Search NASA⌕ Search

SEARCH · Search NASA

Results for “LLRF”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Mitigating Transition in the Fermilab Booster Using a Triple Phase Jump

The PIP-II project will significantly enhance neutrino production for DUNE, Fermilab’s flagship long-baseline neutrino oscillation experiment, by doubling the beam power delivered by the accelerator complex. To achieve this, the total charge injected from the new PIP-II linac into the Booster rapid cycling synchrotron (RCS) will increase from $4.5\times 10^{12}$ to $6.5\times 10^{12}$ protons per pulse. Simultaneously, the Booster’s ramp rate will rise from 15 to 20 Hz, while the injection energy will go from 400 MeV to 800 MeV. The Booster accelerates the beam to 8 GeV and crosses transition at $\gamma_t=5.45$. In current operations, no dedicated $\gamma_t$ jump system is employed; instead, longitudinal emittance growth is controlled via an active quadrupole-mode feedback system. Downstream, the Recycler Ring uses slip-stacking to accumulate beam and increase bunch intensity. However, this process imposes a constraint on the longitudinal emittance at Booster extraction, limiting it to 0.1 eV-s (95\%) to avoid excessive particle loss. Because collective effects scale with intensity, additional measures to mitigate transition crossing may be required to stay below this limit. One potential approach is the so-called triple phase-jump technique. While the method has known limitations, it offers some advantages: it can be implemented using the existing digital low-level RF (LLRF) system, requires no additional magnets or pulsed power supplies, and remains compatible with quadrupole-mode feedback.

Ostiguy, J.-F. [Fermilab] (ORCID:0000000290883681)↗

High Precision RF Control for SRF Cavities in LCLS-II

The unique properties of SRF cavities enable a new generation of X-ray light sources in XFEL and LCLS-II. The LCLS-II design calls for 280 L-band cavities to be operated in CW mode with a Q_{L} of 4x10⁷, using Single-Source Single-Cavity control. The target RF field stability is 0.01% and 0.01 degree for the band above 1 Hz. Hardware and software implementing a digital LLRF system has been constructed by a four-lab collaboration to minimize known contributors to cavity RF field fluctuation. Efforts include careful attachment to the phase reference line, and minimizing the effects of RF crosstalk by placing forward and reverse signals in chassis separate from the cavity measurement. A low-noise receiver/digitizer section will allow feedback to operate with high proportional gain without excessive noise being sent to the drive amplifier. Test results will show behavior on prototype cryomodules at FNAL and JLab, ahead of the 2018 final accelerator installation.

43 PARTICLE ACCELERATORS↗

SRF cavity testing using a FPGA Self Excited Loop

Various authors have previously studied the theory and practice of cavity testing, notably an extensive treatment by Powers [1] and Padamsee [2]. The advent of the digital Low Level RF (LLRF) electronics based on Field Programmable Logic Arrays (FPGA) provides various improvements over the rather complex systems used in the past as well as enabling new measurement techniques.In this document we reintroduce a technique that seems to have fallen out of practice in recent times, that is obtaining the coupling constant β through measurements from just one port, the reflected power port, of the directional coupler placed in front of the cavity.

43 PARTICLE ACCELERATORS↗

SRF Cavity Testing Using a FPGA Self Excited Loop

This document provides a detailed description of procedures for very-high precision calibration and testing of superconducting RF cavities using digital Low-Level RF (LLRF) electronics based on Field Programmable Gate Arrays (FPGA). The use of a Self-Excited Loop with an innovative procedure for fast turn-on allows the measurement of the forward, reflected and transmitted power from a single port of the directional coupler in front of the cavity, thus eliminating certain measurement errors. Various procedures for measuring the quality factor as a function of cavity fields are described, including a single RF pulse technique. Errors are estimated for the measurements.

43 PARTICLE ACCELERATORS↗

Beam Synchronous for the Rest of Us!

Fermilab’s Tevatron Clock (TCLK) infrastructure has been an integral part of the accelerator control network since the 1980’s. This 10MHz Manchester encoded protocol has enabled flexible, real-time event distribution for thousands of devices connected to the timing network with a high degree of reliability. Forthcoming upgrades to the Fermilab complex (PIP-II, LBNF, ACORN) necessitate higher levels of precision to maintain inter-bunch timing for Instrumentation and Control purposes. This presents as an opportunity to refine the event distribution protocol for tighter synchronization between machines, experiments, and eventually far-site operations. This paper outlines a method by which beam-synchronous events may be distributed through asynchronous serial protocols via integration with local LLRF and global PPS reference signals. This method is ideal for synchrotron machines with aggressive frequency sweeps (such as Fermilab's 38~53MHz Booster) and allows for precision timing to be maintained across machines without specialized hardware.

