Search NASASearch

SEARCH · Search NASA

Results for “National Reactor Innovation Center”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

889 records · Page 50

Wyoming Trails Carbon Hub (WyoTCH)

The Wyoming Trails Carbon Hub (WyoTCH) project completed a front-end engineering and design (FEED) study for a commercial-scale, open-access carbon dioxide (CO 2 ) transport pipeline in Wyoming under U.S. Department of Energy (DOE) Award DEFE0032347, funded through the Bipartisan Infrastructure Law Carbon Capture Technology Program and administered by the National Energy Technology Laboratory. The project’s approach of designing a multi-source, multi-destination pipeline, rather than a dedicated line serving a single project, would lower the barrier to entry for individual CO 2 projects. The projects would leverage Wyoming's concentrated industrial and power generation CO 2 sources, its existing CO 2 pipeline infrastructure, and its extensive CO 2 storage and utilization capacity. This is the project's final technical report.

01 COAL, LIGNITE, AND PEAT

Scaling Demand Flexibility: Building on 30 Years of Energy Efficiency Success

With electricity consumption across the United States (US) and Canada anticipated to grow, energy efficiency program administrators have a key role to play in helping to ensure energy affordability and reliability in support of the broader economic systems utilities and grid support. Connected, demand side load balancing solutions, such as load shifting heating, ventilation and air conditioning (HVAC) systems and managed charging for electric vehicles (EVs), can dynamically manage energy, allowing for more volumetric electricity consumption without incurring the expense of upgraded transmission and distribution capabilities. When combined, or aggregated, many small loads can be managed to have meaningful impact on energy demand on the grid. Utilities and their partners have an opportunity to leverage decades of experience and the infrastructure needed to assess, design, implement, and measure programs to scale up the adoption of equipment with built-in load flexibility capabilities. Current efforts among a wide variety of electricity system service providers, utilities, standards agencies, regulators, national labs and private industry stakeholders aim to identify common standards, metrics, and methodologies for valuing grid services offered by demand side equipment. By combining those efforts with decades of proven energy efficiency resources, utilities are poised to effectuate a scaling up of equipment with energy management capabilities installed in homes and businesses across the US and Canada. This paper will provide an overview of how utilities are approaching this era of load growth and new peak demands across the United States and Canada. It will highlight the specific strategies that program administrators are employing to advance market transformation for grid-enabled products and devices that have the greatest potential to reduce energy use and increase load flexibility.

Grant, Peter

Crystal Growth Scale-Up and Stability of RbSr 2 X 5 :Eu Scintillators

The discovery and development of new scintillation materials support national security needs. In these applications, large volumes of scintillator crystals are needed to achieve efficient screening for contraband. Therefore, one important step in the discovery of new scintillator compositions is testing their feasibility for scale-up and their stability. In this work, high-quality Ø22 mm crystals of two new scintillators RbSr 2 Br 5 :Eu and RbSr 2 I 5 :Eu were grown via the Vertical Bridgman method, and their scintillation properties were characterized. Here, the Ø22 mm RbSr 2 I 5 :Eu crystals could be grown with fast translation rates up to 3.5 mm/h. Both RbSr 2 Br 5 :Eu and RbSr 2 I 5 :Eu had high scintillation performance, including light yields of 46,000 and 61,000 ph/MeV, respectively, for Ø22 × 35 mm crystals. Additionally, properties related to physical stability were investigated, including the coefficients of thermal expansion via high-temperature X-ray diffraction (HTXRD) as well as moisture sensitivity. HTXRD confirmed the absence of solid–solid phase transitions and showed that RbSr 2 Br 5 had minimal thermal expansion anisotropy compared to RbSr 2 I 5 and some other inorganic metal halide scintillators, which favors the growth of large-sized crystals.

36 MATERIALS SCIENCE

Draft ASME Code Case to qualify L-PBF 316H material for Section III, Division 5 applications

This report documents the AMMT program’s development and submission of a draft ASME Code Case to qualify Laser Powder Bed Fusion (L PBF) Type 316H stainless steel for Section III, Divi-sion 5 Class A and SM high temperature nuclear applications. It summarizes the technical basis, the comprehensive high temperature mechanical test database assembled between 2023–2026, and the proposed code language and qualification framework submitted to ASME. The work was co-ordinated across multiple national laboratories and leverages prior ASME efforts to integrate additive manufacturing into the Boiler & Pressure Vessel Code. The body of the report describes the experimental database and analysis supporting the Code Case: tensile, creep, fatigue, creep fatigue, and thermal aging tests collected from multiple additive manufacturing sites, machine types, and powder lots, with material processed by a solution anneal heat treatment. The dataset — including both full size and subsized specimens and tests oriented parallel and perpendicular to build direction — shows limited tensile anisotropy, tensile properties comparable to wrought 316H, creep strength within the scatter of wrought material, but markedly reduced creep ductility above about 650 °C associated with rapid σ phase formation in L PBF microstructures. The draft Code Case itself prescribes a staged qualification model (manufacturing process qualification, component qualification, and per build witness testing), treats L PBF components as equivalent to Type 316 weld metal for design and inspection, and requires mechanical, chemical, and metallographic controls tied to ASTM/ISO 52946. Key acceptance criteria include tensile tests within a 90% prediction interval of the AMMT dataset, a creep fatigue screening test adapted from ASME Section III, Division 5, Subsection HB, HBB 2800 but with the cycle acceptance reduced to 100 for L PBF material, and double volumetric inspection of production components. The report concludes that the present data support treating L PBF 316H as analogous to conventional fusion weld metal for Division 5 design and inspection, while highlighting important caveats: the σ phase driven loss of creep ductility above ~650 °C, preliminary indications of enhanced creep fatigue sensitivity in some lots, and remaining gaps in long term aging and additional cyclic testing. Recommended next actions include completing outstanding cyclic and long duration creep/aging tests on the solution annealed condition, supporting inclusion of the 316H chemistry and heat treatment in ASTM/ISO 52946, and continuing engagement with ASME and NRC during balloting and review to enable industry adoption.

