Search NASA⌕ Search

SEARCH · Search NASA

Results for “COST ESTIMATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,171 records · Page 65

Status memorandum on ORNL support of vendor irradiation capsule design and ASME irradiation code development and new ASTM test standard development activities

This report is in submission of completion of the Level 4 milestone number M4TG-24OR0501111 within the larger Advanced Reactor Technologies Gas Cooled Reactor program at Oak Ridge National Laboratory (ORNL). The focus of this year’s efforts is to continue support of industry needs related to the development of future industry-funded irradiation programs. At ORNL these efforts included the development of a generalized three-dimensional CAD model of an irradiation creep capsules for graphite, cost estimates of the expansion of the Materials Irradiation Facility (MIF), involvement with ASTM D02.F0 “Manufactured Carbon and Graphite Products” and the ASME Boiler and Pressure Vessel Code, and publication of papers supporting these efforts. This report will document the status of these activities.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Pilot-Scale Algal Oil Production

The main objective of the project is complete: development of a preliminary planning and design for a pilot-scale algal oil cultivation and processing facility, FEL-3 design with -5% / +15% cost estimate accuracy, and conversion of the algal oil to biofuel in an off-site existing bio-oil refinery. The design basis includes 10 tons per day of dried algae cultivated with CO 2 supplied by direct air capture, electricity supplied solar power, well water supply, zero liquid discharge, off-site extraction, and off-site conversion of oil to biofuel. The design and permitting package is an important milestone in the path to commercialization of algal biofuels and bioproducts as it provides the preliminary design, permitting path, long-term land lease, planning documents, and team needed for success in future engineering, construction, start-up and operations of a pilot-scale farm at a site in Paso Robles, CA. Outcomes of the business assessment include (i) identification of a product spectrum for economical algal biofuels using co-products with markets that are commensurate with production of 6-7 billion gallons per year of sustainable aviation fuel (SAF), renewable diesel, and renewable gasoline, (ii) a path toward near-term contribution of algae oil to SAF, and (iii) an approach for long-term operation of a pilot-scale farm.

09 BIOMASS FUELS↗

Carbon storage cost modeling for the offshore Gulf of Mexico

Groundbreaking for geologic carbon storage (GCS) projects in the offshore Gulf of Mexico is imminent, and there is great interest in utilizing this region for GCS projects. Offshore saline reservoirs provide a significant and accessible resource for GCS. However, conducting GCS in the offshore environment will pose distinct challenges pertaining to site selection, operations, infrastructure use, and monitoring compared to operating onshore that ultimately affect technoeconomic assessment of offshore GCS projects. Carbon storage and transport costs are critical to project developers looking to deploy carbon storage in the offshore environment. We present CO2_S_COM_Offshore, a model developed by the National Energy Technology Laboratory (NETL) as a screening-level offshore saline GCS cost modeling tool. Based on NETL’s widely used CO2_S_COM cost model for onshore saline CS, CO2_S_COM_Offshore enables technoeconomic analysis of GCS in offshore areas. This model comprehensively incorporates multiple facets of offshore GCS projects, from regional evaluation and site selection to permitting, transport, operations, monitoring, site closure, and decommissioning. In general, the model can explore the cost implications for potential offshore GCS project(s) by enabling the user to change several project operational and financial attribute configurations. Key inputs include offshore storage formation options, CO2 injection rate and duration, infrastructure types, monitoring intensity, project financing, and post-injection site care duration. Supporting cost algorithms within CO2_S_COM_Offshore were compiled utilizing S&P Global’ s QUE$TORTM cost estimation software alongside a variety of open-source scientific literature. In addition to reviewing key model components, we discuss several sensitivity analyses, input variabilities, and results on analysis of break-even CO2 price required by a project based on different regulation/policy and operational scenarios for the offshore Gulf of Mexico. These results indicate the value of modeling offshore GCS specifically, and the potential of offshore GCS within a decarbonization value chain. Presented at the 41st USAEE/IAEE North American Conference, 3-6 November 2024, Baton Rouge, LA, United States.