43 PARTICLE ACCELERATORS↗

Detection of high-frequency gravitational waves using SRF cavities

Today, apart from some isolated R\&D efforts, there are no GW experiments, yet which explore a large part of the vast frequency range above the LIGO/Virgo band. It is planned to establish an experiment at DESY and Fermilab to search for high-frequency GWs in the frequency range of 10\,kHz to 100\,MHz. The basic idea is to use superconducting radiofrequency (SRF) cavities to detect tiny harmonic deformations induced by GWs which change the boundary conditions of the oscillating electromagnetic field. This paper summarizes the challenging environmental boundary requirements, and the R\&D to operate a cavity using a LLRF system which pushes beyond state-of-the-art accuracy and resolutions and a seismic noise mitigated cryostat at 1.8\,K. The focus of this paper is the warm and cold commissioning of a prototype cavity, built 20 years ago during the MAGO collaboration, and its first measurement in our collaborative research project.

Giaccone, Bianca [Fermilab]↗

Mitigating Transition in the Fermilab Booster Using a Triple Phase Jump

The PIP-II project will significantly enhance neutrino production for DUNE, Fermilab s flagship long-baseline neutrino oscillation experiment, by doubling the beam power delivered by the accelerator complex. To achieve this, the total charge injected from the new PIP-II linac into the Booster rapid cycling synchrotron (RCS) will increase from $4.5\times 10^{12}$ to $6.5\times 10^{12}$ protons per pulse. Simultaneously, the Booster s ramp rate will rise from 15 to 20 Hz, while the injection energy will go from 400 MeV to 800 MeV. The Booster accelerates the beam to 8 GeV and crosses transition at $\gamma_t=5.45$. In current operations, no dedicated $\gamma_t$ jump system is employed; instead, longitudinal emittance growth is controlled via an active quadrupole-mode feedback system. Downstream, the Recycler Ring uses slip-stacking to accumulate beam and increase bunch intensity. However, this process imposes a constraint on the longitudinal emittance at Booster extraction, limiting it to 0.1 eV-s (95\%) to avoid excessive particle loss. Because collective effects scale with intensity, additional measures to mitigate transition crossing may be required to stay below this limit. One potential approach is the so-called triple phase-jump technique. While the method has known limitations, it offers some advantages: it can be implemented using the existing digital low-level RF (LLRF) system, requires no additional magnets or pulsed power supplies, and remains compatible with quadrupole-mode feedback.

Ostiguy, Jean-Francois [Fermilab] (ORCID:000000029↗

LHC RF System Time-Domain Simulation

Non-linear time-domain simulations have been developed for the Positron-Electron Project (PEP-II) and the Large Hadron Collider (LHC). These simulations capture the dynamic behavior of the RF station-beam interaction and are structured to reproduce the technical characteristics of the system (noise contributions, non-linear elements, and more). As such, they provide useful results and insight for the development and design of future LLRF feedback systems. They are also a valuable tool for the study of diverse longitudinal beam dynamics effects such as coupled-bunch impedance driven instabilities and single bunch longitudinal emittance growth. Results from these studies and related measurements from PEP-II and LHC have been presented in multiple places. This report presents an example of the time-domain simulation implementation for the LHC.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Status and Plans for an SRF Accelerator Test Facility at Fermilab

A superconducting RF accelerator test facility is currently under construction at Fermilab. The accelerator will consist of an electron gun, 40 MeV injector, beam acceleration section consisting of 3 TTF-type or ILC-type cryomodules, and multiple downstream beam lines for testing diagnostics and performing beam experiments. With 3 cryomodules installed this facility will initially be capable of generating an 810 MeV electron beam with ILC beam intensity. The facility can accommodate up to 6 cryomodules for a total beam energy of 1.5 GeV. This facility will be used to test SRF cryomodules under high intensity beam conditions, RF power equipment, instrumentation, and LLRF and controls systems for future SRF accelerators such as the ILC and Project-X. This paper describes the current status and overall plans for this facility.

