Search NASA⌕ Search

SEARCH · Search NASA

Results for “RELIABLE OPERATION PERFORMANCE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 973 records · Page 54

A Framework for Assessing the Reusability of Hardware (Reusable Rocket Engines)

Within the space flight community, reusability has taken center stage as the new buzzword. In order for reusable hardware to be competitive with its expendable counterpart, two major elements must be closely scrutinized. First, recovery and refurbishment costs must be lower than the development and acquisition costs. Additionally, the reliability for reused hardware must remain the same (or nearly the same) as "first use" hardware. Therefore, it is imperative that a systematic approach be established to enhance the development of reusable systems. However, before the decision can be made on whether it is more beneficial to reuse hardware or to replace it, the parameters that are needed to deem hardware worthy of reuse must be identified. For reusable hardware to be successful, the factors that must be considered are reliability (integrity, life, number of uses), operability (maintenance, accessibility), and cost (procurement, retrieval, refurbishment). These three factors are essential to the successful implementation of reusability while enabling the ability to meet performance goals. Past and present strategies and attempts at reuse within the space industry will be examined to identify important attributes of reusability that can be used to evaluate hardware when contemplating reusable versus expendable options. This paper will examine why reuse must be stated as an initial requirement rather than included as an afterthought in the final design. Late in the process, changes in the overall objective/purpose of components typically have adverse effects that potentially negate the benefits. A methodology for assessing the viability of reusing hardware will be presented by using the Space Shuttle Main Engine (SSME) to validate the approach. Because reliability, operability, and costs are key drivers in making this critical decision, they will be used to assess requirements for reuse as applied to components of the SSME.

Childress-Thompson, Rhonda↗

A Framework for Assessing the Reusability of Hardware (Reusable Rocket Engines)

Within the space flight community, reusability has taken center stage as the new buzzword. In order for reusable hardware to be competitive with its expendable counterpart, two major elements must be closely scrutinized. First, recovery and refurbishment costs must be lower than the development and acquisition costs. Additionally, the reliability for reused hardware must remain the same (or nearly the same) as "first use" hardware. Therefore, it is imperative that a systematic approach be established to enhance the development of reusable systems. However, before the decision can be made on whether it is more beneficial to reuse hardware or to replace it, the parameters that are needed to deem hardware worthy of reuse must be identified. For reusable hardware to be successful, the factors that must be considered are reliability (integrity, life, number of uses), operability (maintenance, accessibility), and cost (procurement, retrieval, refurbishment). These three factors are essential to the successful implementation of reusability while enabling the ability to meet performance goals. Past and present strategies and attempts at reuse within the space industry will be examined to identify important attributes of reusability that can be used to evaluate hardware when contemplating reusable versus expendable options. This paper will examine why reuse must be stated as an initial requirement rather than included as an afterthought in the final design. Late in the process, changes in the overall objective/purpose of components typically have adverse effects that potentially negate the benefits. A methodology for assessing the viability of reusing hardware will be presented by using the Space Shuttle Main Engine (SSME) to validate the approach. Because reliability, operability, and costs are key drivers in making this critical decision, they will be used to assess requirements for reuse as applied to components of the SSME.

Childress-Thompson, Rhonda↗

Deployment of Performance Management Methodology as part of Liquid Waste Program at Savannah River Site - 12178

