensive generation assets operate at full capacity. Development of integrated energy systems for an “energy park” must carefully consider the intended location and the associated regional resources, traditional industrial processes, energy delivery infrastructure, and markets to identify viable region-specific system configurations. This paper will provide an overview of the current status of regional hybrid energy system design, development and application of dynamic analysis tools to assess technical and economic performance, and roadmap development to identify and prioritize component, subsystem and system testing that will lead to prototype demonstration.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Chapter 3: Reliability and Durability Testing Today

In year 2022 the Institute of Applied Sustainability to the Built Environment (ISAAC) of the Department of Environment Constructions and Design (DACD) of the University of Applied Sciences and Arts of Southern Switzerland (SUPSI) celebrates an important anniversary: 40 years of Ticino Solare (TISO), the first photovoltaic system in Europe connected to the grid back in 1982. The Institute of Applied Sustainability to the Built Environment (ISAAC) intends to realize a commemorative/perspective publication on the TISO. The publication will be available starting from the beginning of September 2022 and will be distributed on the occasion of the WCPEC in Milan (26-30 September 2022) and then be available for online download at https://pvlab.solar/wp-content/uploads/2022/10/TISO_Catalogo_Web.pdf.

durability↗

A Review on Protection Challenges of Transmission Lines Connected to Inverter-Based Resources

The increased penetration of inverter-based resources (IBRs) connected to transmission grids is challenging how traditional electric power systems operate. Such systems were originally designed based on the dominant presence of synchronous generators. Some main challenges include the increased concerns about system stability due to the reduced system inertia caused by IBRs and the reduced protection reliability caused by the non-deterministic fault current response of IBRs. The protection relays’ algorithms have been designed and validated based on well-known fault current characteristics of synchronous generations, while the short-circuit responses of IBRs heavily depend on their vendor-specific control schemes, which are mainly set to protect inverter semiconductor switches and DC components. The magnitude of short current that IBRs contribute is typically between 1.1–1.5 times the rated current that may behave unstably and incoherently with the voltages. The control scheme of the IBRs also controls the active (P) and reactive (Q) support during system voltage sag and swell conditions. These characteristics challenge not only protective relay schemes but also existing short-circuit software tools to correctly model IBRs for fault studies and protection coordination analyses

14 SOLAR ENERGY↗

Hydropower Black Start: A Guidebook for Retrofitting Grid Dependent Hydropower

Not all United States (US) hydropower plants were designed to provide black start, but they are increasingly needed to uphold resilience in the evolving electric grid. This guidance is designed to help understand the minimal retrofits required for grid dependent hydropower (GDH) plants behind the point of interconnection (POI). For distribution connected hydropower plants or those with dedicated cranking paths, such upgrades can be sufficient for the plant to provide black start. For others, more coordination with the transmission system operator will be needed. This guidebook answers a number of questions relevant to retrofitting hydropower plants with black start capabilities. For example, the guidebook answers: • How flexible do the wicket gate controls need to be? • Who needs to do hydro governor model validation, why, and how? • How robust and flexible do the excitation and AVR controls need to be? • What protection settings need to be adjusted? • What relay(s) will need to be bypassed or overridden and at what risk? • What is the electrical energy demand of the station load or auxiliary power systems? • What should the strategy to energize transformer(s) along cranking path to address inrush currents be? • How should the critical load restoration be sequenced? In addition to outlining the specifications that hydropower plants need to meet for each component to be able to perform black start, this guidebook provides a set of case studies for specific upgrades needed at actual plants. Between the case studies of plants that have already performed black start retrofits and the examples of how this guidebook can be applied to scope future retrofits, five key themes have been identified for retrofit needs. 1. Protection needs “black start” mode: hydropower plants that are not designed with black start capabilities will have protections that prevent them from interconnecting to a “dead bus.” These protections will need to be overridden in every retrofit case and a separate black start mode should be established so that operators can safely switch between black start and grid connected modes, minimizing the risk to the plant. 2. Wicket gates need modern controls: digital governors accelerate the parameter tuning process and gate position sensors improve controllability, so plants with mechanical governors should be upgraded. Furthermore, a black start and islanding mode should be established for controls to maximize plant performance. 3. Robust excitation support: the DC system or excitation generator needs to be reliable enough to form and sustain the rotor electromagnetic field. These systems are typically undersized in plants that were not designed for black start, so they will need to be upgraded. 4. Turbine-governor model validation and operator training: validation of a standard hydro governor model is needed to characterize the dynamic response (i.e., inertial and primary frequency response) of the GDH. This is required for control development and old hydropower plants often have outdated or incorrect models. Operator training is also typically required to ensure the hardware retrofits are utilized correctly during the black start process. 5. Transformer and cranking path energization: any upgradation and control adjustment in front of the POI will depend upon the existing interconnection. Coordination with the transmission or distribution operator may be required.

13 HYDRO ENERGY↗

Existing Methods for Grid Strength Assessment and Role of Hydropower in Future Grids

The power system is undergoing rapid evolution with increasing penetration of inverter-based resources (IBRs), large loads, microgrids, and power electronic devices. Ensuring reliable and stable operation of the modern power grid is a multi-faceted challenge that requires detailed understanding of this complex system. Dynamic stability is a major concern in maintaining the security of power grids as the generation mixes and large loads transitions to include high shares of power electronic devices. The operation of IBRs in regions with low system strength and higher grid impedances has been found to be the main reason behind many of the power system instabilities that manifest themselves in various types of oscillations and interactions that, if not properly addressed and damped, can jeopardize the reliable operation of the power system. Weak grid conditions compound such stability problems, particularly when many IBRs operate in proximity to and connect to weak power grids. Therefore, it is important to assess grid strength for planning, integration and operation of IBRs for a given power system. In this report, we aim to understand and classify existing methodologies for grid strength assessment, along with their limitations and future needs. Further, we aim to utilize the huge untapped potential in utilizing hydro energy resources in addressing some of the pertinent challenges of grid strength and reliable operation of modern power systems. Hydropower, historically valued for its flexibility and dispatchability, now faces new constraints due to reduced share of synchronous machines in the generation mix and seasonal variability of available water resources. Yet, these same plants present untapped potential beyond energy generation - notably, as providers of critical grid services. This report explores how hydropower plants, particularly through operation as synchronous condensers, can play a pivotal role in strengthening the grid amid evolving system dynamics.

13 HYDRO ENERGY↗

PEGASUS 5: An Automated Pre-Processor for Overset-Grid CFD

An all new, automated version of the PEGASUS software has been developed and tested. PEGASUS provides the hole-cutting and connectivity information between overlapping grids, and is used as the final part of the grid generation process for overset-grid computational fluid dynamics approaches. The new PEGASUS code (Version 5) has many new features: automated hole cutting; a projection scheme for fixing gaps in overset surfaces; more efficient interpolation search methods using an alternating digital tree; hole-size optimization based on adding additional layers of fringe points; and an automatic restart capability. The new code has also been parallelized using the Message Passing Interface standard. The parallelization performance provides efficient speed-up of the execution time by an order of magnitude, and up to a factor of 30 for very large problems. The results of three example cases are presented: a three-element high-lift airfoil, a generic business jet configuration, and a complete Boeing 777-200 aircraft in a high-lift landing configuration. Comparisons of the computed flow fields for the airfoil and 777 test cases between the old and new versions of the PEGASUS codes show excellent agreement with each other and with experimental results.

Suhs, Norman E.↗

PEGASUS 5: An Automated Pre-Processor for Overset-Grid CFD

This viewgraph presentation reviews the use and requirements of Pegasus 5. PEGASUS 5 is a code which performs a pre-processing step for the Overset CFD method. The code prepares the overset volume grids for the flow solver by computing the domain connectivity database, and blanking out grid points which are contained inside a solid body. PEGASUS 5 successfully automates most of the overset process. It leads to dramatic reduction in user input over previous generations of overset software. It also can lead to an order of magnitude reduction in both turn-around time and user expertise requirements. It is also however not a "black-box" procedure; care must be taken to examine the resulting grid system.

Rogers, Stuart E.↗