Search NASA⌕ Search

SEARCH · Search NASA

Results for “Electric Generation and Transmission”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Principles for Equitable Transmission Planning

Energy justice is gaining traction in the planning processes that govern the generation and supply of electric power in the U.S., with a growing number of federal and state authorities applying it as a framework to ensure that the benefits of a clean energy future extend to all levels of society. However, the principles of energy justice have not yet been integrated into electric transmission planning processes, which are designed to meet established reliability criteria and have not historically considered externalities like social inequities. This paper presents a review of transmission planning requirements in the U.S. and existing literature on energy justice, then synthesizes them to propose a framework for incorporating energy justice principles into transmission planning processes to yield more equitable outcomes. By applying procedural and recognition justice principles to create more extensive, inclusive, and diverse public participation in the planning process, planners can gain insight into—and begin to correct—the inequities created by previous planning decisions. Equipped with this understanding and informed by affected communities, planners can improve the distributional outcomes of the planning process and identify opportunities for energy system investments that will restore communities and place them on more equitable footing.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: 2025 Edition – Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2024 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with interconnection.fyi, Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 49 non-ISO balancing areas), which collectively represent ~97% of currently installed U.S. electric generating capacity. The dataset includes requests submitted to queues through the end of 2024, and only includes requests seeking to connect to the transmission grid (not distribution-connected or behind-the-meter projects). The files below include both a PDF report and an Excel data file. The PDF report analyzes interconnection data and metrics through the end of 2024. The Excel data file includes (a) the full project-level interconnection queue dataset through 2024, (b) a codebook (data dictionary) describing each data field, and (c) 35 additional tabs featuring tables summarizing a range of interconnection metrics. Key highlights from the Queued Up: 2025 Edition (featuring data through 2024) include: • As of the end of 2024, there were ~10,300 projects actively seeking grid interconnection in the U.S., representing 1,400 GW of generation and approximately 890 GW of storage. • Historic withdrawal rates alongside relatively fewer new requests resulted in a 12% decrease in total active queue volume compared to the prior year. • Active natural gas capacity (136 GW, +72% year-over-year) increased in 2024, while solar (956 GW, -12%), storage (890 GW, -13%), and wind (271 GW, -26%) capacity decreased. • 408 GW of capacity already has a draft or executed interconnection agreement (IA) but has not yet reached commercial operations. • The time projects spend in queues before reaching COD is increasing. For the regions with available data, the median duration from IR to COD has doubled from <2 years for projects built in 2000-2007 to over 4 years for those built in 2018-2024. • Ultimately, most of this proposed capacity will not be built. Only 13% of capacity that submitted interconnection requests from 2000-2019 had reached commercial operations by the end of 2024; 77% of that capacity had been withdrawn and 10% was still active. • FERC Order 2023 and various other reforms are being implemented. These are important measures to reduce interconnection bottlenecks and enhance grid system reliability, but it is too early to measure and assess their full impact. • New additions for the 2025 edition include: (a) additional detail on data processing and gaps; (b) updates on interconnection reforms; (c) new analysis on interconnection agreements, and more.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Overview of Inverter-based Resource Interconnection Standards

For the past century, electric power systems have primarily been bulk power systems consisting of generation, transmission, and distribution networks. Now the rapid expansion of distributed renewable power sources (RESs) and the shift from large, conventional synchronous machine resources to smaller-sized resources with diverse generation characteristics become the most significant change in modern power systems. With the increasing penetration of RESs, which are inverter-based resources (IBRs), it is important to develop interconnection standards that define performance and capability criteria for these IBRs. This is necessary to ensure the stable and reliable operation of power systems. This report summarizes the standards for IBRs interconnection in North America.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Radio Frequency Power Load and Associated Method

A radio frequency power load and associated method. A radio frequency power load apparatus may include a container with an ionized fluid therein. The apparatus may include one conductor immersed in a fluid and another conductor electrically connected to the container. A radio frequency transmission system may include a radio frequency transmitter, a radio frequency amplifier connected to the transmitter and a radio frequency power load apparatus connected to the amplifier. The apparatus may include a fluid having an ion source therein, one conductor immersed in a fluid, and another conductor electrically connected to the container. A method of dissipating power generated by a radio frequency transmission system may include constructing a waveguide with ionized fluid in a container and connecting the waveguide to an amplifier of the transmission system.