In 2009, Savannah River Remediation LLC (SRR) assumed the management lead of the Liquid Waste (LW) Program at the Savannah River Site (SRS). The four SRR partners and AREVA, as an integrated subcontractor are performing the ongoing effort to safely and reliably: - Close High Level Waste (HLW) storage tanks; - Maximize waste throughput at the Defense Waste Processing Facility (DWPF); - Process salt waste into stable final waste form; - Manage the HLW liquid waste material stored at SRS. As part of these initiatives, SRR and AREVA deployed a performance management methodology based on Overall Equipment Effectiveness (OEE) at the DWPF in order to support the required production increase. This project took advantage of lessons learned by AREVA through the deployment of Total Productive Maintenance and Visual Management methodologies at the La Hague reprocessing facility in France. The project also took advantage of measurement data collected from different steps of the DWPF process by the SRR team (Melter Engineering, Chemical Process Engineering, Laboratory Operations, Plant Operations). Today the SRR team has a standard method for measuring processing time throughout the facility, a reliable source of objective data for use in decision-making at all levels, and a better balance between engineering department goals and operational goals. Preliminary results show that the deployment of this performance management methodology to the LW program at SRS has already significantly contributed to the DWPF throughput increases and is being deployed in the Saltstone facility. As part of the liquid waste program on Savannah River Site, SRR committed to enhance production throughput of DWPF. Beyond technical modifications implemented at different location of the facility, SRR deployed performance management methodology based on OEE metrics. The implementation benefited from the experience gained by AREVA in its own facilities in France. OEE proved to be a valuable tool in order to support the enhancement program in DWPF by providing unified metrics to measure plant performances, identify bottleneck location, and rank the most time consuming causes from objective data shared between the different groups belonging to the organization. Beyond OEE, the Visual Management tool adapted from the one used at La Hague were also provided in order to further enhance communication within the operating teams. As a result of all the initiatives implemented on DWPF, achieved production has been increased to record rates from FY10 to FY11. It is expected that thanks to the performance management tools now available within DWPF, these results will be sustained and even improved in the future to meet system plan targets. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sensor Selection and Optimization for Health Assessment of Aerospace Systems

Aerospace systems are developed similarly to other large-scale systems through a series of reviews, where designs are modified as system requirements are refined. For space-based systems few are built and placed into service. These research vehicles have limited historical experience to draw from and formidable reliability and safety requirements, due to the remote and severe environment of space. Aeronautical systems have similar reliability and safety requirements, and while these systems may have historical information to access, commercial and military systems require longevity under a range of operational conditions and applied loads. Historically, the design of aerospace systems, particularly the selection of sensors, is based on the requirements for control and performance rather than on health assessment needs. Furthermore, the safety and reliability requirements are met through sensor suite augmentation in an ad hoc, heuristic manner, rather than any systematic approach. A review of the current sensor selection practice within and outside of the aerospace community was conducted and a sensor selection architecture is proposed that will provide a justifiable, dependable sensor suite to address system health assessment requirements.

Maul, William A.↗

Sensor Selection and Optimization for Health Assessment of Aerospace Systems

Aerospace systems are developed similarly to other large-scale systems through a series of reviews, where designs are modified as system requirements are refined. For space-based systems few are built and placed into service these research vehicles have limited historical experience to draw from and formidable reliability and safety requirements, due to the remote and severe environment of space. Aeronautical systems have similar reliability and safety requirements, and while these systems may have historical information to access, commercial and military systems require longevity under a range of operational conditions and applied loads. Historically, the design of aerospace systems, particularly the selection of sensors, is based on the requirements for control and performance rather than on health assessment needs. Furthermore, the safety and reliability requirements are met through sensor suite augmentation in an ad hoc, heuristic manner, rather than any systematic approach. A review of the current sensor selection practice within and outside of the aerospace community was conducted and a sensor selection architecture is proposed that will provide a justifiable, defendable sensor suite to address system health assessment requirements.

Maul, William A.↗

Nonlinear dynamic simulation of single- and multi-spool core engines

In this paper a new computational method for accurate simulation of the nonlinear dynamic behavior of single- and multi-spool core engines, turbofan engines, and power generation gas turbine engines is presented. In order to perform the simulation, a modularly structured computer code has been developed which includes individual mathematical modules representing various engine components. The generic structure of the code enables the dynamic simulation of arbitrary engine configurations ranging from single-spool thrust generation to multi-spool thrust/power generation engines under adverse dynamic operating conditions. For precise simulation of turbine and compressor components, row-by-row calculation procedures were implemented that account for the specific turbine and compressor cascade and blade geometry and characteristics. The dynamic behavior of the subject engine is calculated by solving a number of systems of partial differential equations, which describe the unsteady behavior of the individual components. In order to ensure the capability, accuracy, robustness, and reliability of the code, comprehensive critical performance assessment and validation tests were performed. As representatives, three different transient cases with single- and multi-spool thrust and power generation engines were simulated. The transient cases range from operating with a prescribed fuel schedule, to extreme load changes, to generator and turbine shut down.

