Search NASA⌕ Search

SEARCH · Search NASA

Results for “corporate responsibility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

To Boldly Go: America's Next Era in Space. Sustaining Life on the Earth

Dr. France Cordova, NASA's Chief Scientist, opened this, the sixth seminar in the Administrator's Seminar Series, by introducing NASA Administrator Daniel S. Goldin. Mr Goldin welcomed the attendees and set the stage for Dr. Cordova's introduction of the first speaker, Dr. Robert Kates of Brown University. Dr. Kates primary concerns are global environmental changes, world hunger, and the size of the population. Human changes, he said, rival the changes of nature. Changes in the size of world population affect the need for more agricultural products, therefore more land for growing food, which leads to deforestation, which affects rainfall, and therefore the water supply which is in increased demand. Human ingenuity can reduce some shortages but generally doesn't keep up with increased demand for life-sustaining essentials. These problems require the concern of intergovernmental organizations, treaties and activities, as well as transnational corporations, and non-governmental and private, volunteer organizations. Next Dr. Diana Liverman of Pennsylvania State University spoke on human interactions regarding climate and society. She considered the effect of changes in land use on climate, using Mexico as an example. Mexicans changed from raising much wheat to raising more fruits and vegetables. This was in response to the demands of the market. The results were more industry, population growth, greater income, drought (because the new crops required more water), and conflicts over water supplies. Dr. Charles Kennel of the Office of Mission to Planet Earth joined Dr.s Cordova, Kates, and Liverman for the question and answer session that followed.

Source record↗

Novel Air System for 300 kW Heavy Duty Fuel Cell

Hydrogen fuel cell powered vehicles for heavy duty trucks is a potential path for reducing heavy duty vehicle emissions in the future. The air handling system delivers the proper amount of air (oxygen) to react with fuel (hydrogen) in the fuel cell to produce power. Air delivery requires significant power and is the largest parasitic loss for a 300 kW fuel cell. Today’s systems use an electric motor to power an air compressor that supplies oxygen to the fuel cell stack. In addition to parasitic power loss, hydrogen fuel cell systems often have reliability issues associated with the air handling system. Reliability is of significant concern for heavy duty applications (especially long-haul applications). This project aims to improve both the electrical power consumption and reliability of hydrogen fuel cell air handling systems to meet the needs of heavy duty on-highway vehicle applications. The air handling is provided by a twin vortices series (TVS) compressor in addition to adding a TVS expander to recover waste heat energy back into the compressor. The final configuration includes a 600 V, 39 kW motor connected with a single shaft to the compressor and expander. This configuration reduced the total electrical power consumption from 48.6 kW to 37 kW at full load, 27 kW to 9 kW at half load and 0.44 kW to 0.22 kW at idle. The response time requirement was to be less than 2 seconds while the final demonstration yielded 0.62 sec. The study includes additional technologies including water dosing into the compressor, a recuperator and elimination of the intercooler.

Reich, Evan [Eaton Corporation, Southfield, MI (Un↗

Fault tree applications within the safety program of Idaho Nuclear Corporation

Computerized fault tree analyses are used to obtain both qualitative and quantitative information about the safety and reliability of an electrical control system that shuts the reactor down when certain safety criteria are exceeded, in the design of a nuclear plant protection system, and in an investigation of a backup emergency system for reactor shutdown. The fault tree yields the modes by which the system failure or accident will occur, the most critical failure or accident causing areas, detailed failure probabilities, and the response of safety or reliability to design modifications and maintenance schemes.

W. E. Vesely↗

A generalized software executive for multidisciplinary computational structural dynamics

The objective of this presentation is to introduce the attendees to the DYSCO program. The emphasis will be on the features which make it multidisciplinary. DYSCO is a very general and versatile software program which couples and solves dynamic systems. It was initiated in the late 1970's in response to a helicopter analysis requirement. The system development, however, resulted in an executive which was completely separated from any particular area of technology, except that of second order ordinary differential equations. During the course of its development, it was funded by the Army Aviation Applied Technology Directorate, the Air Force Wright Aeronautical Laboratories, and by the Kaman Aerospace Corporation. It is completely written in FORTRAN and is operational on IBM and VAX computers.

Berman, Alex↗

Integrated support structure for GASCAN 2

The focus of the Worcester Polytechnic Institute (WPI) Advanced Space Design Program was the preliminary design of the Integrated Support Structure for GASCAN II, a Get Away Special canister donated by the MITRE Corporation. Two teams of three students each worked on the support structure. There was a structural design team and a thermal design team. The structure will carry three experiments also undergoing preliminary design this year, the mu-gravity Ignition Experiment, the Rotational Flow in Low Gravity Experiment, and the Ionospheric Properties and Propagation Experiment. The structural design team was responsible for the layout of the GASCAN and the preliminary design of the structure itself. They produced the physical interface specifications defining the baseline weights and volumes for the equipment and produced layout drawings of the system. The team produced static and modal finite element analysis of the structure using ANSYS. The thermal design team was responsible for the power and timing requirements of the payload and for the identification and preliminary analysis of potential thermal problems. The team produced the power, timing, and energy interface specifications and assisted in the development of the specification of the battery pack. The thermal parameters of each experiment were cataloged and the experiments were subjected to worst case heat transfer scenarios.

