Search NASA⌕ Search

SEARCH · Search NASA

Results for “Nuclear Operating Experience”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Initiating Event Rates at U.S. Nuclear Power Plants. 1988 - 2013

Analyzing initiating event rates is important because it indicates performance among plants and also provides inputs to several U.S. Nuclear Regulatory Commission (NRC) risk-informed regulatory activities. This report presents an analysis of initiating event frequencies at U.S. commercial nuclear power plants since each plant’s low-power license date. The evaluation is based on the operating experience from fiscal year 1988 through 2013 as reported in licensee event reports. Engineers with nuclear power plant experience staff reviewed each event report since the last update to this report for the presence of valid scrams or reactor trips at power. To be included in the study, an event had to meet all of the following criteria: includes an unplanned reactor trip (not a scheduled reactor trip on the daily operations schedule), sequence of events starts when reactor is critical and at or above the point of adding heat, occurs at a U.S. commercial nuclear power plant (excluding Fort St. Vrain and LaCrosse), and is reported by a licensee event report. This report displays occurrence rates (baseline frequencies) for the categories of initiating events that contribute to the NRC’s Industry Trends Program. Sixteen initiating event groupings are trended and displayed. Initiators are plotted separately for initiating events with different occurrence rates for boiling water reactors and pressurized water reactors. p-values are given for the possible presence of a trend over the most recent 10 years.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

On-Site Oxy-Lance Size Reduction of South Texas Project Reactor Vessel Heads - 12324

On-Site Oxy-Lance size reduction of mildly radioactive large components has been accomplished at other operating plants. On-Site Oxy-Lance size reduction of more radioactive components like Reactor Vessel Heads had previously been limited to decommissioning projects. Building on past decommissioning and site experience, subcontractors for South Texas Project Nuclear Operating Company (STPNOC) developed an innovative integrated system to control smoke, radioactive contamination, worker dose, and worker safety. STP's innovative, easy to use CEDM containment that provided oxy lance access, smoke control, and spatter/contamination control was the key to successful segmentation for cost-effective and ALARA packaging and transport for disposal. Relative to CEDM milling, STP oxy-lance segmentation saved approximately 40 person- REM accrued during 9,000 hours logged into the radiological controlled area (RCA) during more than 3,800 separate entries. Furthermore there were no personnel contamination events or respiratory uptakes of radioactive material during the course of the entire project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Enhanced Component Performance Study: Motor-Driven Pumps 1998–2013

This report presents an enhanced performance evaluation of motor-driven pumps at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from fiscal year 1998 through 2013 for the component reliability as reported in the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The motor-driven pump failure modes considered for standby systems are failure to start, failure to run less than or equal to 1 hour, and failure to run more than 1 hour; for normally running systems, the failure modes considered are failure to start and failure to run. An 8 hr unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire active period. One statistically significant increasing trend was identified in the standby pump run hours per reactor year. Statistically significant decreasing trends were identified for standby systems industry-wide frequency of start demands, run hours per reactor year for runs of less than or equal to 1 hour, and frequency of fail to start events per reactor year.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Generating Models of the Flattop Critical Assembly for Benchmark Experiments with Python

Los Alamos National Laboratory has been performing nuclear criticality experiments since 1946 at the Pajarito site, starting the Los Alamos Critical Experiments Facility in 1948. A transition period occurred between 2004 and 2011 as operations moved to the National Criticality Experiments Research Center (NCERC), where criticality experiments are now performed. Criticality experiments are essential for determination and verification of nuclear data used in calculations and modeling—such as radiation transport codes—throughout the industry, enhancing nuclear criticality safety. In addition to nuclear data validation and benchmarking, the remotely operated critical assemblies at NCERC are used for a variety of experiments and training classes supporting criticality safety.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Enhanced Component Performance Study: Air-Operated Valves 1998–2012

This report presents an enhanced performance evaluation of air-operated valves (AOVs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from fiscal year 1998 through 2012 for the component reliability as reported in the Equipment Performance and Information Exchange (EPIX). Results (beta distributions for failure probabilities upon demand and gamma distributions for rates) are used as inputs to the U.S. Nuclear Regulatory Commission standardized plant analysis risk models of U.S. commercial nuclear power plants. The AOV failure modes considered are failure-to-open/close, failure to operate or control, and spurious operation. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire active period. No statistically significant increasing trends were identified in the AOV results. Statistically significant decreasing trends were identified in two areas: AOV operation demands less than or equal to 20 demands per year and greater than 20 demands.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Information and Statistics in Nuclear Experiment and Theory (ISNET)