Messner, Mark C. (ORCID:0000000200404385)

Purpose, Design, and Analysis of the NSTX-U Centerstack Casing Lateral Support Shims

The National Spherical Torus Experiment Upgrade (NSTX-U) centerstack casing surrounds the central magnet core of NSTXU. It provides the inner vacuum boundary of the plasma chamber and supports the radially inboard plasma facing components lining the plasma chamber. The casing is supported like a cantilever, fixed at the lower flange by a connection to the TF Bundle through a G-10 ring. It is flexibly supported at the top by bellows, and insulated shims intended to react the largest part of the inventory of the disruption loads at the upper support, thereby protecting the upper and lower connections from excessive loads. A large part of the qualification of the casing and tiles requires addressing and quantifying disruption loads. These have been estimated based on extensions of the behavior of NSTX during its run period roughly 15 years ago. Structural qualification of the Upgrade used these estimates of the loading as input to calculations to demonstrate adequacy for a “most probable” disruption. The estimates are included in a requirements document to guide conservative design of all components loaded by disruptions. However, the changes made for the upgrade made the extrapolation of disruption behavior uncertain. Disruptions include axisymmetric loading from axisymmetric currents induced in the vessel shells. In addition, more complex currents called Halo currents are a result of plasma poloidal currents impinging on the casing. The halo currents add another layer of uncertain behavior and net lateral loading to the casing. As a result, NSTX-U is equipped with a number of instruments intended to assess the nature and severity of disruptions. The casing shims are required for lateral support of the casing, but these have also been converted to load cells to provide another measure of the magnitude of symmetric and asymmetric loading. Some of the logic in the development of the requirements document are presented. Electromagnetic analysis of axisymmetric and halo loading is described. Global simulations of the casing transient dynamic response, and local analysis and testing of the shim/load cell are included. The shim load cells and other instrumentation will be an important guide in planning NSTX-U experiments beyond its next run period expected in late 2026 or early 2027.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY

Dielectric Spectroscopy Cable NDE for Unequal Aging Over Different Lengths

This Pacific Northwest National Laboratory milestone report assesses the effect of unequal aging over different lengths of cable on dielectric spectroscopy (DS) bulk impedance measurements from the cable end. DS measurements can indicate the remaining useful life of cables; however, most benchmark tests are based on accelerated aging of the entire cable. If only a portion of the cable is exposed to a harsh environment (as is frequently the case), the DS measurement will indicate a significantly less-aged cable than if the entire cable were exposed to a uniform environmental stress. The DS measurement is primarily related to the intrinsic insulation material relative permittivity—typically between 1.5 and 3.0. Insulation aging increases permittivity and, correspondingly, the cable’s overall capacitance measured from the cable end. To judge the health of the overall cable system, operators are primarily interested in the condition of the most severely aged section since that is where a failure is most likely to occur. This can be expressed as the dimensionless relative permittivity of the severely aged section divided by the permittivity of a pristine cable. This relative permittivity is an intrinsic material parameter independent of cable length and can serve as a quantitative indication of the insulation condition. If the relative percentages of cable exposed to a harsh and benign environment are known, the DS measurement of the entire cable length, including both pristine and aged sections, can be compensated to predict the relative permittivity (relative to pristine permittivity) of the most severly aged segment. A test was performed on three 50 ft (16 m) cables with 10%, 50%, and 90% of the cable inside a thermal aging oven. Predictably, the aging effect on the DS response was greatest in the 90% sample, followed by the 50% sample, and then the 10% sample. The more interesting result is the ratio of the aged insulation permittivity to the pristine insulation permittivity. Based on prior work, an end-of-life cable has a value of approximately 1.35. If the relative percentages of pristine and severely aged cable lengths are known, and the total cable-length capacitance of the initial pristine cable and the combined pristine plus aged cable are known, the relative aged permittivity (ratio of aged section permittivity / pristine section permittivity) can be estimated. The relative cable lengths exposed to a harsh environment may be known or estimated based on plant layout drawings or cable reflectometry tests that can locate the oven entry and exit points. The compensation was verified using a lumped-parameter model to predict the aged-segment permittivity e2/e1, where e2 is the aged-segment permittivity and e1 is the pristine-segment permittivity. For all three percentages of aged cable lengths, the ratio was quite similar, as would be expected since all cable segments were exposed to the same aging environment. This ratio of aged permittivity to pristine permittivity can be compared to other damage indicating tests, including elongation at break, to assess cable condition.

ARENA Test Bed

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI