Methods for Assessing Opportunities for Ring Dam Pumped Storage Hydropower

There is growing interest in new pumped storage hydropower (PSH) deployment to provide a range of grid flexibility, reliability, and resiliency services under an evolving and uncertain future power sector. The National Laboratory of the Rockies develops open PSH resource assessment and cost modeling tools to help evaluate PSH deployment opportunities, and this report describes expansions to those tools to consider an additional PSH system configuration - ring-dam reservoirs built on flat topographical features that are constructed from roller-compacted concrete material. This reservoir type is common among current PSH proposals and requires new methods to identify sites with this reservoir geometry throughout the United States and characterize the associated dam cost. Cost characterization for ring dam reservoirs required collecting historical dam cost data for earthen, rockfill, and roller-compacted concrete dams and regressing equations that relate costs between alternative materials. The ring dam site identification algorithm follows a 5-step procedure to identify circular geometry reservoirs. Once ring dam reservoirs are identified, they are then paired with potential dry-gully reservoirs, and the full set of potential paired reservoirs is cost-optimized to produce a least-cost set of potential PSH sites with no overlapping reservoirs. The resulting analysis found 1,663 ring-dam to dry-gully systems in the contiguous United States that are lower cost than any overlapping dry-gully to dry-gully systems, 29 in Alaska, and none in Hawaii or Puerto Rico. These systems constitute 1.5 TW of capacity in the contiguous United States and nearly 29 GW in Alaska, demonstrating that under suitable topography and head, ring-dam systems can provide cost-effective PSH opportunities. The greatest density of these opportunities are found in the intermountain west where there are mesas and flat land at bases of mountain ranges, but continued work could incorporate additional site characteristics or consider more complex reservoir shapes to find additional PSH deployment opportunities.

13 HYDRO ENERGY↗

Enhancing Lifetime and Reducing Costs for Fish Diversion Netting Structures (Abstract)

This effort will focus on technology transfer and commercialization of antifouling coatings with an enthusiastic and engaged industrial team. Environmental requirements and operational demands call for a nontoxic coating/paint to prevent fouling on fish passage guidance netting at hydropower facilities. For example, one netting customer estimated the capital cost for compliance at $\$12$ million to $\$15$ million. This project will build partnerships between PNNL and private companies to optimize, demonstrate, mature, and commercialize a novel PNNL-developed technology that addresses this critical coating need of the hydropower industry. This effort will support modification of existing coatings for application to flexible netting structures. Industrial partners include commercial coating development specialist (Lorama), hydrophobic material manufacturer and paint developer (Dry Surface Technologies), aquatic applications specialists (Prometheus Innovations and River Connectivity Systems), and hydropower netting producer (Pacific Netting Products). Engagement with the U.S. Army Corps of Engineers (USACE) and Bureau of Reclamation (BOR), two hydropower operators, throughout the project will provide expertise and field test sites that will provide crucial proof of real-world performance data (additional details provided in Teaming section). Taylor Shellfish Farms will provide organisms and fouling expertise as well as a perspective of potential broader impacts for the blue economy. Sample netting will demonstrate performance in a range of environments for key hydropower applications. PNNL will work with industrial partners to overcome commercialization barriers as well as resolving any manufacturing or regulatory issues. This Phase 1 effort is focused on technology optimization for application to fish passage guidance netting and technology validation as verified by independent testing (through USACE, BOR, Taylor Shellfish and Prometheus Innovations). Through this effort, SLIC will be demonstrated for netting applications at technology readiness level (TRL) 5. The field test data will allow optimization of SLIC formulation and performance which is key to enabling technology transfer of a mature proven technology to industry and production of a viable commercial product specifically focused for hydropower needs.