Mark-Moser, Mackenzie K.↗

Nuclear Direct Air Capture with Carbon Storage (NuDACCS) (Final Technical Report)

This final report, which is for DOE Award Number DE-FE0032160 (Direct Air Capture Combined with dedicated Long-Term Carbon Storage, Coupled to Existing Low-Carbon Energy), covers the Nuclear Direct Air Capture with Carbon Storage (NuDACCS) project period of performance from 03/31/2022 to 12/27/2024. Battelle Memorial Institute (Battelle) partnered with Aircapture LLC (Aircapture), Southern Company (Southern), Carbonvert, the University of Alabama, and Sargent & Lundy (S&L) to develop a front end engineering design (FEED) study for a direct air capture (DAC) system co-located with Southern Company's Joseph M. Farley Nuclear Plant (Plant Farley) in Columbia, Alabama. The DAC system was designed to capture at least 5,000 net tonnes of carbon dioxide (CO2) per year from ambient air in a form suitable for long duration carbon storage (e.g., geologic storage). To complement and support the FEED study, additional analyses were completed, including a Technology Maturation Plan (TMP); Workforce Readiness Plan; Project Cost Estimate; Business Case Analysis (BCA); Life Cycle Analysis (LCA); Environmental Health and Safety (EH&S) Assessment; and Environmental Justice (EJ) Analysis and Economic Revitalization and Job Creation Outcomes Analysis.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Advanced Ceramic Membranes/Modules for Ultra Efficient Hydrogen (H2) Production/Carbon Dioxide (CO2) Capture for Coal-Based Polygeneration Plants: Fabrication, Testing and CFD Modeling

Inorganic membrane-based systems are a promising technology for precombustion CO2 capture with simultaneous H2 production. State-of-the-art packages for high temperature and pressure service consist of multiple tube membrane bundles prepared in a "candle filter" configuration, in which the membrane tubes are open at one end and sealed at the other. This configuration is used for practical reasons, specifically the need to minimize problems due to thermal expansion mismatch between the ceramic tube bundle and the steel housing. However, the primary technical problem with the candle filter format for commercial-scale installations is the inability to purge the tube side (typically the permeate side), a feature that is crucial for high H2 recovery. In this study, the focus is to design and fabricate the first dual-end open full ceramic multiple tube membrane bundle that enables tube side (permeate) purge for gas separation applications. An additional key feature of this design is the simplified module layout, as the membrane bundles can be installed end-to-end with tube side (permeate) flow directly from one bundle to the next. This layout simplifies the membrane to housing seals and yields significant improvement in membrane packing density. Detailed focus areas in our studies include: (i) Materials development and preparation of the tube-to-tube sheet potting for the dual-ended bundle; (ii) the sealing and optimal module configuration design to minimize membrane stress upon module mounting; (iii) the demonstration, via the fabrication of CMS and Pd-alloy membranes supported on full-size, dual-ended ceramic support bundles, of the first example of a purgeable ceramic membrane and module; and (iv) development of a CFD model of the membrane module for calculation of feed flow distribution, and for use in scale-up, and capital cost estimating. The CFD model was validated using experimental data with the multi-tubular membrane system, employing He/N2 as a model gas mixture (surrogate for H2/CO2), and has been shown to be quite accurate. Employing the model, we are able to study the effects of operating pressure and temperature, feed and sweep gas flow rates, and the choice of membrane tube configuration on system performance.