Schobeiri, T.↗

Digital risk analysis in nuclear engineering projects: Designing for safety, performance, reliability, and security

Cyber-informed engineering and security-by-design frameworks are important in promoting the need to identify cybersecurity concerns early in the systems engineering lifecycle so risks from adversarial cyber-attacks can be eliminated or reduced through engineering design practices. In addition to adversarial risk, risk in operational technology systems also includes non-adversarial and unintentional risk from other factors such as human performance errors, environmental conditions, design flaws, and device degradation or failure. This paper introduces a new concept for characterizing digital risk, both adversarial and non-adversarial, and provides the basis for initial research into a novel digital risk analysis approach focused on incorporating attack difficulty into a multi-attribute analysis technique using robust decision-making. This digital risk characterization is also used to frame a discussion on the challenges of competing objectives and competing stakeholder requirements in an integrated energy system project that incorporates a small modular reactor and industrial facility.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Extending Component Lifetime And Improving Inverter Reliability (ECLAIIR)

Inverter reliability remains one of the most persistent challenges limiting the performance, availability, and economic viability of utility‑scale photovoltaic (PV) plants. Industry data consistently show that inverters account for the highest share of corrective maintenance events and unplanned outages across PV fleets. These failures result in energy losses, increased O&M costs, and reduced confidence in long‑term solar asset performance. Motivated by these challenges, this project—Extending Component Lifetime and Improving Inverter Reliability (ECLAIIR)—was undertaken to systematically investigate inverter degradation and failure mechanisms, develop predictive maintenance capabilities, and establish data‑driven pathways to improve service life and reduce the Levelized Cost of Energy (LCOE) for large‑scale PV systems. The primary goal of the project was to identify pre‑failure signatures in string inverters using both lab‑based accelerated lifetime testing and field‑based data and to develop predictive maintenance algorithms that can anticipate inverter faults before they occur. Through collaboration with inverter testing laboratory, solar PV plant owner, and failure‑analysis experts, the project advanced the technical understanding of inverter reliability. By instrumenting inverters with thermistors, humidity sensors, power‑quality meters, and acoustic sensors, the research established how multiple sensing modalities can reliably detect deviations from normal behavior hours to days before failure. These findings substantially enhance scientific understanding of inverter failure kinetics and provide the PV industry with the most comprehensive cross‑OEM characterization of early‑stage failure indicators reported to date. Technically, the project demonstrated the effectiveness of predictive maintenance by developing and validating the PreDICT (Predictive Diagnostics of PV Inverters Using Condition Monitoring and Trend Analysis) framework—a multi‑layer diagnostic architecture combining peer‑to‑peer analytics, historical trend modeling, and advanced machine‑learning techniques such as the Sequential Conditional Variational Autoencoder (SCVAE). This predictive model achieved more than 90% accuracy in detecting pre‑failure conditions and provided up to four days of lead time before inverter failure in field scenarios. Economically, the project’s LCOE analysis showed that predictive maintenance can reduce lifetime energy losses and minimize corrective maintenance interventions. Modeling indicated that, depending on inverter failure rates and replacement timelines, predictive maintenance can significantly reduce LCOE impacts associated with inverter downtime: from as high as 19.4% under conventional maintenance strategies to 0.1%–10.17% when predictive analytics are adopted. These results confirm that predictive maintenance is both technically feasible and economically advantageous for utilities and plant operators. The project’s findings also have broad public benefit. By improving inverter reliability and reducing downtime, predictive maintenance directly increases electricity generation from existing PV assets. Enhanced reliability lowers operational costs for utilities, which can translate over time into lower energy costs for consumers. Furthermore, the project’s technical publications, conference presentations, and industry workshops ensure that knowledge gained is shared broadly across the solar industry, supporting workforce development and enabling utilities of all sizes to adopt modern asset‑health monitoring practices. The retrofitting case study and service‑life prediction framework further support informed decision‑making for aging PV fleets, helping operators extend system life and reduce electronic waste. In summary, the ECLAIIR project significantly advanced the state of knowledge on inverter degradation, demonstrated the technical and economic value of predictive maintenance, and delivered actionable tools and insights that support more reliable, cost‑effective, and sustainable PV plant operation. The outcomes of this project will continue to inform utility practices, guide inverter design improvements, and strengthen the long‑term performance of solar assets nationwide.