Source record↗

Investing American Recovery and Reinvestment Act Funds to Advance Capability, Reliability, and Performance in NASA Wind Tunnels

The National Aeronautics and Space Administration's (NASA) Aeronautics Test Program (ATP) is implementing five significant ground-based test facility projects across the nation with funding provided by the American Recovery and Reinvestment Act (ARRA). The projects were selected as the best candidates within the constraints of the ARRA and the strategic plan of ATP. They are a combination of much-needed large scale maintenance, reliability, and system upgrades plus creating new test beds for upcoming research programs. The projects are: 1.) Re-activation of a large compressor to provide a second source for compressed air and vacuum to the Unitary Plan Wind Tunnel at the Ames Research Center (ARC) 2.) Addition of high-altitude ice crystal generation at the Glenn Research Center Propulsion Systems Laboratory Test Cell 3, 3.) New refrigeration system and tunnel heat exchanger for the Icing Research Tunnel at the Glenn Research Center, 4.) Technical viability improvements for the National Transonic Facility at the Langley Research Center, and 5.) Modifications to conduct Environmentally Responsible Aviation and Rotorcraft research at the 14 x 22 Subsonic Tunnel at Langley Research Center. The selection rationale, problem statement, and technical solution summary for each project is given here. The benefits and challenges of the ARRA funded projects are discussed. Indirectly, this opportunity provides the advantages of developing experience in NASA's workforce in large projects and maintaining corporate knowledge in that very unique capability. It is envisioned that improved facilities will attract a larger user base and capabilities that are needed for current and future research efforts will offer revenue growth and future operations stability. Several of the chosen projects will maximize wind tunnel reliability and maintainability by using newer, proven technologies in place of older and obsolete equipment and processes. The projects will meet NASA's goal of integrating more efficient, environmentally safer, and less energy consuming hardware and processes into existing tunnel systems. These include Environmental Protection Agency-approved refrigerants, energy efficient motors, and faster, flexible tunnel data systems.

Sydnor, Goerge H.↗

Transmission Operator Workflows for Real-Time Reliability Studies: A Review of Control Room Practices and Naturalistic Decision Making

This report provides an overview of real-time reliability study tools and their use by power system operators in the control room environment. After introducing some of the nuances of the control room environment and the differences in perspectives between power system engineers and operators, the roles and responsibilities of key entities involved in RTCA workflows are introduced. These are specifically the transmission system operator (TOP) and reliability coordinator (RC), which are required to run tools such as real-time contingency analysis (RTCA) as part of a real-time reliability assessment every 30 minutes, as dictated by a series of standards issued by the North American Electric Reliability Corporation (NERC). The process by which power systems operators operate the grid is discussed in terms of naturalistic decision making (NDM) and the recognition-primed decision-making (RPD) model. This cognitive model describe how experts working in high-risk, high-stress environments make safety-critical decisions under uncertainty and time pressure. For power system operators, the mental simulations involved in the traditional RPD model are supplemented by physics-based simulations using numerical tools, such as RTCA, to improve situational awareness and effectiveness of control actions. Next, a generic workflow is introduced to describe operator decision making for running RTCA tools and responding to system violations on a pre-contingent basis. The types of analysis performed and control actions chosen by power system operators are described in detail. The overall high-level workflow is then expanded in subsequent sections, with special attention given to high-voltage violations, low-voltage violations, and thermal overloads. Each type of violation is described in detail, with explanations of common causes, impacts on equipment and customers, and mitigation strategies. An additional workflow diagram is provided for each type of violation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Bat Smart Curtailment: Efficacy and Operational Testing

