Results for “microgrid transition”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Grid-Forming Inverters: Project Demonstrations and Pilots

Power system operators around the world are pushing the limits of integrating inverter-based resources (IBRs) to very high levels, approaching 100% instantaneous penetration under certain operating conditions. This often applies to smaller power systems with very little or no ac interconnections to other neighboring regions or sometimes to fringes of large balancing areas, such as Denmark or Portugal, within the mainland European power system. These jurisdictions have identified the potential of grid-forming (GFM) technology as a key enabler to support the energy transition with very few or no synchronous generators online. Until recently, practical applications of GFM inverters were limited to microgrids and isolated grids and in smaller grid applications on the order of a few tens of megawatts (MW).

Australia↗

Overcoming Resilience Challenges on the Outer Banks of North Carolina

In 2021, the Town of Nags Head, located in the Outer Banks region of North Carolina, was among the first cohort of coastal and island communities to participate in the U.S. Department of Energy's Energy Transitions Initiative Partnership Project (ETIPP), which offers technical assistance and cash awards to competitively selected coastal, remote, and island communities seeking to transform their energy systems and increase their energy resilience. As a barrier island separated from mainland North Carolina, Nags Head experiences impacts from extreme weather events, including power outages, especially during hurricane season. To address challenges, the Nags Head ETIPP team sought to improve the town's disaster resilience by ensuring that critical facilities can remain powered during and after extreme events. With support from experts at Sandia National Laboratories, the National Renewable Energy Laboratory, and the Coastal Studies Institute, the community team identified the following goals for its participation in ETIPP: 1. Identify and prioritize critical facilities that, when powered during disruptions, support the town's resilience. 2. Analyze the potential for on-site solar photovoltaic (PV) and storage systems at 2-4 prioritized critical facilities owned and/or operated by the town. 3. Analyze the potential for interconnecting solar PV and storage systems at a cluster of public and privately owned facilities into a resilient microgrid. 4. Explore finance options and utility interconnection requirements and compensation mechanisms. 5. Summarize outcomes and next steps for town leadership.

25 ENERGY STORAGE↗

Forming Interphase Microgrids in Distribution Systems Using Cooperative Inverters

Interphase-microgrids formed by three islanded single-phase feeders in distribution systems are proposed in this paper. Loss of utility caused by natural and human-made disasters may isolate each residential subdivision from the utility. In this case, the household loads are supplied by distributed generation (DG) units which may not be enough to meet the load demand. This can lead to deviations in voltage and frequency, and the deviations may vary for each phase. The proposed solution is to form an interphase-microgrid by seamlessly interconnecting the islanded single-phase feeders. This interphase-microgrid can effectively balance the load demands and DG generation in distribution systems after losing the utility supply. This paper presents different case studies to demonstrate the viability of forming interphase-microgrids for residential distribution systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Coordinated microgrid investment and planning process considering the system operator

Nowadays, a significant number of distribution systems are facing problems to accommodate more photovoltaic (PV) capacity, namely due to the overvoltages during the daylight periods. This has an impact on the private investments in distributed energy resources (DER), since it occurs exactly when the PV prices are becoming attractive, and the opportunity to an energy transition based on solar technologies is being wasted. In particular, this limitation of the networks is a barrier for larger consumers, such as commercial and public buildings, aiming at investing in PV capacity and start operating as microgrids connected to the MV network. To address this challenge, this paper presents a coordinated approach to the microgrid investment and planning problem, where the system operator and the microgrid owner collaborate to improve the voltage control capabilities of the distribution network, increasing the PV potential. The results prove that this collaboration has the benefit of increasing the value of the microgrid investments while improving the quality of service of the system and it should be considered in the future regulatory framework.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Universal Passive Synchronization Method for Grid-Forming Inverters Without Mode Transition

Power systems are transforming with increasing levels of inverter-based resources (IBRs). This transformation requires critical roles of grid-forming (GFM) inverters replacing synchronous generators for bulk power system stabilization and ancillary services, also allowing flexible power system operation, such as microgrid that is operated by multiple GFM IBRs to achieve system resilience against contingencies. To realize the resilient power systems allowing flexible in-and-out operation of GFM IBRs potentially programmed with different primary controls, a synchronization method universally applicable, i.e., independent of control types, would be beneficial to ease the integration process, but it has not been actively studied. To fill the gap, this paper proposes a universal synchronization method that achieves a passive synchronization to enable a smooth transition in a grid with off-nominal system parameters, i.e., voltage and frequency. The logic proposed requires no modification on the primary control, thus applicable to any type of GFMs with a voltage reference input. To validate the concept, a simulation of an IEEE 13-bus benchmark system modified with 3 GFM inverters is presented. It simulates an inverter-driven black start scenario in which GFM inverters autonomously turn on and connect to the grid under heavy loading, using the synchronization logic. The case study demonstrates that GFM inverters can tune their voltage reference to smoothly synchronize without severe transients, and contribute to a seamless black start of the grid under unbalanced load conditions. Two GFM methods - Droop and dispatchable virtual oscillator control - are used for the demo to validate feasibility and interoperability of the passive synchronization.