14 SOLAR ENERGY↗

Shuttle Propulsion System Major Events and the Final 22 Flights

Numerous lessons have been documented from the Space Shuttle Propulsion elements. Major events include loss of the Solid Rocket Boosters (SRB's) on STS-4 and shutdown of a Space Shuttle Main Engine (SSME) during ascent on STS-51F. On STS-112 only half the pyrotechnics fired during release of the vehicle from the launch pad, a testament for redundancy. STS-91 exhibited freezing of a main combustion chamber pressure measurement and on STS-93 nozzle tube ruptures necessitated a low liquid level oxygen cut off of the main engines. A number of on pad aborts were experienced during the early program resulting in delays. And the two accidents, STS-51L and STS-107, had unique heritage in history from early program decisions and vehicle configuration. Following STS-51L significant resources were invested in developing fundamental physical understanding of solid rocket motor environments and material system behavior. And following STS-107, the risk of ascent debris was better characterized and controlled. Situational awareness during all mission phases improved, and the management team instituted effective risk assessment practices. The last 22 flights of the Space Shuttle, following the Columbia accident, were characterized by remarkable improvement in safety and reliability. Numerous problems were solved in addition to reduction of the ascent debris hazard. The Shuttle system, though not as operable as envisioned in the 1970's, successfully assembled the International Space Station (ISS). By the end of the program, the remarkable Space Shuttle Propulsion system achieved very high performance, was largely reusable, exhibited high reliability, and was a heavy lift earth to orbit propulsion system. During the program a number of project management and engineering processes were implemented and improved. Technical performance, schedule accountability, cost control, and risk management were effectively managed and implemented. Award fee contracting was implemented to provide performance incentives. The Certification of Flight Readiness and Mission Management processes became very effective. A key to the success of the propulsion element projects was related to relationships between the MSFC project office and support organizations with their counterpart contractor organizations. The teams worked diligently to understand and satisfy requirements and achieve mission success.

Owen, James W.↗

Operation of helium sub-atmospheric multistage cryogenic centrifugal compressor trains: Part 2 – Transient modeling and pump-down path selection

Low-pressure conditions required for operation of helium cryogenic systems below the normal boiling point (i.e. 4.2 K) are established through a transient process, commonly referred to as ‘pump-down’. This process is defined as the transition from pressures above atmospheric conditions to the saturation pressure which corresponds to a specified operational temperature. The FRIB 2 K system consists of five cryogenic centrifugal compressors which are operated in series. Historically, the pump-down process path has been established through empirical methods and system operator experience. Investigation into the pump-down process at FRIB aimed to develop a pump-down methodology which relies on theoretical model predictions rather than empirically developed process paths. Ensuring stable operation during the pump-down process involved application of a centrifugal compressor performance prediction model, which is described in Part 1 of this paper. Compressor performance maps can be directly used to evaluate the stability of a selected pump-down path and anticipate the overall reliability of the selected path. In conjunction with the compressor performance maps, a system pressure model was developed to estimate the transient pressure response during the pump-down process. Lastly, an explicit equation was developed to establish a mass flow rate profile for the pump-down process. Implementation of the presented methodology (including the developed models) allows for the system operator to determine a continuous pump-down path which maintains compressor stability while conforming to overall system capabilities. Altogether, the methodology presented has resulted in simplification of transient pump-down operations and increased the reliability, stability and efficiency of the pump-down process.

