Search NASASearch

SEARCH · Search NASA

Results for “Carbon Capture, Utilization, and Storage (CCUS)”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,681 records · Page 5

Field Validation of a Grid-Interactive Efficient Building Software Solution

The U.S. General Services Administration's (GSA's) Green Proving Ground (GPG) program, in partnership with the National Laboratory of the Rockies (NLR), completed a field study of a Grid-Interactive Efficient Buildings (GEB) software solution. The study focused on a single testbed facility to test the GEB functionality of the software solution, along with other features. The testbed facility - a courthouse - is a common building type in GSA's vast building portfolio, offering potentially impactful findings on a scalable level. The study evaluated Prescriptive Data's technology, Nantum OS, a connected building operating system ("GEB Solution") which aggregates multiple sources of previously siloed building data and combines that data with external sources, such as weather information or utility signals, into a single integrated platform. A GEB Solution is a type of Energy Management Information System (EMIS). EMIS is defined as a system of devices, data services, and software applications that communicates with any building system or third-party data source to aggregate and transform data into new capabilities to aid in the optimization of energy use at the building, campus, or agency level. This specific GEB Solution is an EMIS with ASO, automated system optimization, offering supervisory control of certain aspects of the Building Automation System (BAS). Multiple features were evaluated including, but not limited to, Continuous Demand Management to avoid setting new monthly kilowatt (kW) peaks, energy efficiency for reduction of kilowatt hours (kWh) and natural gas consumption, and automated demand response (ADR) for purposes of lowering demand during a utility called Demand Response (DR) event. The testbed facility was the Foley Federal Building and US Courthouse ("Foley Federal Building") located in Las Vegas, NV. This is a 209,496 sq. ft. building constructed in the 1960s with major renovations in 2004. The facility was a good candidate due to the large prevalence of office and courthouse spaces in the GSA portfolio of buildings. It also has many features which allow integration into and control of the building and a strong facilities team to assist with the study. Quantitative and qualitative performance objectives were developed using GSA's GPG GEB project template along with input from the vendor and building facility staff; these are outlined in Table 1. The quantitative performance objectives focused on continuous demand management, energy efficiency, and automated demand response. The qualitative performance objectives focused on the ease of installation and commissioning as well as the operability of the GEB solution. Other performance metrics that are reported on include carbon reduction, cost effectiveness, and occupant acceptance.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Capturing Secondary Kinetic Instabilities in Three‐Dimensional Dayside Reconnection Using an Improved Gradient‐Based Closure

Magnetic reconnection is a highly dynamic process that excites a wide variety of kinetic waves and instabilities. Transverse current sheet instabilities such as the lower-hybrid drift and secondary drift-kink instabilities in particular have been shown by kinetic simulations to modify the reconnection and introduce significant turbulence and mixing to the reconnection layer. Past studies using the ten-moment fluid model to capture important kinetic physics such as the electron inertia and full representation of the pressure tensor proved advantageous to a two-fluid representation of reconnection, but the model struggled when using a local relaxation closure for the heat flux to replicate the current sheet instabilities and subsequent mixing seen in kinetic simulations. This work uses the Gkeyll software framework to perform simulations of asymmetric reconnection based on the 16 October 2015 MMS crossing of a diffusion region, the Burch event. An improved gradient-based heat flux closure is implemented, showing significant improvement in secondary kinetic instabilities that grow in the current sheet. These instabilities generate turbulence which leads to growth of secondary magnetic islands and flux ropes.

Bradshaw, K. [Princeton University, NJ (United Sta

Trace benzene capture by decoration of structural defects in metal–organic framework materials

Abstract Capture of trace benzene is an important and challenging task. Metal–organic framework materials are promising sorbents for a variety of gases, but their limited capacity towards benzene at low concentration remains unresolved. Here we report the adsorption of trace benzene by decorating a structural defect in MIL-125-defect with single-atom metal centres to afford MIL-125-X (X = Mn, Fe, Co, Ni, Cu, Zn; MIL-125, Ti 8 O 8 (OH) 4 (BDC) 6 where H 2 BDC is 1,4-benzenedicarboxylic acid). At 298 K, MIL-125-Zn exhibits a benzene uptake of 7.63 mmol g −1 at 1.2 mbar and 5.33 mmol g −1 at 0.12 mbar, and breakthrough experiments confirm the removal of trace benzene (from 5 to <0.5 ppm) from air (up to 111,000 min g −1 of metal–organic framework), even after exposure to moisture. The binding of benzene to the defect and open Zn(II) sites at low pressure has been visualized by diffraction, scattering and spectroscopy. This work highlights the importance of fine-tuning pore chemistry for designing adsorbents for the removal of air pollutants.