13 HYDRO ENERGY↗

Evaluating power grid model hydropower feasibility with a river operations model

Production cost models (PCMs) simulate dispatch of generators across a large power grid and are used widely by planners to study the reliability of electricity supply. As energy systems transition away from the thermoelectric technologies that have traditionally balanced electricity supply and demand, hydropower and its representation in PCMs is of increasing importance. A limitation of PCMs applied to continental power grids with diverse generation portfolios is that hydropower generation is simulated without full consideration of complex river dynamics, leading to possible misrepresentation of grid flexibility and performance. In addition, data used in PCMs may reflect outdated operating policies. In this paper we propose a hydropower generation feasibility test for PCMs. The approach uses a detailed hydropower model to determine whether the hourly hydropower schedule from a PCM with simplified monthly parameterization can be attained after accounting for realistic river dynamics and operating policies, such as spill requirements and general water movement and balance through a cascade reservoir system. We perform this hydropower generation test for the ‘Big 10’ hydropower system on the Columbia River (part of the Western Interconnect of the United States), revealing 9% overestimation of available hydropower generation in a PCM solution in an average hydrologic year. Our evaluation provides insight on the cost and opportunities for better representing hydropower in PCMs.

54 ENVIRONMENTAL SCIENCES↗

1.2.2.405 HydroWIRES Topic D1: Capacity Expansion Model (CEM) Enhancements

Long-term grid planning tools have difficulty representing detailed hydropower operating characteristics, which depend not only on technological specifications but also on water management practices and regulations. As a result, the value of hydropower is incompletely characterized, and the potential role of hydropower in the performance and resiliency of the future electric grid is not fully understood. This work will fill that gap by developing new ways to represent hydropower resource, technology, and operational characteristics in electric sector capacity expansion models and implementing them in the open-source version of the National Renewable Energy Laboratory's Regional Energy Deployment System (ReEDS) model. ReEDS is a well-established national scale grid planning tool used since 2003 by the U.S. Department of Energy and others to explore the evolution of the U.S. electric sector. Improvements will include a comprehensive national resource assessment for pumped storage hydropower and methods for modeling multiple hydropower technology categories characterized by technical, regulatory, and economic characteristics. The project will provide guiding principles and strategies for improving hydropower modeling in capacity expansion models and deliver a first-of-its kind versatile PSH dataset. All data, code, and methods will be publicly available, allowing the industry to better identify the value of hydropower in the future electricity system and make more informed planning decisions.

capacity expansion↗

Using energy storage systems to extend the life of hydropower plants

Despite their advantages, distributed energy resources (DERs) bring inherent uncertainty and variability into the landscape of modern power systems. As DER penetration grows, conventional generators like hydropower plants have to respond more often to arrest the imbalance in the net load. Hydropower turbines provide their best operational performance with minimal wear and tear when operating at regions of maximum efficiency. However, the current needs for hydropower plants require them to operate under varying load conditions and thus sub-optimal operating points leading to additional stress. To relieve the hydropower plants, this paper proposes a hybridization strategy where a hydropower unit is paired with an energy storage system (ESS) to increase operational flexibility and mitigate damage to the hydro plant. Models are developed to represent the operation of the hybrid system, quantify degradation, and assess economic benefits. Moreover, an innovative controller disaggregates the market dispatch signal into separate control setpoints for the ESS and hydropower unit. In case studies performed on a real-world hydropower facility, it was found that the ESS-based hybridization can extend the life of the hydropower plant by 5% on average. Notably, the economic benefits from reduced maintenance and deferred investment are estimated to be around $3.6 million.

13 HYDRO ENERGY↗

A Cloud-Based Decision Support System Framework for Hydropower Biological Evaluation

Hydropower has become one of the most important energy sources: it accounts for more than 80% of the world’s renewable energy and about 16% of all the energy in the world. Significantly more hydropower capacity is planned to be developed. However, hydro-structures, including powered dams, may have adverse biological effects on fishes, especially on migrating fish. For instance, fish can be injured or even killed when they pass through turbines. This is why biological evaluations on hydro-structures are greatly needed to estimate fish injury and mortality rates. The Hydropower Biological Evaluation Toolset (HBET) is an integrated suite of science-based desktop tools designed to evaluate whether the hydraulic conditions of hydropower structures are fish friendly by analyzing collected data and providing estimated injury and mortality rates. Sensor Fish, a small, autonomous sensor package, is used by HBET to record data describing the conditions that live fish passing through a hydropower structure will face. In this paper, we incorporated cloud computing into HBET, and migrated it into a cloud-based decision support system framework for hydropower biological evaluation. This will make the evaluation systems more scalable and flexible; however, this also introduces a significant challenge: how to maintain the security while retaining scalability and flexibility. We discuss the technical methodologies and algorithms implemented in the proposed framework, and analyze the countermeasures implemented therein.