Compressor train control↗

GRIZZLY Model of Multi-Reactive Species Diffusion, Moisture/Heat Transfer and Alkali-Silica Reaction for Simulating Concrete Aging and Degradation

Concrete is widely used in the construction of nuclear facilities because of its structural strength and its ability to shield radiation. The use of concrete in nuclear power plants for containment and shielding of radiation and radioactive materials has made its performance crucial for the safe operation of the facility. As such, when life extension is considered for nuclear power plants, it is critical to have accurate and reliable predictive tools to address concerns related to various aging processes of concrete structures and the capacity of structures subjected to age-related degradation. The goal of this report is to document the progress of the development and implementation of a fully coupled thermo-hydro-mechanical-chemical model in GRIZZLY code with the ultimate goal to reliably simulate and predict long-term performance and response of aged NPP concrete structures subjected to a number of aging mechanisms including external chemical attacks and volume-changing chemical reactions within concrete structures induced by alkali-silica reactions and long-term exposure to irradiation. Based on a number of survey reports of concrete aging mechanisms relevant to nuclear power plants and recommendations from researchers in concrete community, we’ve implemented three modules during FY15 in GRIZZLY code, (1) multi-species reactive diffusion model within cement materials; (2) coupled moisture and heat transfer model in concrete; and (3) anisotropic, stress-dependent, alkali-silica reaction induced swelling model. The multi-species reactive diffusion model was implemented with the objective to model aging of concrete structures subjected to aggressive external chemical attacks (e.g., chloride attack, sulfate attack, etc.). It considers multiple processes relevant to external chemical attacks such as diffusion of ions in aqueous phase within pore spaces, equilibrium chemical speciation reactions and kinetic mineral dissolution/precipitation. The moisture/heat transfer module was implemented to simulate long-term spatial and temporal evolutions of the moisture and temperature fields within concrete structures at both room and elevated temperatures. The ASR swelling model implemented in GRIZZLY code can simulate anisotropic expansions of ASR gel under either uniaxial, biaxial and triaxial stress states, and can be run simultaneously with the moisture/heat transfer model and coupled with various elastic/inelastic solid mechanics models that were implemented in GRIZZLY code previously. This report provides detailed descriptions of the governing equations, constitutive equations and numerical algorithms of the three modules implemented in GRIZZLY during FY15, simulation results of example problems and model validation results by comparing simulations with available experimental data reported in the literature. The close match between the experiments and simulations clearly demonstrate the potential of GRIZZLY code for reliable evaluation and prediction of long-term performance and response of aged concrete structures in nuclear power plants.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Reliability and Maintainability Data for Liquid Metal Cooling Systems

One of the coolants of interest for future fusion breeding blankets is lead-lithium. As a liquid metal it offers the advantages of high temperature operation for good station efficiency, low pressure, and moderate flow rate. This coolant is also under examination for use in test blanket modules to be used in the ITER international project. To perform reliability, availability, maintainability and inspectability (RAMI) assessment as well as probabilistic safety assessment (PSA) of lead-lithium cooling systems, component failure rate data are needed to quantify the system models. RAMI assessment also requires repair time data and inspection time data. This paper presents a new survey of the data sets that are available at present to support RAMI and PSA quantification. Recommendations are given for the best data values to use when quantifying system models.

maintainability data↗

Laboratory testing methods to evaluate the reliability of occupancy sensors for commercial building applications

The energy performance of commercial buildings is greatly influenced by occupants which are highly variable and among the most unpredictable components of a building's operation. While most building control systems use fixed, predetermined occupancy schedules, these fixed occupancy levels can be quite different from actual occupancy. This can cause unnecessary energy consumption, particularly from heating, ventilation, and air conditioning (HVAC) and lighting systems which are responsible for approximately 60% of commercial buildings' energy use. The use of occupancy counting sensor systems integrated with building management system controls is one method that can be used to improve the energy-consuming performance of buildings. However, there is no standardized universal methodology and metrics to evaluate their reliability. The aim of this research is to develop a uniform evaluation methodology to assess the reliability of occupancy counting sensor systems in a controlled laboratory environment. The developed testing methodology includes both “typical” scenarios representing the occupancy scenarios of a typical commercial building, and “failure” testing scenarios which represent a range of potential scenarios that may impact a sensor system's reliability. These methods were then implemented in a case study to evaluate the performance of two novel occupancy counting sensor systems (i.e., door-centric, and camera-based). Results suggest that typical testing results can be used to compare the overall performance of the occupancy counting sensor systems; however, failure testing is also important to understand the weaknesses of the sensor system in order to select the suitable one for the intended use of the commercial building. In addition, the proposed methodology includes a modified confusion matrix which enables the ability to identify if failures are caused by over or under counting occupants and to what extent this occurs over the testing period.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Sub-Second Parallel State Estimation