Srinivasan, V. Karthik↗

Tribal Engagement in Transmission Planning

The purpose of this white paper is to provide Tribes with information that (a) helps assess whether transmission access is important for their energy goals, and (b) provides guidance on how to engage in transmission planning, if and when doing so would help the Tribe achieve its energy goals. DOE's Office of Indian Energy notes that "Indian Country contains vast untapped energy resources" (OIE 2023). Individual tribes express a wide array of energy needs and goals, ranging from simple access to basic electricity service and energy efficiency tools, to the development of utility-scale generating plants. Access to transmission is a key part of this multifaceted tribal energy picture. About 2.3 percent of the nation's transmission miles are on tribal lands (OIE 2023). Even within that slice, however, circumstances vary widely. Much of that transmission is for local network delivery (138kV or less). There are some large-capacity 500kV lines, but in many cases the Tribe has limited access to them even when they run across the reservation. Some of the Tribes with the largest land area have little transmission, and some such as Navajo Nation and Hopi Tribe have many homes with no access to electricity. This white paper begins with a high-level summary of transmission issues that can affect a Tribe's energy goals. The discussion includes findings from major transmission-related studies, including the 2023 National Transmission Needs Study (GDO 2023). It then discusses strategies that could help a Tribe safeguard its interests when those interests intersect transmission infrastructure planning.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Frequency Recovery in Power Grids Using High-Performance Computing

Maintaining electric power system stability is paramount, especially in extreme contingencies involving unexpected outages of multiple generators or transmission lines that are typical during severe weather events. Such outages often lead to large supply-demand mismatches followed by subsequent system frequency deviations from their nominal value. The extent of frequency deviations is an important metric of system resilience, and its timely mitigation is a central goal of power system operation and control. This paper develops a novel nonlinear model predictive control (NMPC) method to minimize frequency deviations when the grid is affected by an unforeseen loss of multiple components. Our method is based on a novel multi-period alternating current optimal power flow (ACOPF) formulation that accurately models both nonlinear electric power flow physics and the primary and secondary frequency response of generator control mechanisms. We develop a distributed parallel Julia package for solving the large-scale nonlinear optimization problems that result from our NMPC method and thereby address realistic test instances on existing high-performance computing architectures. Our method demonstrates superior performance in terms of frequency recovery over existing industry practices, where generator levels are set based on the solution of single-period classical ACOPF models.

nonlinear model predictive control↗

A two-stage service restoration method for electric power distribution systems

Improving the reliability of power distribution systems is critically important for both utilities and customers. This calls for an efficient service restoration module within a distribution management system to support the implementation of self-healing smart grid networks. Although the emerging smart grid technologies, including distributed generators (DGs) and remote-controlled switches, enhance the self-healing capability and allow faster recovery, they still pose additional complexity to the service restoration problem, especially under cold load pickup (CLPU) conditions. Herein, a novel two-stage restoration framework is proposed to generate a restoration solutions with a sequence of control actions. The first stage generates a restoration plan that supports both the traditional service restoration using feeder reconfiguration and the grid-forming DG-assisted intentional islanding methods. The second stage generates an optimal sequence of switching operations to bring the outaged system quickly to the final restored configuration. The problem is formulated as a mixed-integer linear program that incorporates system connectivity, operating constraints, and the CLPU models. It is demonstrated that on using a multi-feeder test case, the proposed framework is effective in utilizing all available resources to quickly restore the service and generate an optimal sequence of switching actions to be used by the operator to reach the desired optimal configuration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Effects of Deep Reductions in Energy Storage Costs on Highly Reliable Wind and Solar Electricity Systems.

We use 36 years (1980-2015) of hourly weather data over the contiguous United States (CONUS) to assess the impact of low-cost energy storage on highly reliable electricity systems that use only variable renewable energy (VRE; wind and solar photovoltaics). Even assuming perfect transmission of wind and solar generation aggregated over CONUS, energy storage costs would need to decrease several hundred-fold from current costs (to ~$1/kWh) in fully VRE electricity systems to yield highly reliable electricity without extensive curtailment of VRE generation. The role of energy storage changes from high-cost storage competing with curtailment to fill short-term gaps between VRE generation and hourly demand to near-free storage serving as seasonal storage for VRE resources. Energy storage faces "double penalties" in VRE/storage systems: with increasing capacity, (1) the additional storage is used less frequently and (2) hourly electricity costs would become less volatile, thus reducing price arbitrage opportunities for the additional storage.