20 FOSSIL-FUELED POWER PLANTS↗

Research Reactors Division Infrastructure Investment Plan for the High Flux Isotope Reactor

The High Flux Isotope Reactor (HFIR) is a unique national asset. Operational for nearly 60 years, continued investment into the aging infrastructure is necessary to ensure operation for another 6 decades. Additionally, growing missions require HFIR as well as important upgrades. Consequently, carefully integrated planning is required to ensure that infrastructure investments are timely executed to ensure long-term, reliable operation of HFIR. Concerns about challenges to the operational reliability of HFIR resulted in a recommendation from the 2023 Operations Review by the US Department of Energy (DOE) Office of Basic Energy Sciences that a HFIR management strategy be developed to address the infrastructure needs. This report defines the investment needs, which are evolving as new upgrade efforts are better defined. HFIR is part of the three-source strategy within the Neutron Sciences Directorate (NScD) and contributes to the five strategic science areas outlined in the NScD 10 Year Strategic Science Plan: quantum materials, soft matter, materials and engineering, chemistry, and biosciences. Fundamental to this strategy are three core values: operational excellence, responsible stewardship, and servant leadership. These values guide our mission of safe and reliable operation of the reactor and require a strong and just nuclear safety culture, a solemn respect for responsible care of the facility, good workforce development, robust procedures and processes, an effective communication strategy, world-class asset management, a determined customer focus, and a commitment to protecting the environment, the safety and health of the public and our people, and the quality of work performed within our facility. These principles are all essential to operate HFIR at a world-class level. The Research Reactors Division (RRD) will lead a new era of neutron science and isotope production at HFIR through responsible and purposeful leadership and unwavering support of the science community. The approach outlined in this plan highlights the direction leadership is taking to ensure that HFIR is ready to support the science challenges and national needs of the future and that the United States maintains world leadership in neutron sciences. The plan is in alignment with the DOE’s desire to continue operating HFIR and with the NScD strategic science goals for the future. HFIR is an aging facility with numerous infrastructure challenges and needs. It has an aging workforce in relation to the general population of Oak Ridge National Laboratory (ORNL), with many expected retirements over the next 5–10 years. With an increase in work scope caused by changing national priorities and science goals, several critical hires have been identified. To manage HFIR’s infrastructure needs, a prioritized list of equipment upgrades has been identified along with an analysis of future staffing requirements. A desire to operate HFIR at eight cycles per year will necessarily require some significant changes to procedures and processes currently in place as well as targeted staffing additions. Many of the equipment upgrades identified in this plan will significantly increase the reliability of the plant, thus contributing to the effort to reach the goal of safely operating eight cycles per year. A plan to attain eight-cycle operation is being prepared in parallel with the activities identified in this plan, although the actions identified to satisfy both plans will overlap. This plan identifies new infrastructure needs—for both plant equipment and staffing—thus necessitating formulation of future budget requests to fund the increased work scope and improvement activities. Some activities are currently being scheduled with the expectation that funding will be received. Any delays to funding or reductions of funding from the identified cost estimations will directly and negatively affect the plan’s implementation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Self-healable Copolymer Composites for Extended Service H 2 Dispensing Hoses

In this project, we designed, synthesized and fabricated using X-winder technologies precommercialized novel, self-healingable commodity copolymer fiber-reinforced composites to extend the H 2 hose service life beyond the current target of 1000 fills. These studies demonstrated that these composites are able to withstand over 25,000 damage-repair cycles, which was the main objective of the proposed project, in the temperature range of -40 to +80 °C under variable pressures. When micro-cracks are formed after about 1,000 cycles/fueling per hose in the inner composite layer, these micro-cracks self-heal, thus extending the lifetime of a prototype inner layer of the hose. These composites were tested by exposure to H 2 fuel and demonstrated the ability to recover from mechanical damage. Thermomechanical testing combined with analysis of the stress and strain fields across the cross-section of the inner layer composite hoses also identified the ring-like stresses on the edge of inner layers arising from changes of the fiber winding angle directions from +45° to -45°. The developed novel concept that self-healing commodity copolymers can be used in the development of prototype composites for the extended service of H 2 dispensing hoses will have major implications for other energy-related technologies, where the extended service life in harsh environments is expected. In this project, we optimized, validated, and demonstrated novel copolymer fiber-reinforced composites for H 2 dispensing hose applications, which can be utilized in future manufacturing using commodity materials. The estimated cost of materials (exluding labor) is in the range of < $1.0/ft.