black start↗

Virtual Oscillator Control Maintains Grid Operations with High Inverter Penetrations

VOC makes each inverter behave electrically like a spring, 'bouncing back' to its normal operating range when disturbed. Coupling these inverters electronically could result in a new way to stabilize power grids. VOC has been demonstrated in a microgrid using several small inverters. In addition, five custom-designed inverters have been built and will be tested with grid simulations at NREL using power hardware-in-the-loop technology. VOC may provide a simple method to keep microgrids stable -- a topic of growing interest as resilience to energy disruptions gains prominence. VOC may also provide a means to transition power grids from today's inertia-dominated systems to systems that do not rely on rotating machinery.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Clean Energy and Microgrid Opportunities to Make Electricity Affordable, Reliable, and Clean in New Orleans

The City of New Orleans, Louisiana, is participating in the U.S. Department of Energy's (DOE) Communities Local Energy Action Program (LEAP) Pilot, which is supporting 24 communities across the United States in their efforts to transition to clean energy to improve energy reliability, lower energy costs, and strengthen local economies. Communities LEAP is specifically open to low-income, energy-burdened communities that are also experiencing either direct environmental justice impacts, or direct economic impacts from a shift away from historical reliance on fossil fuels.

Communities LEAP↗

Microgrid Power Flow Control with Integrated Battery Management Functions

This paper presents a microgrid power flow control for islanded microgrids consisting of photovoltaic (PV) system, battery energy storage system (BESS) and diesel generator. The proposed control ensures automatic coordination among the microgrid units. To achieve the coordination, the local control of PV system and BESS are configured to regulate power flow without relying on communications. The generator is controlled as the back-up source and its connection depends on battery state of charge (SOC). A state machine with hysteresis settings is used to trigger smooth transition among operation modes. Not only does the proposed controller consider battery SOC and power limits, but also integrates three-stage charging control as battery charging mechanism, which is not considered in the existing literature. The proposed control is validated for an islanded hybrid microgrid using an OPAL-RT real-time simulator.

Long, Qian↗

Automated Transit Fleet Electrification Planning in Response to Route Dynamics, Vehicle Utilization, and Local Climate

Transit electrification is difficult, requiring the consideration of many factors including route dynamics, vehicle utilization, and local ambient temperatures. Incumbent planning tools typically rely upon static vehicle efficiency numbers which do not consider local factors specific to each fleet. This paper summarizes a collaboration between NREL and Microgrid Labs, which produced an automated sizing tool capable of producing vehicle battery and motor sizing for drop-in electrification. Furthermore, the workflow also exports the electric-vehicle supply equipment needed to support fleet electrification. The paper summarizes the model theory and includes a sample pilot study performed in support of the Via Mobility transit fleet.

33 ADVANCED PROPULSION SYSTEMS↗

A GENERIC MICROGRID CONTROLLER

The main objective of this project was to develop and test a Generic Microgrid Controller (GMC) that provides (1) seamless islanding and reconnection of the microgrid, (2) efficient, reliable, and resilient operation of the microgrid with the required power quality, whether islanded or grid-connected, (3) existing and future ancillary services to the larger grid, (4) the capability for the microgrid to serve the resiliency needs of participating communities, (5) communication with the electric grid utility as a single controllable entity, and (6) increased reliability, efficiency and reduced emissions. The GMC developed under this project was designed to facilitate the deployment of microgrids, to be easily adapted to various microgrid configurations, and reduce up-front engineering costs associated with the design and development of microgrid controllers. Specifically, the GMC: 1. Provides a control structure amenable to accommodating an array of microgrid configurations and a portfolio of functional requirements; 2. Possesses a high level architecture that can readily be adopted by commercial suppliers; 3. Supports unlimited nesting of conforming microgrid control schemes; 4. Integrates into a full-featured Energy Management System (EMS) as a module. A select set of microgrids, operating a variety of microgrid configurations, served as “collaborating microgrid partners” in the project and assured thereby that the GMC developed under this program can readily be applied to microgrids of different sizes, and equipped with various resources, attributes, and equipment. Collaborating microgrid partners included the UCI Medical Center), the Port of Los Angeles, Port of Long Beach, and the Irvine Ranch Water District. The objectives of the project were achieved in two phases: (Phase I) Research, Development and Design (“Design”), and (Phase II) Testing, Evaluation, and Verification (“TEV”). In Phase I, specifications were developed for the GMC and a detailed test plan was established to test the functional requirements of the GMC. The GMC addresses two core functions, transition and dispatch, as well as several optional higher level functions such as economic dispatch, and renewable and load forecasting.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Demonstrating the data center as a flexible grid asset using a C-HIL setup