14 SOLAR ENERGY↗

Guest Editorial: Control interactions in power electronic converter dominated power systems

The modern power systems have undergone significant transformations at the generation, transmission, distribution, and utilization levels due to the remarkable advancements in power electronic converter technology. Power electronic converters are now prevalent in various applications, including wind turbine converters, photovoltaic inverters, flexible AC transmission systems (FACTS) and high-voltage DC (HVDC) converters, distributed generators, microgrids, and electric vehicles. The widespread adoption of power electronic converters has revolutionized the power system by providing fast and flexible controllability. However, their unique characteristics, such as fast response, multi-time scale dynamics, reconfigurable control, and varying sizes and capacities, have introduced new stability challenges, fundamentally altering the dynamics of modern power systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Aligning Electric Vehicle Customer Charging with Grid Needs

This talk to the National Association of Regulatory Utility Commissioners (NARUC) focuses on "Aligning Electric Vehicle Customer Charging with Grid Needs" to highlight the opportunities associated with managed electric vehicle charging and its value for consumers and the power system. Electric vehicles (EVs) are experiencing a rapid rise in popularity and adoption, and growing EV adoption offers an opportunity to increase electricity demand. With expected widespread EV adoption, supporting charging will require investments in generation, transmission, and distribution systems. Uncoordinated charging of EVs will lead to increased system peak load, possibly exceeding the maximum power that can be supported by distribution systems and generally increasing power system stress. However, vehicles are underutilized assets parked ~96% of the time: managed EV charging can satisfy mobility needs while also supporting the grid. EVs are not a burden for the grid, but a resource: The demand-side flexibility provided by managed EV charging offers significant potential benefits for the grid over multiple timescales and applications., especially for high-renewable systems. Managed charging can support power system planning and operations during normal and extreme conditions, benefitting EV owners and other electricity consumers. Managed charging is shown to consistently provide hundreds of dollars in cost savings per EV each year.

ADVANCED PROPULSION SYSTEMS↗

Cooperative Transmission Expansion Planning Experiment Data and Results

GO WEST is an open-source power grid modeling framework for U.S. Western Interconnection, which allows users to tailor the model depending on their research study and science questions. It covers 28 balancing authorities (BA) and 12 states in U.S. Western Interconnection. GO WEST allows users to select different number of nodes and come up with a simplified network by utilizing 10,000 nodal topology of U.S. Western Interconnection created by Texas A&M University. Users can try and select different number of nodes, mathematical formulations (linear programming vs. mixed-integer linear programming), transmission line limit scaling factors, and hurdle rate scaling factors. GO WEST offers a unit commitment and economic dispatch (UC/ED) module to simulate grid operations on an hourly scale. In this sense, users can calibrate and validate their model versions by comparing model outputs to historical datasets. TEP is an open-source transmission capacity expansion model, built on GO WEST framework. It utilizes linear programming to optimize transmission capacity addition investment on existing lines within GO WEST framework. In this sense, TEP model only increases the thermal capacity of existing transmission lines and does not add new lines to the system, which leaves the topology preserved. TEP minimizes the total cost of the system which comprises the operational cost of satisfying electricity demand (i.e., generation cost), cost of loss of load (i.e., unserved energy), cost of power flow, and cost of new transmission capacity additions (i.e., investment cost). In order to use TEP model, users need to create scenarios with GO WEST framework. In this analysis, outputs from several models are used to create future inputs to GO WEST and TEP models, including GCAM-USA, TELL, CERF and reV. This dataset includes experiment inputs and outputs from three different transmission expansion scenarios (cooperative, intermediate, and individual) for 2019 and 2059. For 2019, a base scenario to illustrate the default (i.e., historical) power grid operations is also included. This study utilizes rcp45hotter_ssp3 scenario from a previous version of GCAM-USA simulations. Sources of the shapefiles in supplementary data are HIFLD Open and U.S. Energy Atlas. Please see the README file for a detailed description of the main and supplementary data.