08 HYDROGEN↗

Floating Offshore Wind US Manufacturing and Commercialization (CRADA Final Report)

Create a detailed manufacturing, assembly, load-out, transportation, upending, turbine integration, and offshore transportation plan for a hypothetical project in one of the California lease areas off the central coast. Develop a detailed schedule and cost estimation for each step of the process and compare with conventional floating platform designs.

17 WIND ENERGY↗

Carbon Capture Plant Front-End Engineering Design Study for Cement Manufacturing

The objective of this project was to conduct a Front-End Engineering Design (FEED) study for capturing carbon dioxide (CO₂) from cement plant flue gas using non-aqueous solvents (NAS) with a 95% capture efficiency. The study aimed to develop AACE (Association for the Advancement of Cost Engineering) Class 3 cost estimates for a commercial-scale CO₂ capture system with a capacity of 2.4 million tonnes of CO₂ per year (t-CO₂/yr). The results will provide Cemex and the U.S. Department of Energy with reliable data to support investment decisions, evaluate economic feasibility, and guide future project development and implementation.

20 FOSSIL-FUELED POWER PLANTS↗

Numerical Modeling & Size Optimization of Thermal Energy Storage for Iron & Steel Production

Iron and steel production are responsible for 90 million MtCO2 per year in the United States. Hydrogen direct reduction of iron (H2DRI) is a promising pathway for a more sustainable iron production than commercially deployed technologies which rely on natural gas. The H2DRI process requires hydrogen at a temperature of up to 950 degrees C fed into a reduction furnace to produce pellets or briquettes that are used in the downstream iron and steelmaking process. In this work, we propose to use an electrical thermal energy storage (ETES) system, that can use renewable electricity to store high-temperature heat and dispatch it upon demand. Such a system can buffer the H2DRI plant from the variability of electricity prices by charging during curtailment and running the plant from storage during times of peak electricity price. We have developed heat transfer models for two different ETES systems that can be used to heat up hydrogen to the required temperatures: a particle-based ETES and a firebrick ETES. These models are used to evaluate the performance of such a system and support the sizing and preliminary cost estimation. The preliminary results using both models show that designing ETES systems for an industrial-scale H2DRI furnace is feasible. The firebrick ETES system has limited operational duration, which might limit the price buffering effect unless significantly oversized. The particle ETES system heat exchanger has industry-feasible dimensions, but its storage capacity would be decided upon the number of particle storage silos.

25 ENERGY STORAGE↗

Increasing Power Generation at the Patua Nevada Geothermal Field through Targeted and Adaptive EGS

In 2020, Patua Acquisition Company LLC, submitted the proposal “Increasing Power Generation at the Patua Nevada Geothermal Field through Targeted and Adaptive EGS”, in response to the DOE’s Geothermal Wells of Opportunity Funding Opportunity Announcement. The primary goal of the project was to convert an idle well, Patua 16-29, to an active producer and generate at least an additional 5 MWe at the Patua plant. The project was intended to provide an example of a reproducible methodology for well stimulation in Enhanced Geothermal Systems The project was proposed to be performed in three phases over a period of performance of four years. A first project go/no-go decision was made at the end of Phase 1 based on feasibility of the wellbore, site, and ability to realize a 5 MWe benefit from the project. Several factors were recognized that led to a no-go decision at this phase: • Electrical needs for placing the stimulated well on production were not considered in the initial scoping. Costs of pipeline costs were also underestimated in the original cost share. Easements and rights-of-way to establish a geothermal pipeline underneath or across an interstate highway were also found to be intractable on the time scale of the project. • The plant is injection limited, and no design or cost estimate was in place to handle the additional production needed to realize a 5 Mwe benefit. A new injection well would need to be drilled in addition to the other facility improvements to bring in the stimulated well. Patau Acquisition Company attempted to locate additional wells of opportunity that could realize the SOPOs goals, but was unsuccessful. As a result, this project is being terminated at the end of Phase 1.