Chemistry

Integrating AI Data Centers with the Power Grid

The rapid expansion of artificial intelligence (AI) has triggered an unprecedented surge in electricity demand, with US data center energy use projected to double or triple 2023 levels by 2028. This exponential growth places strain on grid infrastructure, which can hinder timely construction of desired computing capacity. To bridge this supply-demand gap, utilities and AI developers are increasingly turning to demand flexibility, a strategy that incentivizes shifting or reducing power use during peak periods of grid stress. Data centers are uniquely equipped for flexible operations due to their digital workloads, built-in redundancy, and onsite energy assets. This article outlines four primary mechanisms to enable data center flexibility: computational load flexibility (shifting tasks temporally or geographically), flexible use of core facility infrastructure adjustments, energy storage utilization, and onsite electricity generation. To encourage adoption, utilities are deploying new tariff designs, including voluntary interruptible service riders, mandated flexibility requirements, and streamlined interconnection processes for flexible loads. For the highly capitalized and rapidly growing AI industry, the primary motivators for embracing these strategies are expediting facility interconnection, satisfying emerging regulatory mandates, and mitigating community resistance. While demand flexibility cannot substitute the long-term need for new bulk power generation, it serves as an essential, immediate solution for enabling near-term deployment. By transforming data centers from grid stressors into stabilizing assets, flexible operations can ensure reliable grid integration, ease market pressures, and support a resilient power system.

24 POWER TRANSMISSION AND DISTRIBUTION

Development and Evaluation of a Cost-Effective Behind-the-Meter Synchronized Measurement Unit for Enhanced Grid Integration

This paper presents the development of the Inverter Based Resource Monitor (IBRM), an innovative behind-the-meter synchronized measurement unit (SMU) tailored for integration with inverter-based resources (IBRs). The IBRM distinguishes itself as a highly accurate and cost-effective SMU, offering facile deployment and connectivity to IBRs. It is equipped to conduct real-time voltage and current waveform analyses, serving as a phasor measurement unit (PMU) with exceptionally rapid synchrophasor transmission capabilities. The device incorporates a cutting-edge dual-core architecture designed to minimize sampling delays inherent to its microprocessor, thereby enhancing the precision of synchronized waveform measurements. Moreover, the IBRM is adept at recording high-fidelity waveform data, capturing nuances such as waveform distortions, high-order harmonics, and wide-band oscillations prevalent in power grids with substantial IBR presence. A prototype of the IBRM has been constructed and subjected to rigorous testing to assess its functional capabilities and measurement precision, utilizing both idealized signal generators and a real-world off-grid inverter setup as benchmarks.

Wu, Ori [ORNL] (ORCID:0000000326723410)

Alumina–Titania Nanolaminate Condensers for Hot Programmable Catalysis

Nanolaminates composed of thin alternating layers of Al2O 3 and TiO 2 (ATO) were engineered by using atomic layer deposition as the dielectric material for a Pt-on-carbon catalytic condenser. Investigation assessed synthesis parameters including the deposition temperature, Al 2 O 3 and TiO 2 layer thicknesses, total number of layers, and a capping Al 2 O 3 layer on the maximum charge accumulation in the Pt catalyst. The highest capacitance ATO configuration demonstrated a specific capacitance of ∼1200 nF/cm 2 with working voltages of ±5 V, enabling the storage of 4 × 10 13 electrons or holes per cm 2 at room temperature. The ATO devices exhibited enhanced capacitance at elevated temperatures of up to 400 °C, suggesting the suitability of these materials for high-temperature applications. Adsorption of carbon monoxide on the Pt/C-ATO device characterized by grazing incidence infrared spectroscopy showed changes in the surface binding energy of 13.1 ± 0.8 kJ/mol for an applied external voltage bias of ±1 V.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH

An Assessment of the Nevada Test Site for Low-Level Waste Management

This report presents a summary of description information, facilities, and operating practices at the Nevada Test Site. It is concluded that NTS is not only a feasible location for surface and near-surface storage of low-level wastes, but also a potential site for underground storage of higher level wastes.