Decision Support System, Hydropower, Dam, Fish Inj↗

Energy-Flow-Environment Linkage Map

Understanding how flexibility in environmental requirements can facilitate co-optimization of hydropower production outcomes and environmental outcomes is critical for future grid decision-making and operations as renewable energy resources increase. The environmental and power system outcomes connectivity linkage maps presented here provide a framework for conceptually and quantitatively linking power system outcomes to environmental outcomes through hydropower flow decisions. The Executive Summary Map serves as a starting for exploring the links between hydropower system performance outcomes and environmental outcomes. The centralized topic is “Flow from Hydropower System,” and connects the hydropower operations through “Flow through turbines” and “Non-turbine flows”, and to environmental outcomes through Reservoir elevation” and “Flow downstream of the hydropower system”. To the left of these central topics, “Hydro-mechanical operations” are linked through “Hydro-electrical operations” to “Hydropower performance outcomes” (“Reliability”, “Resilience”, “Revenue”, “Emissions”). On the right, environmental outcomes are grouped together by their physical location: “Upstream Outcomes” (“Upstream geomorphology”, “Upstream recreation”, “Upstream habitat”, “Upstream biota and biodiversity”, “Upstream water quality and greenhouse gas”), Outcomes relevant to both “Upstream/downstream or dam interface” (“Navigation”, “Dam safety and maintenance", “Human health”, “Water supply”, “Flood control”, ”Fish passage”), and “Downstream outcomes“ (e.g., “Downstream geomorphology”, “Downstream recreations”, “Downstream habitat”, “Downstream biota and biodiversity”, “Downstream water quality and greenhouse gas”). Each of these subtopics (e.g., “Hydro-mechanical operations”, “Hydro-electrical operations”, “Upstream geomorphology”, “Upstream recreation”) is further explored through their corresponding submaps. The “Read Me” file provides more detail information on map navigation. The “Models and tools database” file provides detailed information of models and tools presented in the maps.

13 HYDRO ENERGY↗

Hydropower Black Start: A Guidebook for Retrofitting Grid Dependent Hydropower

Not all United States (US) hydropower plants were designed to provide black start, but they are increasingly needed to uphold resilience in the evolving electric grid. This guidance is designed to help understand the minimal retrofits required for grid dependent hydropower (GDH) plants behind the point of interconnection (POI). For distribution connected hydropower plants or those with dedicated cranking paths, such upgrades can be sufficient for the plant to provide black start. For others, more coordination with the transmission system operator will be needed. This guidebook answers a number of questions relevant to retrofitting hydropower plants with black start capabilities. For example, the guidebook answers: • How flexible do the wicket gate controls need to be? • Who needs to do hydro governor model validation, why, and how? • How robust and flexible do the excitation and AVR controls need to be? • What protection settings need to be adjusted? • What relay(s) will need to be bypassed or overridden and at what risk? • What is the electrical energy demand of the station load or auxiliary power systems? • What should the strategy to energize transformer(s) along cranking path to address inrush currents be? • How should the critical load restoration be sequenced? In addition to outlining the specifications that hydropower plants need to meet for each component to be able to perform black start, this guidebook provides a set of case studies for specific upgrades needed at actual plants. Between the case studies of plants that have already performed black start retrofits and the examples of how this guidebook can be applied to scope future retrofits, five key themes have been identified for retrofit needs. 1. Protection needs “black start” mode: hydropower plants that are not designed with black start capabilities will have protections that prevent them from interconnecting to a “dead bus.” These protections will need to be overridden in every retrofit case and a separate black start mode should be established so that operators can safely switch between black start and grid connected modes, minimizing the risk to the plant. 2. Wicket gates need modern controls: digital governors accelerate the parameter tuning process and gate position sensors improve controllability, so plants with mechanical governors should be upgraded. Furthermore, a black start and islanding mode should be established for controls to maximize plant performance. 3. Robust excitation support: the DC system or excitation generator needs to be reliable enough to form and sustain the rotor electromagnetic field. These systems are typically undersized in plants that were not designed for black start, so they will need to be upgraded. 4. Turbine-governor model validation and operator training: validation of a standard hydro governor model is needed to characterize the dynamic response (i.e., inertial and primary frequency response) of the GDH. This is required for control development and old hydropower plants often have outdated or incorrect models. Operator training is also typically required to ensure the hardware retrofits are utilized correctly during the black start process. 5. Transformer and cranking path energization: any upgradation and control adjustment in front of the POI will depend upon the existing interconnection. Coordination with the transmission or distribution operator may be required.