As with all empirical sciences, nuclear physics operates in the virtuous cycle of the scientific method: observations inspire theoretical models; models lead to new predictions; predictions are tested in experiments; experiments lead to new observations; and so on. Evaluating what we are inferring, and how certain we are of it, is key to this process. These requirements, and a general interest in applying novel statistical, mathematical, and computational techniques, led to the formation of a dedicated research community entitled “Information and Statistics in Nuclear Experiment and Theory (ISNET)” (https://isnet-series.github.io/), which now includes more than 300 members. While the community’s interests lean toward nuclear theory, the unifying theme for this group is the inference of knowledge from data.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

National Environmental Policy Act Hazards Assessment for the TREAT Alternative

This document provides an assessment of hazards as required by the National Environmental Policy Act for the alternative of restarting the reactor at the Transient Reactor Test (TREAT) facility by the Resumption of Transient Testing Program. Potential hazards have been identified and screening level calculations have been conducted to provide estimates of unmitigated dose consequences that could be incurred through this alternative. Consequences considered include those related to use of the TREAT Reactor, experiment assembly handling, and combined events involving both the reactor and experiments. In addition, potential safety structures, systems, and components for processes associated with operating TREAT and onsite handling of nuclear fuels and experiments are listed. If this alternative is selected, a safety basis will be prepared in accordance with 10 CFR 830, “Nuclear Safety Management,” Subpart B, “Safety Basis Requirements.”

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

National Environmental Policy Act Hazards Assessment for the TREAT Alternative

This document provides an assessment of hazards as required by the National Environmental Policy Act for the alternative of restarting the reactor at the Transient Reactor Test (TREAT) facility by the Resumption of Transient Testing Program. Potential hazards have been identified and screening level calculations have been conducted to provide estimates of unmitigated dose consequences that could be incurred through this alternative. Consequences considered include those related to use of the TREAT Reactor, experiment assembly handling, and combined events involving both the reactor and experiments. In addition, potential safety structures, systems, and components for processes associated with operating TREAT and onsite handling of nuclear fuels and experiments are listed. If this alternative is selected, a safety basis will be prepared in accordance with 10 CFR 830, “Nuclear Safety Management,” Subpart B, “Safety Basis Requirements.”

99 GENERAL AND MISCELLANEOUS↗

Nuclear Safety [Vol. 29, No. 1, January-March 1988]

Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. THE CHERNOBYL ACCIDENT: 1 Core History and Nuclide Inventory of the Chernobyl Core at the Time of Accident by Gerald Kirchner and Cornelius C. Noack; GENERAL SAFETY CONSIDERATIONS: 6 Nonprescriptive Nuclear Safety Regulation: The Example of Loss of Offsite Power by M. W. Golay, V. P. Manno, and C. Vlahoplus, Jr., 20 Nuclear Power Safety Goals in Light of the Chernobyl Accident by C. Whipple and C. Starr; ACCIDENT ANALYSIS: 29 Containment Loads from Severe Accidents—U.S. Program by W. Kerr and M. K. Dey; PLANT SAFETY FEATURES: 36 Safety Characteristics of Modern High-Temperature Reactors: Focus on German Designs by W. Kröger, H. Nickel, and R. Schulten; ENVIRONMENTAL EFFECTS: 49 Radiation Hormesis and Nuclear Safety by C. C. Congdon; OPERATING EXPERIENCES: 58 Evaluation of Nonradiological Water Chemistry at Power Reactors by Harvey Zibulsky, James J. Kottan, Walter J. Pasciak, Mary Ann Castrogivanni, and Sujit Banerjee, 64 Reactor Shutdown Experience Compiled by J. W. Cletcher, 67 Operating U.S. Power Reactors Compiled by E. G. Silver; RECENT DEVELOPMENTS: 85 General Administrative Activities Compiled by E. G. Silver, 94 Reports, Standards, and Safety Guides by D. S. Queener, 100 Status of Power-Reactor Projects Undergoing Licensing Review Compiled by E. G. Silver, 103 Proposed Rule Changes as of Sept. 30, 1987; ANNOUNCEMENTS: 5 Northwestern University Short Course on Radiation Safety, 28 International Approach to Nuclear Safety (After Three-Mile Island and Chernobyl), 57 RPI Short Course on Modern Developments in Boiling Heat Transfer and Two-Phase Flow, 107 20th DOE/NRC Nuclear Air Cleaning Conference, 110 Third International Topical Meeting on Nuclear Power Plant Thermal Hydraulics and Operations, 108 The Authors, 111 Indexes to Nuclear Safety, Volume 28.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Nuclear Safety [Vol. 29, No. 1, January-March 1988]

Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. THE CHERNOBYL ACCIDENT: 1 Core History and Nuclide Inventory of the Chernobyl Core at the Time of Accident by Gerald Kirchner and Cornelius C. Noack; GENERAL SAFETY CONSIDERATIONS: 6 Nonprescriptive Nuclear Safety Regulation: The Example of Loss of Offsite Power by M. W. Golay, V. P. Manno, and C. Vlahoplus, Jr., 20 Nuclear Power Safety Goals in Light of the Chernobyl Accident by C. Whipple and C. Starr; ACCIDENT ANALYSIS: 29 Containment Loads from Severe Accidents—U.S. Program by W. Kerr and M. K. Dey; PLANT SAFETY FEATURES: 36 Safety Characteristics of Modern High-Temperature Reactors: Focus on German Designs by W. Kröger, H. Nickel, and R. Schulten; ENVIRONMENTAL EFFECTS: 49 Radiation Hormesis and Nuclear Safety by C. C. Congdon; OPERATING EXPERIENCES: 58 Evaluation of Nonradiological Water Chemistry at Power Reactors by Harvey Zibulsky, James J. Kottan, Walter J. Pasciak, Mary Ann Castrogivanni, and Sujit Banerjee, 64 Reactor Shutdown Experience Compiled by J. W. Cletcher, 67 Operating U.S. Power Reactors Compiled by E. G. Silver; RECENT DEVELOPMENTS: 85 General Administrative Activities Compiled by E. G. Silver, 94 Reports, Standards, and Safety Guides by D. S. Queener, 100 Status of Power-Reactor Projects Undergoing Licensing Review Compiled by E. G. Silver, 103 Proposed Rule Changes as of Sept. 30, 1987; ANNOUNCEMENTS: 5 Northwestern University Short Course on Radiation Safety, 28 International Approach to Nuclear Safety (After Three-Mile Island and Chernobyl), 57 RPI Short Course on Modern Developments in Boiling Heat Transfer and Two-Phase Flow, 107 20th DOE/NRC Nuclear Air Cleaning Conference, 110 Third International Topical Meeting on Nuclear Power Plant Thermal Hydraulics and Operations, 108 The Authors, 111 Indexes to Nuclear Safety, Volume 28.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Enhanced Component Performance Study: Air-Operated Valves 1998-2014

This report presents a performance evaluation of air-operated valves (AOVs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from fiscal year 1998 through 2014 for the component reliability as reported in the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The AOV failure modes considered are failure-to-open/close, failure to operate or control, and spurious operation. The component reliability estimates and the reliability data are trended for the most recent 10-year period, while yearly estimates for reliability are provided for the entire active period. One statistically significant trend was observed in the AOV data: The frequency of demands per reactor year for valves recording the fail-to-open or fail-to-close failure modes, for high-demand valves (those with greater than twenty demands per year), was found to be decreasing. The decrease was about three percent over the ten year period trended.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Enhanced Component Performance Study: Motor-Driven Pumps 1998–2014

This report presents an enhanced performance evaluation of motor-driven pumps at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from fiscal year 1998 through 2014 for the component reliability as reported in the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The motor-driven pump failure modes considered for standby systems are failure to start, failure to run less than or equal to one hour, and failure to run more than one hour; for normally running systems, the failure modes considered are failure to start and failure to run. An eight hour unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire active period. Statistically significant increasing trends were identified in pump run hours per reactor year. Statistically significant decreasing trends were identified for standby systems industry-wide frequency of start demands, and run hours per reactor year for runs of less than or equal to one hour.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Enhanced Component Performance Study: Turbine-Driven Pumps 1998–2014

This report presents an enhanced performance evaluation of turbine-driven pumps (TDPs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from fiscal year 1998 through 2014 for the component reliability as reported in the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The TDP failure modes considered are failure to start (FTS), failure to run less than or equal to one hour (FTR=1H), failure to run more than one hour (FTR>1H), and normally running systems FTS and failure to run (FTR). The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire active period. Statistically significant increasing trends were identified for TDP unavailability, for frequency of start demands for standby TDPs, and for run hours in the first hour after start. Statistically significant decreasing trends were identified for start demands for normally running TDPs, and for run hours per reactor critical year for normally running TDPs.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Enhanced Component Performance Study: Motor-Driven Pumps 1998–2016