43 PARTICLE ACCELERATORS↗

X-Band Crab Cavities for the CLIC Beam Delivery System

The CLIC machine incorporates a 20 mrad crossing angle at the IP to aid the extraction of spent beams. In order to recover the luminosity lost through the crossing angle a crab cavity is proposed to rotate the bunches prior to collision. The crab cavity is chosen to have the same frequency as the main linac (11.9942 GHz) as a compromise between size, phase stability requirements and beam loading. It is proposed to use a HE11 mode travelling wave structure as the CLIC crab cavity in order to minimise beam loading and mode separation. The position of the crab cavity close to the final focus enhances the effect of transverse wake-fields so effective wake-field damping is required. A damped detuned structure is proposed to suppress and de-cohere the wake-field hence reducing their effect. Design considerations for the CLIC crab cavity will be discussed as well as the proposed high power testing of these structures at SLAC. Design of a crab cavity for CLIC is underway at the Cockcroft Institute in collaboration with SLAC. This effort draws on a large degree of synergy with the ILC crab cavity developed at the Cockcroft Institute and other deflecting structure development at SLAC. A study of phase and amplitude variations in the cavity suggests that the tolerances are very tight and require a 'beyond state of the art' LLRF control system. A study of cavity geometry and its effect on the cavity fields has been performed using Microwave studio. This study has suggested that for our cavity an iris radius between 4-5 mm is optimum with an iris thickness of 2-3 mm based on group velocity and peak fields. A study of the cavity wakefields show that the single bunch wakes are unlikely to be a problem but the short bunch spacing may cause the multi-bunch wakefields to be an issue. This will require some of the modes to be damped strongly so that the wake is damped significantly before any following bunch arrives. Various methods of damping have been investigated and suggest that waveguide damping in the cells should provide sufficient damping in the vertical plane, which is the most sensitive.

43 PARTICLE ACCELERATORS↗

Droop Compensation for the High Voltage Converter Modulators at the Spallation Neutron Source.

The Spallation Neutron Source (SNS) has been in operation since 2006 and routinely operates at 1 MW of beam power. At 1 MW, the High Voltage Converter Modulators (HVCMs) are delivering 8-11 MW pulsed power to the Klystrons for up to 1185 us at 60 Hz. The pulsed output of the modulator has a substantial voltage droop operating in open-loop mode. Achieving 1.4 MW operations require an increase in the output pulse width of the HVCM, resulting in loss of LLRF control margin due to modulator voltage reduction at the end of the pulse. Initially, the HVCM was designed with a pulse width modulation scheme for droop compensation but early operations at full duty revealed this technique unreliable. Increasing the output voltage of the modulator would likely compromise system reliability. This paper proposes the use of alternate modulation schemes to address the voltage droop. The effect of frequency modulation and phase modulation on voltage droop is studied. Experimental results will also be presented.

43 PARTICLE ACCELERATORS↗

Operational Results of Pulse Shaping Techniques for the High Voltage Convertor Modulator

The High Voltage Converter Modulators (HVCMs) are used to power the RF klystrons used throughout the accelerator systems at Spallation Neutron Source (SNS). The output voltage of the HVCM has significant droop and ripple which, combined with low level RF (LLRF) system limitations, affect performance and efficiency of accelerator cavities. In conjunction with the progress in development of the new HVCM controller, different pulse modulation techniques were implemented and studied on the test modulator. This paper discusses the results of implementation of frequency modulation and phase modulation on output voltage. Operational data, including full average power operation, of test modulator is also discussed. Future plans for the new modulation scheme will be presented.

Patel, Gunjan P↗

Operational experience with CW high gradient and high QL cryomodules

The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of ten new 100 MV cryomodules (80 cavities). The superconducting RF cavities are designed to operate CW at an accelerating gradient of 19.3 MV/m with a QL of 3×107. The RF system employs single cavity control using new digital LLRF controls and 13 kW klystrons. Recently, all of the new cryomodules and associated RF hardware and software have been commissioned and operated in the CEBAF accelerator. Electrons at linac currents up to 10 ?A have been successfully accelerated and used for nuclear physics experiments. This paper reports on the commissioning and operation of the cryomodules and RF system.