052002* -- Nuclear Fuels-- Waste Disposal & Storag

R&D GREET Battery Carbon Footprint Calculator

The Battery Carbon Footprint (CF) Calculator was developed to help U.S. battery manufacturers meet the carbon footprint reporting requirements of the EU Battery Regulation (EU) 2023/1542. The calculator incorporates several major battery carbon footprint frameworks, including the Joint Research Centre's Rules for the Calculation of the Carbon Footprint of Electric Vehicle Batteries (CFB-EV), RECHARGE's Product Environmental Footprint Category Rules for High Specific Energy Rechargeable Batteries for Mobile Applications (PEFCR), the Catena-X Product Carbon Footprint Rulebook (CX-PCF Rules), Battery Pass's Battery Carbon Footprint: Rules for Calculating the Carbon Footprint of the "Distribution" and "End-of-Life and Recycling" Life Cycle Stages, the Global Battery Alliance's Greenhouse Gas Rulebook: Generic Rules, Version 2.1, and the Ministry of Economy, Trade and Industry's draft Carbon Footprint Calculation Method for Automotive Batteries. The tool pairs these frameworks with foreground data from Argonne's R&D GREET models and integrates user-supplied background data covering battery manufacturing and supply chain activities. By bringing multiple international methodologies together in a single platform, the calculator enables manufacturers to evaluate product carbon footprints, improve data consistency, and prepare for evolving regulatory compliance and global market reporting requirements.

Zhang, Jingyi

Uncertainty quantification for competing failure mechanisms in unidirectionally reinforced carbon–carbon composites

Microstructure-informed finite element models play a key role in the carbon–carbon composite design process. Variability in manufacturing process parameters and experimental limitations introduce model parameter uncertainty. This study quantifies the effect of model parameter uncertainty on transverse tensile fracture behavior and proposes a methodology to predict the failure mode based on competing microscale damage mechanisms. Finite element simulations incorporate fiber–matrix interface debonding with cohesive zones and matrix damage with a smeared crack band approach in a unidirectional carbon–carbon composite. Results from a variance-based global sensitivity analysis identifies interfacial and matrix damage parameters as the primary source of variability in fracture behavior. Sobol’ indices indicate that matrix and cohesive zone strengths contribute 94% of the variance in the effective ultimate stress. A local analysis elucidates the relationship between these constituent strength parameters and failure mode by estimating the probability of cohesive, matrix, and mixed-mode dominated failure. Based on the results for 4000 simulations, 93% exhibit mixed-mode or interfacial dominated failure, which underscores the crucial role of fiber–matrix interface debonding in the transverse tensile failure of carbon–carbon composites. These uncertainty quantification results facilitate more efficient model calibration and provide a framework for microstructure-informed failure predictions in the face of manufacturing-induced uncertainty.

36 MATERIALS SCIENCE

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Renewable Energy and Efficiency Technologies in Scenarios of U.S. Decarbonization in Two Types of Models: Comparison of GCAM Modeling and Sector-Specific Modeling

Energy system projections from analytic models inform actions ranging from short-term and local decisions, such as technology and infrastructure deployment, to global and long-term negotiations and targets. Computational limits require the designers of these models to trade off between coverage and resolution. Some models, such as the Global Change Analysis Model (GCAM), represent all energy sources and uses but at a relatively coarse level of resolution. GCAM balances global supply and demand of all energy carriers by endogenously projecting prices for energy sources and costs of greenhouse gas mitigation while capturing interlinkages between the energy system, water, agriculture and land use, the economy, and the climate. This global model was used to frame the Long-Term Strategy released by the White House in 2021 and has been used to inform national and global economy-wide decarbonization discussions and strategy development for decades. Other models instead focus on a portion of the energy sector with greater detail and resolution. The Regional Energy Deployment System (ReEDS) electricity-sector model, for example, projects capacity expansion with an emphasis on integration of variable renewable energy into the grid of the future. The Transportation Energy and Mobility Pathway Options (TEMPO) transportation-sector model enables analysis of household choices in adoption, charging, and use of electric vehicles. The Scout buildings-sector model supports detailed consideration of the policies and markets that can accelerate the adoption of energy conservation measures in buildings. Such sector-specific models are instrumental in informing technology research, sectoral planning strategies, and sector-specific aspects of greenhouse gas (GHG) mitigation strategies in the United States. These global and sector-specific modeling approaches can complement each other. The global approach ensures consistent, endogenous energy pricing and resource allocation, which can substantially diverge from current conditions in transformative scenarios, while the sector-specific approach facilitates representation of granular details across spatial, temporal, technological, and market dimensions that enable exploration of particular interactions and trade-offs. This report presents the results of recent work to explore the differences and tradeoffs between these approaches by comparing GCAM with the sector-specific ReEDS, TEMPO, and Scout models. The report compares both model structures and results, and discusses their potential relevance and applications.

29 ENERGY PLANNING, POLICY, AND ECONOMY