13 HYDRO ENERGY↗

Transforming the U.S. Market with a New Application of Ternary-Type Pumped-Storage Hydropower Technology: Preprint

As the deployment of wind and solar technologies increases at an unprecedented rate across the United States and in many world markets, the variability of power output from these technologies expands the need for increased power system flexibility. Energy storage can play an important role in the transition to a more flexible power system that can accommodate high penetrations of variable renewable technologies. This project focuses on how ternary pumped storage hydropower (T-PSH) coupled with dynamic transmission can help this transition by defining the system-wide benefits of deploying this technology in specific U.S. markets. T-PSH technology is the fastest responding pumped hydro technology equipment available today for grid services. T-PSH efficiencies are competitive with lithium-ion (Li-ion) batteries, and T-PSH can provide increased storage capacity with minimal degradation during a 50-year lifetime. This project evaluates T-PSH for grid services ranging from fast frequency response (FFR) for power system contingency events and enhanced power system stability to longer time periods for power system flexibility to accommodate ramping from wind and solar variability and energy arbitrage. In summary, this project: Compares power grid services and costs, including ancillary services and essential reliability services, for T-PSH and conventional pumped storage hydropower (PSH) - Evaluates the dynamic response of T-PSH and PSH technologies and their contribution to essential reliability services for grid stability by developing new power system model representations for T-PSH and performing simulations in the Western Interconnection - Evaluates production costs, operational impacts, and energy storage revenue streams for future power system scenarios with T-PSH focusing on time frames of 5 minutes and more - Assesses the electricity market-transforming capabilities of T-PSH technology coupled with transmission monitoring and dynamic control. This paper presents an overview of the methodology and initial, first-year preliminary findings of a 2-year in-depth study into how advanced PSH and dynamic transmission contribute to the transformation and modernization of the U.S. electric grid. This project is part of the HydroNEXT Initiative funded by the U.S. Department of Energy (DOE) that is focused on the development of innovative technologies to advance nonpowered dams and PSH. The project team consists of the National Renewable Energy Laboratory (project lead), Absaroka Energy, LLC (Montana-based PSH project developer), GE Renewable Energy (PSH pump/turbine equipment supplier), Grid Dynamics, and Auburn University (lead for NREL/Auburn dynamic modeling team).

13 HYDRO ENERGY↗

Impacts of Alternative Operations and Renewable Energy Deployment on Columbia River Hydropower

The Columbia River Treaty Tribes in the Pacific Northwest - the Nez Perce, Umatilla, Warm Springs, and Yakama - hold treaty-reserved fishing rights for the Columbia River, one of the world's most productive salmon rivers and a critical resource for these tribes. However, the tribes have expressed that current operating regimes of hydropower dams throughout the Columbia River Basin (CRB) do not fully account for tribal fishing rights and have negatively impacted fish populations. Four tribes acting together through the Columbia River Inter-Tribal Fish Commission (CRITFC)'s 2022 Energy Vision stated that current power system models often do not fully account for the many constraints faced by hydropower facilities in the CRB. As the deployment of variable renewable energy (VRE) like solar and wind continues to increase, power system flexibility will become increasingly important. As a result, there is a growing need to better understand the true capabilities of the hydropower generation fleet while accurately accounting for ecological constraints (Northwest Power and Conservation Council 2022). Understanding hydropower's role in a future grid with a higher share of VRE can inform water resources planning to address ecological needs. The goal of this study is to examine the impacts of alternative hydropower operation rules and weather variability on hydropower generation and grid operations in VRE and transmission infrastructure deployment scenarios. The study evaluates how hydropower scheduling practices can reduce ecological impacts to the region's salmon populations. More specifically, the study examines the impact of today's dam water release rules (called "adjusted base water rules" in this study) and new, ecologically informed water release rules (called "ecosystem water rules" in this study) on two VRE scenarios (current renewable energy levels and higher renewable energy levels) using six weather years for each scenario (2008-2013). CRITFC developed the ecosystem water rules, which capture a portion of the changes they recommend for CRB hydropower operations. These analyses use a water resource planning model (OASIS) and a production cost model (PLEXOS) to simulate CRB reservoir cascade and Western Interconnection power grid operation.