Hovater, J. Curt↗

Commissioning the JLab LERF Cryomodule Test Facility

The JLab Low Energy Recirculating Facility, LERF, has been modified to support concurrent testing of two LCLS-II cryomodules. The cryomodules are installed in a similar fashion as they would be in the L1 section of the LCLS-II linac, including the floor slope and using all of the LCLS-II hardware and controls for cryomodule cryogenics, vacuum, and RF (SSA and LLRF). From the start, it was intended to use LCLS-II electronics and EPICS software controls for cryomodule testing. In affect the LERF test facility becomes the first opportunity to commission and operate the LCLS-II LINAC hardware and software controls. Support for specific cryomodule high level test applications like Q0 and HOMs measurements, are being developed from the basic cryomodule control suite. To support the testing, 2 K He is supplied from the CEBAF south linac cryogenic system, where care must be taken when using the LERF test facility to not upset the CEBAF cryogenics plant. This paper discusses the commissioning of the hardware and software development for testing the first two LCLS-II cryomodules.

Hovater, C.↗

Recent Improvements in the Beam Capture at Fermilab Booster for High Intensity Operation

The Fermilab Booster uses multi-turn beam injection with all its cavities phased such that beam sees a net zero RF voltage even when each station is at the same maxi-mum voltage. During beam capture the RF voltage is increased slowly by using its paraphase system. At the end of the capture the feedback is turned on for beam acceleration. It is vital for present operations as well as during the PIP-II era that both the HLRF and LLRF systems provide the proper intended phase and RF voltage to preserve the longitudinal emittance from injection to extraction. In this paper, we describe the original architecture of the cavity phase distribution, our recent beam-based RF phase measurements, observed significant deviation in the relative phases between cavities and correction effort. Results from the improved capture for high intensity beam are also presented.

43 PARTICLE ACCELERATORS↗

Status and Plans for a SRF Accelerator Test Faciliy at Fermilab

A superconducting RF accelerator test facility is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerator will consist of an electron gun, injector, beam acceleration secti on consisting of 3 TTF-type or ILC-type cryomodules, multiple downstream beamlines for testing diagnostics and conducting various beam tests, and a high power beam dump. When completed, it is envisioned that this facility will initially be capable of gene rating a 810 MeV electron beam with ILC beam intensity. Expansion plans of the facility are underway that will provide the capability to upgrade the accelerator to a total beam energy of 1.5 GeV. In addition to testing accelerator components, this facilit y will be used to test RF power equipment, instrumentation, LLRF and controls systems for future SRF accelerators such as the ILC and Project-X. This paper describes the current status and overall plans for this facility.

43 PARTICLE ACCELERATORS↗

Cavity Control Algorithms

A LLRF system typically incorporates either a heterodyne or direct sampling technique, followed by fast ADCs, then an FPGA and finally a transmitting DAC. An ultra low jitter clock system (sub-picoseconds) is required for fast sampling ADCs/DACs to preserve necessary signal to noise ratio. As a result we have universal hardware able to accommodate a variety of firmware for the specific application. The cavity control algorithm, greatly released from hardware constraints, can be developed much faster for very specific and demanding requirements. Based on the type of the accelerator (Pulsed, CW) and nature of the cavity field disturbances ( Lorentz Forces, microphonics, helium drift, temperature drift, beam load etc.) one can select a suitable controller. A generic PID feedback mechanism may be the first and easiest choice for most cases, while Kalman filtering or Adaptive control require more involved system modeling, and extra computational effort. A pulse system usually requires an additional feed forward mechanism while for a CW machine an SEL (Self Excited Loop) can be an excellent approach. Selecting the correct gains for effective control can be challenging and it depends on the beam energy spread requirements, system stability and control system scheme ( I&Q, Amplitude & Phase, SEL). Finally, the computational capability of the FPGA allows it to incorporate digital signal processing (for instance CIC(Cascaded Integrator-Comb filter), tunable IIR) as well as CORDIC ( COordinate Rotation DIgital Computer) to calculate trigonometric quantities. In this talk, a summary of popular algorithms is presented along with an example of the Jefferson Lab 12 GeV cavity field control system.

Plawski, Tomasz↗

Status of the CEBAF Energy Upgrade RF Control System

To support the CEBAF energy upgrade from 6 GeV to 12 GeV, the RF control system is being modernized to control the high gradient high QL superconducting cavities. 80 new LLRF systems are being built to support the upgrade. The new system incorporates a heterodyne transceiver along with I&Q sampling to measure and control magnitude and phase. A low-cost Altera FPGA is used to digitally implement the cavity control algorithms. One of the features of the system is a digital self excited loop to track the cavity over large Lorentz detuning (800 Hz) during turn on. The system has successfully completed preliminary development and is now moving into the production stage of the project. This paper discusses the design, modeling, testing and production of the new RF control system and associated peripheral systems (cavity interlocks, and resonance control).

Hovater, James↗