15 GEOTHERMAL ENERGY↗

Mitchell FEED Study Summary Report (Unlimited Rights Version) (Rev. D)

Heidelberg Materials (HM), Sargent & Lundy (S&L), and Mitsubishi Heavy Industries (MHI) completed a Front End Engineering Design (FEED) study for deployment of an amine-based CO 2 capture system at the Mitchell Cement Plant in Indiana. The project includes compression of captured CO 2 to a supercritical state for geological sequestration. The flue gases from 7,000 mtpd clinker plant combined with auxiliary boiler flue gases into the capture system. Auxiliary boiler supplies steam for solvent regeneration. The study developed an AACE Class 3 capital cost estimate (+30%/-20%) at approximately 30% design completion to evaluate the technical and economic feasibility of capturing up to 2 million tonnes of CO 2 per year.

42 ENGINEERING↗

Considerations for Maritime Nuclear Technologies, Economic Viability and Public Acceptance

The Maritime Nuclear Application Group (MNAG) is a working group convened by the National Reactor Innovation Center at Idaho National Laboratory (INL), the American Bureau of Shipping, and Morgan, Lewis, and Bockius LLP. This report documents an MNAG examination of considerations relevant to implementing nuclear technology in commercial maritime applications. In general, two types of use case are examined: maritime nuclear power plants and nuclear reactors used on board shipping vessels for propulsion and other ship needs. The report finds that there may be economic benefits related to maritime nuclear technologies, including the flexible deployment of maritime nuclear reactors, which would allow them to complement land-based nuclear projects, and operational differences for nuclear cargo ships that may lead to an overall increase in revenue. High-level analyses in this report show that, based on general small modular reactor and microreactor cost estimates developed by INL, maritime nuclear reactors may be economically competitive for electricity production in remote regions and for use in the propulsion of large cargo ships. Besides economic viability, public acceptance will be key to implementing maritime nuclear technologies. The report discusses the public’s current perception of nuclear technologies. Engaging with the public will be important to improving this perception. The report discusses some key benefits and risks associated with maritime nuclear technologies. Benefits include the creation of jobs, the production of reliable energy, and the potential to improve air quality. Risks that concern the public are the potential for radioactive releases during operation and decommissioning, as well as those related to waste management. Communicating the benefits and the risks of maritime nuclear technologies will be essential to improving public perception.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Facility Configuration Study of the High Temperature Gas-Cooled Reactor Component Test Facility

A test facility, referred to as the High Temperature Gas-Cooled Reactor Component Test Facility or CTF, will be sited at Idaho National Laboratory for the purposes of supporting development of high temperature gas thermal-hydraulic technologies (helium, helium-Nitrogen, CO2, etc.) as applied in heat transport and heat transfer applications in High Temperature Gas-Cooled Reactors. Such applications include, but are not limited to: primary coolant; secondary coolant; intermediate, secondary, and tertiary heat transfer; and demonstration of processes requiring high temperatures such as hydrogen production. The facility will initially support completion of the Next Generation Nuclear Plant. It will secondarily be open for use by the full range of suppliers, end-users, facilitators, government laboratories, and others in the domestic and international community supporting the development and application of High Temperature Gas-Cooled Reactor technology. This pre-conceptual facility configuration study, which forms the basis for a cost estimate to support CTF scoping and planning, accomplishes the following objectives: • Identifies pre-conceptual design requirements • Develops test loop equipment schematics and layout • Identifies space allocations for each of the facility functions, as required • Develops a pre-conceptual site layout including transportation, parking and support structures, and railway systems • Identifies pre-conceptual utility and support system needs • Establishes pre-conceptual electrical one-line drawings and schedule for development of power needs.