This report presents an enhanced performance evaluation of motor-driven pumps (MDP) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2016 for the component reliability as reported in the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The motor-driven pump failure modes considered for standby systems are failure to start, failure to run less than or equal to one hour, and failure to run more than one hour; for normally running systems, the failure modes considered are failure to start and failure to run. An eight hour unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire active period. Highly statistically significant increasing trend was identified in normally running MDP run hours per reactor year.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Enhanced Component Performance Study: Air-Operated Valves 1998–2014

This report presents a performance evaluation of air-operated valves (AOVs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from fiscal year 1998 through 2014 for the component reliability as reported in the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The AOV failure modes considered are failure-to-open/close, failure to operate or control, and spurious operation. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire active period. Three statistically significant trends were observed in the AOV data: 1) The failure rate estimate for fail-to-operate, across all systems, for valves with less than or equal to twenty demands per reactor year, was found to be increasing. 2) The frequency of failure per reactor year for fail-to-operate, across all systems, for valves with less than or equal to twenty demands per reactor year, was found to be increasing. 3) The frequency of demands per reactor year for valves recording the fail-to-open or fail-to-close failure modes, for valves with greater than twenty demands per year, was found to be decreasing.

99 GENERAL AND MISCELLANEOUS↗

Enhanced Component Performance Study: Motor-Operated Valves 1998–2014

This report presents an enhanced performance evaluation of motor-operated valves (MOVs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from fiscal year 1998 through 2014 for the component reliability as reported in the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The MOV failure modes considered are failure to open/close, failure to operate or control, and spurious operation. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire active period. One statistically significant trend was observed in the data: The frequency of demands per reactor year for valves with fail-to-open/close failure modes, for valves with greater than twenty demands per year, was found to be decreasing.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Initiating Event Rates at U.S. Nuclear Power Plants 1988–2013

Analyzing initiating event rates is important because it indicates performance among plants and also provides inputs to several U.S. Nuclear Regulatory Commission (NRC) risk-informed regulatory activities. This report presents an analysis of initiating event frequencies at U.S. commercial nuclear power plants since each plant’s low-power license date. The evaluation is based on the operating experience from fiscal year 1988 through 2013 as reported in licensee event reports. Engineers with nuclear power plant experience staff reviewed each event report since the last update to this report for the presence of valid scrams or reactor trips at power. To be included in the study, an event had to meet all of the following criteria: includes an unplanned reactor trip (not a scheduled reactor trip on the daily operations schedule), sequence of events starts when reactor is critical and at or above the point of adding heat, occurs at a U.S. commercial nuclear power plant (excluding Fort St. Vrain and LaCrosse), and is reported by a licensee event report. This report displays occurrence rates (baseline frequencies) for the categories of initiating events that contribute to the NRC’s Industry Trends Program. Sixteen initiating event groupings are trended and displayed. Initiators are plotted separately for initiating events with different occurrence rates for boiling water reactors and pressurized water reactors. p-values are given for the possible presence of a trend over the most recent 10 years.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Major Considerations on the Nuclear Material Accounting of PB-HTR Commercial Plants

The pebble bed high temperature reactor (PB-HTR) is a promising reactor type with inherent safety features in the next generation nuclear systems Based on the experience of studying and operating test PB-HTR (the HTR-10) for decades, China is constructing the first commercial nuclear power plant of modular PB-HTR in the world, i.e. the HTR-PM, which is expected to commission by the end of 2017. Since the PB-HTRs are quite different from the conventional PWRs in many aspects, including the large amount of fuel pebbles, the continuous refueling, the low heavy metal density in fuels, the safeguards of PB-HTR is important to investigate. Unfortunately, the research on this topic is insufficient by far, especially for the upcoming commercial PB-HTR plants. The PB-HTR has excellent features on proliferation resistance The graphite fuel pebbles with diameter of 6 cm are used as fuel elements, embedded with more than ten thousand TRISO coated fuel particles. This kind of fuel design provides more than one order of magnitude lower heavy metal concentration in fuel than other fuels. For the typical uranium loading of 7 grams in the HTR-PM, more than 10,000 fresh fuel pebbles (about 1.2 tons) are required to provide a significant quantity of indirect-use uranium with enrichment less than 20%. Moreover, the reprocessing of TRISO particle fuels is difficult because of the rigid SiC layer in the coating. Also, the possibility of utilizing materials from PB-HTR's spent fuels to product dirty bombs is quite low just due to the same reason as reprocessing. On the other hand, the large amount of fuel pebbles and the continuous on-line fueling introduce new challenges in nuclear safeguards and material accounting of PB-HTRs. This summary discusses the major considerations on the nuclear material accounting of PB-HTRs.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