Capacity Expansion Model↗

Cyber-Physical Event Emulation-Based Transmission-and-Distribution Co-Simulation for Situational Awareness of Grid Anomalies (SAGA)

Energy management of transmission and distribution networks (T&D) is becoming more challenging with the accelerated adoption of distributed energy resources (DERs)-such as distributed photovoltaic generation and battery energy storage systems (BESS)-on the electric grid. To better analyze the impacts of DERs on both transmission and distribution systems, a comprehensive T&D co-simulation platform is developed. Further, with DERs more actively participating in system operation-e.g., by providing real-time grid services-their cyber vulnerability needs to be better understood to maintain system reliability. This paper discusses a cyber-physical events emulation-based T&D co-simulation platform to perform comprehensive cyber events emulations, physical simulation, and analysis of interdependent impacts. Results from the case studies-which show how cyber events on a synthetic distribution network can impact operations on the transmission and distribution network-validate that the proposed T&D cosimulation platform can perform cyber-physical events emulation and produce response in near realtime; therefore, with extensive simulation using the proposed co-simulation platform, the system operators can accumulate adequate training data for system situational awareness of grid anomalies.

anomalies detection↗

Future evolution of virtual water trading in the United States electricity sector

Abstract Future transformations in the electricity sector could entail major shifts in power sector technology mixes and electricity trade, with consequences for the trading of virtual water. Previous virtual water trade studies largely focus on historical timeframes. We explore, for the first time, future—through 2050—virtual water trade driven by electricity trade under a range of future electricity sector transformation scenarios using the United States as an example. Under a business-as-usual scenario, virtual water trading in 2050 decreases by 3% relative to 2015 levels. By contrast, virtual water trading increases respectively by 3%, 26%, and 32%, in scenarios characterized by higher socioeconomic growth, higher potential for transmission expansion, and low-carbon transitions. These increases are driven by electricity generation expansion in the western U.S., resulting in higher virtual water trade to the east. In addition, we find that as electricity generation shifts west, an increased amount of nonrenewable groundwater will be consumed to generate electricity that is supplied to the east. Independent of scenario, the US electricity grid largely relies on virtual water exports from only a few states. Our study highlights the need for integrated and national strategies to manage the water and electric systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Evaluating grid stress and reliability in future electricity grids across a range of demand, generation mix, and weather trends

The reliability of power grids in the future will depend on how system planners account for the integration of new technologies, extreme weather events, and uncertainties in demand growth from increased electrification and data centers. This study introduces an open-source, multisectoral, multiscale modeling framework that projects grid stress and reliability trends between 2020 and 2055 in the Western Interconnection of the United States. The framework integrates global to national energy-water-land dynamics with power plant siting and hourly grid operations modeling. We analyze future wholesale electricity price shocks and unserved energy events across eight scenarios spanning a range of population growth and economic change, generation mixes, and weather conditions. Our results show future grids with high percentage of non-renewable generation and strong economic growth are characterized by higher reliability and lower wholesale electricity prices than lower growth scenarios because of larger reliance on dispatchable generators and lower fossil fuel extraction costs. Scenarios with high percentage of renewable resources have lower median but more volatile wholesale electricity prices as well as more frequent and severe unserved energy events compared to scenarios relying more on dispatchable generators. These events occur because higher proportion of solar and wind energy causes net demand curves to deepen during midday (duck curves get progressively severe), exacerbating the challenge of meeting demand during summer evening peaks. This study suggests that robust and co-optimized transmission and energy storage planning could help maintain low wholesale electricity prices and high reliability levels in future electricity grids across uncertainties in generation mixes.