This report describes the performance of Pacific Northwest National Laboratory (PNNL) sub-second parallel state estimation (PSE) tool using the utility data from the Bonneville Power Administrative (BPA) and discusses the benefits of the fast computational speed for power system applications. The test data were provided by BPA. They are two-days’ worth of hourly snapshots that include power system data and measurement sets in a commercial tool format. These data are extracted out from the commercial tool box and fed into the PSE tool. With the help of advanced solvers, the PSE tool is able to solve each BPA hourly state estimation problem within one second, which is more than 10 times faster than today’s commercial tool. This improved computational performance can help increase the reliability value of state estimation in many aspects: (1) the shorter the time required for execution of state estimation, the more time remains for operators to take appropriate actions, and/or to apply automatic or manual corrective control actions. This increases the chances of arresting or mitigating the impact of cascading failures; (2) the SE can be executed multiple times within time allowance. Therefore, the robustness of SE can be enhanced by repeating the execution of the SE with adaptive adjustments, including removing bad data and/or adjusting different initial conditions to compute a better estimate within the same time as a traditional state estimator’s single estimate. There are other benefits with the sub-second SE, such as that the PSE results can potentially be used in local and/or wide-area automatic corrective control actions that are currently dependent on raw measurements to minimize the impact of bad measurements, and provides opportunities to enhance the power grid reliability and efficiency. PSE also can enable other advanced tools that rely on SE outputs and could be used to further improve operators’ actions and automated controls to mitigate effects of severe events on the grid. The power grid continues to grow and the number of measurements is increasing at an accelerated rate due to the variety of smart grid devices being introduced. A parallel state estimation implementation will have better performance than traditional, sequential state estimation by utilizing the power of high performance computing (HPC). This increased performance positions parallel state estimators as valuable tools for operating the increasingly more complex power grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Tehachapi Wind Energy Storage Project - Technology Performance Report #3

The TSP is located at SCE’s Monolith Substation in Tehachapi, California. The 8 MW, 4 hours (32 MWh) BESS is housed in a 6,300 square foot facility and 2 x 4 MW/4.5 MVA smart inverters are on a concrete pad adjacent to the BESS facility. The project will evaluate the capabilities of the BESS to improve grid performance and assist in the integration of large-scale intermittent generation, e.g., wind. Project performance was measured by 13 specific operational uses: providing voltage support and grid stabilization, decreasing transmission losses, diminishing congestion, increasing system reliability, deferring transmission investment, optimizing renewable-related transmission, providing system capacity and resources adequacy, integrating renewable energy (smoothing), shifting wind generation output, frequency regulation, spin/non-spin replacement reserves, ramp management, and energy price arbitrage. Most of the operations either shift other generation resources to meet peak load and other electricity system needs with stored electricity, or resolve grid stability and capacity concerns that result from the interconnection of intermittent generation. SCE also demonstrated the ability of lithium ion battery storage to provide nearly instantaneous maximum capacity for supply-side ramp rate control to minimize the need for fossil fuel-powered back-up generation. The project began in October, 2010 and will continue through December, 2016.

25 ENERGY STORAGE↗

Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 413: Clean Slate II Plutonium Dispersion (TTR) Tonopah Test Range, Nevada. Revision 0