42 ENGINEERING↗

RIVER PROTECTION PROJECT SYSTEM PLAN

The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, the ORP is responsible for the retrieval, treatment, and disposal of the approximately 57 million gallons of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The previous revision of the System Plan was issued in September 2003. ORP has approved a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. The ORP has established contracts to implement this strategy to establish a basic capability to complete the overall mission. The current strategy for completion of the mission uses a number of interrelated activities. The ORP will reduce risk to the environment posed by tank wastes by: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) for treatment and disposal; (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) and about half of the low-activity waste (LAW) contained in the tank farms, and maximizing its capability and capacity; (3) Developing and deploying supplemental treatment capability or a second WTP LAW Facility that can safely treat about half of the LAW contained in the tank farms; (4) Developing and deploying treatment and packaging capability for transuranic (TRU) tank waste for shipment to and disposal at the Waste Isolation Pilot Plant (WIPP); (5) Deploying interim storage capacity for the immobilized HLW and shipping that waste to Yucca Mountain for disposal; (6) Operating the Integrated Disposal Facility for the disposal of immobilized LAW, along with the associated secondary waste, (7) Closing the SST and DST tank farms, ancillary facilities, and al1 waste management and treatment facilities, (8) Developing and implementing technical solutions to mitigate the impact from substantial1y increased estimates of Na added during the pretreatment of the tank waste solids, This involves a combination of: (1) refining or modifying the flowsheet to reduce the required amount of additional sodium, (2) increasing the overall LAW vitrification capacity, (3) increasing the incorporation of sodium into the LAW glass, or (4) accepting an increase in mission duration, ORP has made and continues to make modifications to the WTP contract as needed to improve projected plant performance and address known or emerging risks, Key elements of the implementation of this strategy are included within the scope of the Tank Operations Contract, currently in procurement Since 2003, the ORP has conducted over 30 design oversight assessments of the Waste Treatment and Immobilization Plant (WTP). The estimated cost at completion has increased and the schedule for construction and commissioning of the WTP has extended, The DOE, Office of Environmental Management (EM), sanctioned a comprehensive review of the WTP flowsheet, focusing on throughput. In 2005, the TFC completed interim stabilization of the SSTs and as of March 2007, has completed the retrieval of seven selected SSTs. Demonstration of supplemental treatment technologies continues. The ongoing tank waste retrieval experience, progress with supplemental treatment technologies, and changes in WTP schedule led to the FY 2007 TFC baseline submittal in November 2006. The TFC baseline submittal was developed before the WTP schedule was fully understood and approved by ORP, and therefore reflects an earlier start date for the WTP facilities. This System Plan is aligned with the current WTP schedule with hot commissioning beginning in 2018 and full operations beginning in 2019. Major decisions regarding the use of supplemental treatment and the associated technology, the ultimate needed capacity, and its relationship to the WTP have not yet been finalized. This System Plan assumes that the outcome of this decision will be to provide a supplemental LAW treatment system using in-container vitrification (ICV{trademark}) as the enabling technology. No final implementation decisions regarding supplemental technology can be made until the Tank Closure and Waste Management Environmental Impact Statement is completed and a Record of Decision is issued by the DOE.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Polarimeters and Energy Spectrometers for the ILC Beam Delivery System

This article gives an overview of current plans and issues for polarimeters and energy spectrometers in the Beam Delivery System of the ILC. It is meant to serve as a useful reference for the Detector Letter of Intent documents currently being prepared. Concepts for high precision polarization and energy measurements exist. These concepts have resulted in detailed system layouts that are included in the RDR description for the Beam Delivery System. The RDR includes both upstream and downstream polarimeters and energy spectrometers for both beams. This provides needed complementarity and redundancy for achieving the precision required, with adequate control and demonstration of systematic errors. The BDS polarimeters and energy spectrometers need to be a joint effort of the ILC BDS team and the Detector collaborations, with collaboration members responsible for the performance and accuracy of the measurements. Details for this collaboration and assigning of responsibilities remain to be worked out. There is also a demonstrated need for Detector physicists to play an active role in the design and evaluation of accelerator components that impact beam polarization and beam energy capabilities, including the polarized source and spin rotator systems. A workshop was held in 2008 on ILC Polarization and Energy measurements, which resulted in a set of recommendations for the ILC design and operation. Additional input and action is needed on these from the Detector collaborations, the Research Director and the GDE. Work is continuing during the ILC engineering design phase to further optimize the polarimeter and energy spectrometer concepts and fully implement them in the ILC. This includes consideration for alternative methods, detailed design and cost estimates, and prototype and test beam activities.