Electric grid reliability↗

Least-Cost Pathways for India's Electric Power Sector

The Government of India has a target of deploying 175 GW from renewable energy by 2022 and 40% of electricity capacity from renewable energy by 2030 and has indicated that ambitions for 2030 could be higher. Rapid changes in technology costs and performance could drive further deployment of wind and solar capacity beyond these policy targets. Increased deployment of variable renewable energy (VRE) raises new questions for power system planning regarding the optimal siting of generation capacity, trade-offs between generation and transmission infrastructure, and system flexibility needs. This study aims to evaluate least-cost pathways for India's electric power system over the period 2017-2047. Uniquely, this work considers an expanded planning horizon and range of scenarios not previously analyzed in national planning studies in India. The data collection and model design processes undertaken for this study provides a framework for recurring planning studies. This study finds anticipated changes in electricity demand and component costs can drive a significant shift in India's future electricity supply and how this system will be operated. In the Base scenario, the share of generation from VRE reaches 54% by 2047. Reducing the capital cost of wind has a larger impact on VRE penetration than reducing the capital cost of solar PV or battery storage. In the lowest wind cost scenario (40% capital cost decline by 2047 relative to the Base scenario), the penetration of VRE in the generation mix reaches 722%, exceeding the penetration levels achieved when the cost of battery storage or solar PV are reduced by an even greater 50%. In a future system with high penetrations of RE, capacity additions are driven by the coincidence of demand and RE generation rather than peak demand alone. This study finds the system could have surplus capacity during the peak demand months of July–September because this period corresponds to periods with high wind speeds and more wind generation available to meet peak demand. By contrast, new capacity is needed to meet demand during moderate demand months of October–November when output from wind plants falls more than 75% nationally compared to the previous two months. Finally, the success for gas for electricity production may depend on cost competitiveness rather than fuel availability. Increasing the amount of gas available for electricity production had no significant impact on the capacity or generation mix by 2047, as determined from a scenario that significantly increases fuel availability throughout the planning horizon. In fact, over 80% of new gas fuel available for the power sector remains unused. This suggests the high cost of gas plant operations relative to other technologies may constrain the expansion of gas generation in India more than fuel availability.

14 SOLAR ENERGY↗

Pathways for Tamil Nadu’s Electric Power Sector: 2020 - 2030

This report is part one of a two-part series that represents a year-long collaboration with the Tamil Nadu Generation and Distribution Corporation Limited (TANGEDCO) and Tamil Nadu Transmission Corporation Limited (TANTRANSCO) on power sector planning. This Pathways for Tamil Nadu’s Electric Power Sector 2020-2030 report outlines NREL’s work with TANGEDCO's electricity sector planning department to develop a model of the State power system and evaluate multiple scenarios of system evolution given resource constraints, costs of technologies, and power sector policies. A broad stakeholder group comprised of TANGEDCO leadership, developers, regulators, and researchers from within the power sector community in Tamil Nadu helped to guide the main objectives of the study and provided technical feedback to the research team. The outcomes of this effort include multiple pathways for power sector growth to 2030 and a robust model of Tamil Nadu's power system that can be used to continually analyze the impact of new policies, regulations, or system changes. The second report in this series will build on the bulk system analysis by focusing on the rapidly transforming distribution network in the State. The report will outline a framework developed by NREL and TANGEDCO's distribution utility to quickly and accurately analyze the impacts of integrating renewable energy onto Tamil Nadu's distribution system. Together these studies help to prepare Tamil Nadu for a rapidly transforming power system.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

High bandwidth magnetically isolated signal transmission circuit

Many current electronic systems incorporate expensive or sensitive electrical components. Because electrical energy is often generated or transmitted at high voltages, the power supplies to these electronic systems must be carefully designed. Power supply design must ensure that the electrical system being supplied with power is not exposed to excessive voltages or currents. In order to isolate power supplies from electrical equipment, many methods have been employed. These methods typically involve control systems or signal transfer methods. However, these methods are not always suitable because of their drawbacks. The present invention relates to transmitting information across an interface. More specifically, the present invention provides an apparatus for transmitting both AC and DC information across a high bandwidth magnetic interface with low distortion.

Repp, John Donald↗

Valuation of Hydrogen Technology on the Electric Grid Using Production Cost Modeling: Cooperative Research and Development Final Report, CRADA Number CRD-18-00736

This research project will estimate the value to the United States electric grid of deploying hydrogen technology (such as electrolyzers and hydrogen-fueled generation) under projected conditions of high renewable penetration. The analysis will advance the state of the art in systems-level cost-benefit analysis of hydrogen technology for the electric grid by incorporating production cost modeling results in the analysis. Large-scale grid simulation tools will be used to evaluate total system production cost and grid operation when hydrogen technology is deployed for applications such as energy storage and demand response. Scenarios will include one or more future grid mixes in the Western Interconnect (WI) with a high proportion of intermittent renewables. Electric Power Research Institute (EPRI) will work with four utility companies to refine scenarios. Results of the analysis will include comparing the net cost of hydrogen to other technologies for long duration storage, and of power-to-gas (P2G) scenarios including merchant hydrogen sale and hydrogen-fueled generation.

08 HYDROGEN↗