This Corrective Action Decision Document/Corrective Action Plan provides the rationale and supporting information for the selection and implementation of corrective actions at Corrective Action Unit (CAU) 413, Clean Slate II Plutonium Dispersion (TTR). CAU 413 is located on the Tonopah Test Range and includes one corrective action site, TA-23-02CS. CAU 413 consists of the release of radionuclides to the surface and shallow subsurface from the Clean Slate II (CSII) storage–transportation test conducted on May 31, 1963. The CSII test was a non-nuclear detonation of a nuclear device located inside a concrete bunker covered with 2 feet of soil. To facilitate site investigation and the evaluation of data quality objectives decisions, the releases at CAU 413 were divided into seven study groups: 1 Undisturbed Areas 2 Disturbed Areas 3 Sedimentation Areas 4 Former Staging Area 5 Buried Debris 6 Potential Source Material 7 Soil Mounds Corrective action investigation (CAI) activities, as set forth in the CAU 413 Corrective Action Investigation Plan, were performed from June 2015 through May 2016. Radionuclides detected in samples collected during the CAI were used to estimate total effective dose using the Construction Worker exposure scenario. Corrective action was required for areas where total effective dose exceeded, or was assumed to exceed, the radiological final action level (FAL) of 25 millirem per year. The results of the CAI and the assumptions made in the data quality objectives resulted in the following conclusions: The FAL is exceeded in surface soil in SG1, Undisturbed Areas; The FAL is assumed to be exceeded in SG5, Buried Debris, where contaminated debris and soil were buried after the CSII test; The FAL is not exceeded at SG2, SG3, SG4, SG6, or SG7. Because the FAL is exceeded at CAU 413, corrective action is required and corrective action alternatives (CAAs) must be evaluated. For CAU 413, three CAAs were evaluated: no further action, clean closure, and closure in place. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of analytical data from the CAI, review of future and current operations at CAU 413, and the detailed and comparative analysis of CAAs, clean closure was selected as the preferred CAA for CAU 413 by the U.S. Air Force, Nevada Division of Environmental Protection, and U.S. Department of Energy at the CAA meeting held on August 24, 2016.

54 ENVIRONMENTAL SCIENCES↗

Airport Ground Support Equipment Infrastructure & Logistics Electrification Assessment Tool: 2025 Data Development, Modeling and Analysis for DFW

The aviation industry is increasingly turning to modernize freight facilities by integrating electric Ground Support Equipment (eGSE) to enhance operational efficiency of freight facility moving vehicles and equipment. Airports worldwide are adopting eGSE to streamline cargo movement, reduce fuel and maintenance costs, and improve logistics coordination.1 North America, with its advanced aviation infrastructure, leads this transition, leveraging Internet of things (IoT)-enabled automation and zero emission technologies to boost reliability and reduce human errors.2 Electrification of freight facility moving vehicles and equipment boosts turnaround times, improves equipment reliability, and optimizes logistics coordination, giving operators a competitive advantage. With rising fuel price volatility and the pressure to meet stringent performance benchmarks, airports are focusing on cost-effective, scalable solutions for long-term financial and operational gains. To further accelerate electrification, airports are integrating Zero Emission Vehicles (ZEVs) into rental car fleets and deploying electric baggage carts, requiring strategic investments in charging infrastructure. 3 The shift, however, presents challenges, such as limited technical expertise, high capital costs, and complex procurement processes. By forging strategic partnerships, leveraging advanced technologies, and optimizing infrastructure investments, airports can create a resilient, future-ready ecosystem that enhances the movement of people and goods through electrification-driven efficiency. Supported by the U.S. Department of Energy (DOE) Vehicle Technologies Office (VTO), this electrification effort provides a scalable, cost-effective solution to improve airport freight operations. Through targeted investments and innovation, airports enhance efficiency, reduce costs, and meet performance benchmarks while advancing toward a resilient, electrified future.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Impact Analysis of High-Altitude Electromagnetic Pulse Coupling Effects on Power Grid Protection Relays

Protection relays are important equipment used for protection, control, and metering functions in the power grid. These relays are used to protect critical and difficult-to-replace equipment, like generators, transformers, and capacitor banks. Once the protection devices are disturbed or damaged, a high risk of power generation interruption occurs. Therefore, it is important and necessary to study the relay’s immunity to electromagnetic pulse (EMP) events. As a preliminary step toward empirical experimentation on actual equipment, this manuscript outlines an economical and efficient methodology for evaluating the impact of an EMP. An impedance measurement strategy was employed to model the equipment, setting the stage for subsequent immunity analyses. These analyses included the pulse current injection (PCI) method, which utilized an injecting probe to introduce the transient, and frequency domain electromagnetic (FEKO) simulation, which integrated electromagnetic coupling effects into the transient simulation. The impedance measurement and simulation results in this paper provide a reliable basis for gauging equipment performance in the face of HEMP threats. The results obtained using the PCI and FEKO simulations demonstrated the performance of different port responses under a high-altitude EMP, indicating the requirement for some protection to ensure the reliable operation of relays.

42 ENGINEERING↗