13 HYDRO ENERGY↗

Charting Hydropower's Role in the Next-Generation Grid

To build a 100% clean energy power sector, the United States is adding more energy storage and variable renewable energy sources, like solar power and wind energy, to the grid. Hydropower and pumped storage hydropower (PSH) can help with both. These technologies already play a key role in providing flexible, low-carbon electricity to the U.S. power grid, and this role will become even more valuable as that grid evolves. That's why researchers at the National Renewable Energy Laboratory (NREL) are analyzing how the U.S. electricity sector could invest in hydropower and PSH using new data and modeling capabilities.

HYDRO ENERGY↗

Coordinated operation of pumped-storage hydropower with power and water distribution systems

Small pumped-storage hydropower (PSH) units have gained popularity as distributed energy storage options that can provide flexibility to the operation of power distribution systems. Optimal operation of small PSH units is not only dependent on the energy storage provided to power distribution system, but also on the inflow and outflow of water from and to the water distribution system. Here, in this context, this paper develops an optimization model for coordinated operation of PSH units with power and water distribution systems. The proposed model optimizes the operation of water tanks, variable-speed pumps and PSH in pumping and generating modes to minimize the operation cost of power distribution system, while respecting the power flow constraints of power distribution and hydraulic constraints of water distribution system. Appropriate electricity tariffs are implemented to avoid additional expenses in water distribution system that can be enforced by its coordinated operation in favor of power distribution system. The proposed model is implemented on a 33-bus and a 123-bus test power distribution system connected to a 16-node test water distribution system. Results demonstrate the effectiveness of proposed model in tapping PSH flexibility to reduce the operation cost of power and water distribution systems, while meeting the power and water demands.

13 HYDRO ENERGY↗

Simulation of hydropower at subcontinental to global scales: a state-of-the-art review

Abstract Hydroelectric power is playing a new and often expanded role in the world’s major power grids, offering low carbon generating capacity in industrializing, dam-building economies while providing reserve and flexibility to co-manage fledgling wind and solar resources in high income countries. Driven by river flows, conventional hydropower is exposed to the vagaries of weather and climate, motivating drought and climate change hydropower impact studies at large spatial scales. Here we review methods of climate-driven hydropower simulation at large spatial scales, specifically multi-basin regions to global. We identify four types of approach based on complexity of tools and richness of data applied to the problem. Since the earliest attempts to model climate-driven hydropower at continental scale almost two decades ago, the field has transitioned from one of scientific curiosity to practical application, with studies increasingly motivated by the need to inform power grid expansion planning and operation. As the hydrological and water management models used in large-scale hydropower studies become more sophisticated, new opportunities will emerge to study the impacts of changing hydropower on power system reliability and performance at large power grid scale. To grasp these opportunities, the water resources community must continue to enhance data and models for representing river flows and anthropogenic water use and management at subcontinental to global scales.

13 HYDRO ENERGY↗

Hydropower Energy Storage Capacity Dataset

The Hydropower Energy Storage Capacity (HESC) Dataset catalogues estimates of nominal energy storage capacity based on varying levels of detail. Dams and reservoirs selected were selected based on those reported in the National Inventory of Dams (NID 2019) and/or the Global Reservoir and Dam (GRanD v1.3) datasets. These data provide a foundation for understanding available resources at existing hydropower facilities and their potential to provide storage of energy and more flexible generation. Current estimates include Level 1 (based on maximum storage capacities and hydraulic head) and Level 2 (based on historical models or observations of reservoir volume and hydraulic head). For facilities where installed capacity is known, there are also estimates for discharge duration or the length of time when a facility could provide generation at a given capacity. Essential information used to calculate the energy storage capacity and discharge duration (volume, hydraulic head, and details about the sources or records used to obtain those parameters) and summaries of historical generation (for context) are also included.