Increasing data center demand is outpacing grid infrastructure development. Artificial intelligence workloads and hyperscale cloud growth are creating unprecedented demand for power, while traditional grid expansion faces multiyear development timelines. Verrus is developing an innovative datacenter solution for this challenge, data centers that act as active grid-supportive assets rather than passive loads. Our approach integrates a novel grid-aware power flow management system with battery energy storage systems(BESS) into a microgrid-controlled, medium-voltage power distribution architecture that delivers critical capabilities, such as: * Fast response to grid disturbances such over/ under voltage or over/ under frequency * Demand flexibility that can service requests from the utility within 10 s * Uninterrupted transition to islanded operation during grid outages * Continuous uptime assurance for compute loads while maintaining all customer service level agreements. Through Verrus' strategic partnership with the National Renewable Energy Laboratory (NREL), these capabilities were validated using NREL's Advanced Research on Integrated Energy Systems (ARIES) virtual emulation environment to model a 70-MW grid-interactive data center. This paper outlines the design, methodology, and results of this emulated deployment, demonstrating that data centers can provide both critical load resilience and ancillary grid support without compromising uptime requirements. Specifically, we present a digital real time simulation of a 70 MW data center integrated with a physical microgrid controller, and demonstrate the data center response in the event of a grid voltage and frequency event, utility demand response request and utility outage.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An embedded interfacial network stabilizes inorganic CsPbI3 perovskite thin films

Abstract The black perovskite phase of CsPbI 3 is promising for optoelectronic applications; however, it is unstable under ambient conditions, transforming within minutes into an optically inactive yellow phase, a fact that has so far prevented its widespread adoption. Here we use coarse photolithography to embed a PbI 2 -based interfacial microstructure into otherwise-unstable CsPbI 3 perovskite thin films and devices. Films fitted with a tessellating microgrid are rendered resistant to moisture-triggered decay and exhibit enhanced long-term stability of the black phase (beyond 2.5 years in a dry environment), due to increasing the phase transition energy barrier and limiting the spread of potential yellow phase formation to structurally isolated domains of the grid. This stabilizing effect is readily achieved at the device level, where unencapsulated CsPbI 3 perovskite photodetectors display ambient-stable operation. These findings provide insights into the nature of phase destabilization in emerging CsPbI 3 perovskite devices and demonstrate an effective stabilization procedure which is entirely orthogonal to existing approaches.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

An Innovative Energy Management System for Microgrids with Multiple Grid-Forming Inverters

As increasingly more grid-forming (GFM) inverter-based resources replace traditional fossil-fueled synchronous generators as the GFM sources in microgrids, the existing microgrid energy management systems (EMS) need to be updated to control and coordinate multiple GFM inverters that consider system control objectives under different microgrid connection states.For each state, we formulate an optimization problem and apply a real-time feedback-based control algorithm; altogether, the control algorithms seamlessly connect the states into a generic microgrid EMS that controls the nodal voltages and frequencies, becomes a virtual power plant (VPP) when connected to the main grid, and coordinates power sharing responsibility among GFM sources when islanded. We showcase the EMS on a real-world simulation of a microgrid under the different states to demonstrate its operational effectiveness.

energy management system↗

Distributed Renewables for Arctic Energy: A Case Study

Alaska is a vast state that stretches into the Arctic Circle. Roughly 140,000 people in the state are dependent on isolated electric grids, traditionally burning expensive fossil fuels. This has negative impacts on air quality and climate. As the climate warms, fuel supply chains and traditional ways of life are threatened. Renewable electric sources offer a clean, resilient alternative with less volatile costs, but there are a variety of technical, social, economic, and political challenges to developing renewable energy systems in remote Arctic communities. Examples include harsh operating conditions, lack of local technical and managerial capacity, complex funding mechanisms, and glacial permitting processes. In this study, we interview one group of communities that are interested in adding renewable energy to their systems to understand the needs and challenges they face, and then another group that has successfully installed renewable energy, to understand how they overcame such challenges and the lessons they learned. Notable results include the importance of local buy-in, education, and technical involvement, procuring external funding sources, inter-community collaboration, installing bespoke systems, and working with reliable equipment suppliers. The goal of this report is to orient and inspire Arctic communities that want to begin their renewable transition, by providing helpful examples and points of contact.