43 PARTICLE ACCELERATORS↗

Seca Coal-Based Systems Program

This report summarizes the progress made during the August 1, 2006 - May 31, 2008 award period under Cooperative Agreement DE-FC26-05NT42614 for the U. S. Department of Energy/National Energy Technology Laboratory (USDOE/NETL) entitled 'SECA Coal Based Systems'. The initial overall objective of this program was to design, develop, and demonstrate multi-MW integrated gasification fuel cell (IGFC) power plants with >50% overall efficiency from coal (HHV) to AC power. The focus of the program was to develop low-cost, high performance, modular solid oxide fuel cell (SOFC) technology to support coal gas IGFC power systems. After a detailed GE internal review of the SOFC technology, the program was de-scoped at GE's request. The primary objective of this program was then focused on developing a performance degradation mitigation path for high performing, cost-effective solid oxide fuel cells (SOFCs). There were two initial major objectives in this program. These were: (1) Develop and optimize a design of a >100 MWe integrated gasification fuel cell (IGFC) power plant; (2) Resolve identified barrier issues concerning the long-term economic performance of SOFC. The program focused on designing and cost estimating the IGFC system and resolving technical and economic barrier issues relating to SOFC. In doing so, manufacturing options for SOFC cells were evaluated, options for constructing stacks based upon various cell configurations identified, and key performance characteristics were identified. Key factors affecting SOFC performance degradation for cells in contact with metallic interconnects were be studied and a fundamental understanding of associated mechanisms was developed using a fixed materials set. Experiments and modeling were carried out to identify key processes/steps affecting cell performance degradation under SOFC operating conditions. Interfacial microstructural and elemental changes were characterized, and their relationships to observed degradation identified. Mitigation strategies, including innovative coatings and bond layers, were developed, evaluated and down-selected to improve degradation rates. Focus was on microstructural stabilization and minimization of the ASR contribution from Cr{sub 2}O{sub 3} scale growth and other interactions at electrode/interconnect interfaces evaluated during electrochemical testing and advanced microstructural characterization. Novel long-term and accelerated testing techniques were developed and conducted under standard operating conditions to demonstrate capability to meet targeted degradation rates.

01 COAL, LIGNITE, AND PEAT↗

Facility for Advanced Accelerator Experimental Tests at SLAC (FACET) Conceptual Design Report

This Conceptual Design Report (CDR) describes the design of FACET. It will be updated to stay current with the developing design of the facility. This CDR begins as the baseline conceptual design and will evolve into an 'as-built' manual for the completed facility. The Executive Summary, Chapter 1, gives an introduction to the FACET project and describes the salient features of its design. Chapter 2 gives an overview of FACET. It describes the general parameters of the machine and the basic approaches to implementation. The FACET project does not include the implementation of specific scientific experiments either for plasma wake-field acceleration for other applications. Nonetheless, enough work has been done to define potential experiments to assure that the facility can meet the requirements of the experimental community. Chapter 3, Scientific Case, describes the planned plasma wakefield and other experiments. Chapter 4, Technical Description of FACET, describes the parameters and design of all technical systems of FACET. FACET uses the first two thirds of the existing SLAC linac to accelerate the beam to about 20GeV, and compress it with the aid of two chicanes, located in Sector 10 and Sector 20. The Sector 20 area will include a focusing system, the generic experimental area and the beam dump. Chapter 5, Management of Scientific Program, describes the management of the scientific program at FACET. Chapter 6, Environment, Safety and Health and Quality Assurance, describes the existing programs at SLAC and their application to the FACET project. It includes a preliminary analysis of safety hazards and the planned mitigation. Chapter 7, Work Breakdown Structure, describes the structure used for developing the cost estimates, which will also be used to manage the project. The chapter defines the scope of work of each element down to level 3.

43 PARTICLE ACCELERATORS↗