13 HYDRO ENERGY↗

Hydropower Energy Storage Capacity (HESC) Dataset

The Hydropower Energy Storage Capacity (HESC) Dataset catalogs characteristics that are relevant to evaluating reservoir storage and estimates of energy storage capacity based on varying levels of detail. Hydropower dams and reservoirs were included based on information from the National Inventory of Dams (NID; USACE, 2021) and Global Reservoir and Dam (GRanD v1.3) and Existing Hydropower Assets datasets. These data provide a foundation for understanding available resources at existing hydropower facilities and their potential to provide storage of energy and more flexible generation. Estimates of energy storage capacity include: • Level 1 – nominal energy storage capacity based on maximum storage capacities and hydraulic head • Level 2 – nominal energy storage capacity based on historical models or observations of reservoir volume and hydraulic head. These estimates are provided based on capacity from the entire historical period as well as monthly values. • Level 3 – modeled energy generation based on volume-elevation relationships, historical storage, observed/modeled inflows, and hydraulic capacity of turbines and calculated both as overall and on a monthly basis. • Level 4 – modeled energy generation incorporating information from Level 3 and operational constraints. For facilities where installed capacity is known, there are also estimates for discharge duration (the length of time when a facility could provide generation at a given capacity).

13 HYDRO ENERGY↗

Inspiring Tomorrow's Water Power Workforce to Lead the Clean Energy Revolution

Renewable water power, including hydropower and marine energy, will play a key role in building a reliable and flexible 100% clean energy future. That future needs a larger, modern workforce - one that's more diverse, equitable, and inclusive - to power and improve these technologies. And researchers at the National Renewable Energy Laboratory (NREL) are committed to fostering tomorrow's water power workforce through science, technology, engineering, and mathematics (STEM) and workforce development programs. Through events, online resources, and more, the lab aims to engage and inspire students to dive into careers in water power.

HYDRO ENERGY↗

Inspiring Tomorrow's Water Power Workforce to Lead the Clean Energy Revolution

Renewable water power, including hydropower and marine energy, will play a key role in building a reliable and flexible 100% clean energy future. That future needs a larger, modern workforce - one that's more diverse, equitable, and inclusive - to power and improve these technologies. And researchers at the National Renewable Energy Laboratory (NREL) are committed to fostering tomorrow's water power workforce through science, technology, engineering, and mathematics (STEM) and workforce development programs. Through events, online resources, and more, the lab aims to engage and inspire careers in water power.

app↗

Mutually beneficial outcomes for hydropower expansion and environmental protection at a basin scale

Reshaping the scale of planning for hydropower development, from reaches to basin-scales, has been recommended as a more effective way to ameliorate the environmental impacts of hydropower. One approach is identifying mutually exclusive areas where development is precluded for conservation purposes and areas of low conservation value that present fewer barriers to development. This strategy, however, is less adoptable in developed countries where hydropower is already widespread and large-scale construction of new dams is unlikely. To broaden the adoption of basin-scale planning, alternative approaches and planning tools are needed for identifying mutually beneficial opportunities for simultaneous increases in hydropower capacity while improving environmental conditions. In this study, we present the Basin Scale Opportunity Assessment as a methodology to improve environmental conditions through either direct (on-site) or indirect (off-site) mitigation. We assess whether direct or indirect mitigation activities lead to optimal results in terms of added hydropower, environmental improvement, and monetary cost at a basin scale. We present two case studies for the Connecticut River and Roanoke River Basins, USA. Significant opportunities for expanding hydropower generating capacity are numerous in both basins. Results suggest that total hydropower capacity could be increased 4 to 7 % in the Roanoke and Connecticut Basins, respectively, without new dam construction and with net improvements in environmental conditions. We found that environmentally and economically optimal win-win strategies for increasing hydropower capacity and improving environmental conditions included improving environmental conditions in rivers downstream of existing dams. Off-site mitigation opportunities, such as dam removal and wetland mitigation, were identified as optimum solutions for achieving net environmental improvements only when they were associated with new hydropower construction. Our results demonstrate that opportunities to increase hydropower capacity and improve environmental conditions are expanded by viewing cumulative benefits at basin scales; however, increasing regulatory flexibility may be required to realize these opportunities.

54 ENVIRONMENTAL SCIENCES↗