17 WIND ENERGY↗

Agua Caliente Wind/Solar Project at Whitewater Ranch

Agua Caliente Band of Cahuilla Indians (ACBCI) was awarded a grant by the Department of Energy (DOE) to study the feasibility of a wind and/or solar renewable energy project at the Whitewater Ranch (WWR) property of ACBCI. Red Mountain Energy Partners (RMEP) was engaged to conduct the study. The ACBCI tribal lands in the Coachella Valley have very rich renewable energy resources. The tribe has undertaken several studies to more fully understand the options available to them if they were to move forward with one or more renewable energy projects. With respect to the resources, the WWR property clearly has excellent wind and solar resources. The DOE National Renewable Energy Laboratory (NREL) has continued to upgrade and refine their library of resource maps. The newer, more precise maps quantify the resources as among the best in the world. The wind and solar technology available for deployment is also being improved. Both are reducing their costs to the point of being at or below the costs of fossil fuels. Technologies for energy storage and microgrids are also improving quickly and present additional ways to increase the wind and/or solar energy retained for later use with the network management flexibility to provide power to the appropriate locations when needed. As a result, renewable resources continue to gain more market share. The transitioning to renewables as the major resources for power will take some time as the conversion is complex and can have negative impacts if not managed well. While the economics for wind and solar systems continue to improve, the robustness of the WWR site was validated by the repeated queries of developers to place wind and/or solar there. The robust resources and improving technologies portends toward WWR land as a renewable energy site. The business case, however, is not so clear, especially when the potential investment portfolio for ACBCI has several very beneficial and profitable alternatives.

17 WIND ENERGY↗

Load Control for Frequency Response - A Literature Review

As electricity grids employ greater fractions of renewable energy, which introduce additional variability and uncertainty in the net load, balancing electrical load and generation becomes more challenging. This paper reviews the literature documenting physical simulations and real systems that employ load control (LC) for frequency response and other grid services, which balance net load on the grid and prevent unwanted frequency excursions. Apart from academic and simulation studies, few sources exist on large-scale laboratory hardware testing or actual real-world systems that employ LC for frequency response, and we review them here. Four types of systems that we consider are: 1) Laboratory-based LC experiments, 2) Isolated microgrids that employ LC, 3) Larger grids that employ LC and 4) vehicle-to-grid (V2G) technology, using electric vehicles (EVs). In general, these systems have successfully used LC to meet their objectives, which are often keeping grid frequency within a required band. However, LC struggled to balance grid frequency in an isolated system powered by a single wind turbine, and V2G technology requires refinement in communication and control to provide optimal regulation that adheres to industry standards. As LC grows in the energy industry, we have three main recommendations: 1) encouraging system operators who use LC to publish system characteristics and lessons learned; 2) transitioning more LC theoretical/simulated systems to physical experiments, and physical experiments to real-world pilot systems; 3) demonstrating load control to support isolated, high-wind-contribution systems.

17 WIND ENERGY↗

Existing Methods for Grid Strength Assessment and Role of Hydropower in Future Grids

The power system is undergoing rapid evolution with increasing penetration of inverter-based resources (IBRs), large loads, microgrids, and power electronic devices. Ensuring reliable and stable operation of the modern power grid is a multi-faceted challenge that requires detailed understanding of this complex system. Dynamic stability is a major concern in maintaining the security of power grids as the generation mixes and large loads transitions to include high shares of power electronic devices. The operation of IBRs in regions with low system strength and higher grid impedances has been found to be the main reason behind many of the power system instabilities that manifest themselves in various types of oscillations and interactions that, if not properly addressed and damped, can jeopardize the reliable operation of the power system. Weak grid conditions compound such stability problems, particularly when many IBRs operate in proximity to and connect to weak power grids. Therefore, it is important to assess grid strength for planning, integration and operation of IBRs for a given power system. In this report, we aim to understand and classify existing methodologies for grid strength assessment, along with their limitations and future needs. Further, we aim to utilize the huge untapped potential in utilizing hydro energy resources in addressing some of the pertinent challenges of grid strength and reliable operation of modern power systems. Hydropower, historically valued for its flexibility and dispatchability, now faces new constraints due to reduced share of synchronous machines in the generation mix and seasonal variability of available water resources. Yet, these same plants present untapped potential beyond energy generation - notably, as providers of critical grid services. This report explores how hydropower plants, particularly through operation as synchronous condensers, can play a pivotal role in strengthening the grid amid evolving system dynamics.

13 HYDRO ENERGY↗

Black Start with Inverter-Based Resources: Hardware Testing

Black start, or grid restoration after a wide-spread power outage, is a critical service on the power system that has historically been provided by transmission-connected synchronous generators. As the power system transitions to rely on more distributed and inverter-based resources it will be critical that these resources can also provide black start services. In this work we investigated battery energy storage and solar photovoltaics technical capabilities and limitations to provide black start services through hardware testing in an experimental microgrid testbed. This hardware demonstration of inverter-based resources providing black start functions can help inform grid operators on how to include these types of resources in their black start plans.

24 POWER TRANSMISSION AND DISTRIBUTION↗