Curtailment, or blanket curtailment, is a leading method to mitigate the impacts to bats from operating wind turbines. Although this strategy results in considerable decreases in bat fatalities, it also results in decreased energy production. In 2019, Natural Power was awarded funding by the Department of Energy to assess the readiness of the informed smart curtailment technology, EchoSense (formerly referred to as Detection and Active Response Curtailment, [DARC]). The research undertaken by this project expands the understanding of alternative methods, known as smart curtailment, to maintain a reduction in bat fatalities while simultaneously recovering lost energy associated with blanket curtailment. The overall project was composed of three major tasks; Task 1 was focused on cybersecurity compliance of the EchoSense system in accordance with the North American Electric Reliability Corporation Critical Infrastructure Protection (“NERC CIP”) standards, Task 2 assessed the mechanical loads exerted on turbines when operating under a smart curtailment regime, and Task 3 assessed the efficacy of the EchoSense system at an operational wind farm. Regarding Task 1, an external review by the National Renewable Energy Laboratory determined that the EchoSense system did not create any new cybersecurity weaknesses and was compliant with the NERC CIP standards. As a result of this process, Natural Power developed some best practices (10.1) for wind- wildlife technology developers. In conjunction with the National Renewable Energy Laboratory, the results (10.2) of the loads testing demonstrated that the periodic curtailment and release of turbines by the EchoSense system did not have any detrimental impact on the mechanical components of a wind turbine (Task 2). During the late summer to fall of 2020 and 2021, Natural Power demonstrated that the use of the EchoSense smart curtailment system resulted in no significant difference in bat fatalities compared to blanket curtailment with cut-in speeds at 6.9 m/s (2020) and 5.0 m/s (2021) while resulting in a significant difference in decreased lost energy (Task 3). This translates to an average of 41% (2020) and 56% (2021) reduction in per turbine energy loss compared to blanket curtailment. The reduction in energy loss that would have been achieved by EchoSense curtailment compared to blanket curtailment, if applied across all 69 turbines, is roughly equivalent to having an additional turbine on site. These results are notable for finding a balance between the environmental impact of wind energy and the economic feasibility in energy production associated with mitigating that impact. https://www.naturalpower.com/us/expertise/service/engineering-operations/echosense

17 WIND ENERGY↗

Comparison of VIIRS Prelaunch RVS Among Independent Studies

The Visible Infrared Imaging Radiometer Suite (VIIRS) is a key sensor carried on the NPOESS (National Polar-orbiting Operational Environmental Satellite System), upgraded and developed recently from heritage instruments including AVHRR, OLS, MODIS, and SeaWiFS. It has on-board calibration components including a solar diffuser (SD) and a solar diffuser stability monitor (SDSM) for the reflective solar bands (RSB), a V-groove blackbody for the thermal emissive bands (TEB), and a space view (SV) port for background subtraction. These on-board calibrators are located at fixed scan angles. The VIIRS response versus scan angle (RVS) was characterized prelaunch in lab ambient conditions and will be used on-orbit to characterize the response for the all scan angles relative to the calibrator scan angle (SD for RSB and blackbody for TEB). Since the RVS is vitally important to the quality of calibrated radiance products, several independent studies were performed and their results were compared and validated. This document provides RVS results from three groups: the NPP Instrument Calibration Support Team (NICST), Raytheon, and the Aerospace Corporation. A comparison of the RVS results obtained using a 2nd order polynomial fit to measurement data is conducted for each band, detector, and half angle mirror (HAM) side. The associated RVS fitting residuals are examined and compared with the relative differences in RVS found between independent studies. Results show that the agreement is within 0.1% and comparable with fitting residuals for all bands except for RSB band M9, where a difference of 0.2% results from the application of the atmospheric water vapor correction for laboratory conditions during the test by Raytheon. NICST has slightly larger RSB RVS uncertainties but still well within the 0.3% total uncertainty allowed for the RVS characterization defined in the Performance Verification Plan.

Wu, Aisheng↗

Mechanically Robust High Magnetic Performance Sm-Co Sintered Magnets (Final Report)

Samarium-cobalt based permanent magnets (SmCo 5 and Sm 2 Co 17 ) have excellent magnetic properties, good corrosion resistance, and long-term thermal stability. Sm-Co sintered magnets have been widely used in electric machines, telecommunication, biomedical devices, and magnetic sensors. They are the most preferred magnets for high-temperature applications (200 - 550 °C). However, Sm-Co sintered magnets are brittle. They cannot be used for applications subjected to high stress, vibration, or mechanical shock. Sm-Co sintered magnets are prone to chipping, and fracture in the course of block magnet manufacturing, part machining, assembly, and operation. The brittleness leads to a magnet production loss of up to 20-30% in volume and imposes limitations on part size and shape. Developing mechanically robust high-performance Sm-Co sintered magnets is of great scientific and technical significance. This project is in response to the current market need for mechanically robust high magnetic performance Sm-Co sintered magnets and their novel manufacturing processes. The project will focus on scaling-up, validation, and technology maturation study of the mechanically tough high magnetic performance Sm-Co magnets developed by Ames Laboratory at a lab-scale with the collaboration of the industry partner Electron Energy Corporation (EEC).

36 MATERIALS SCIENCE↗

Impulse Testing of Corporate-Fed Patch Array Antennas

This paper discusses a novel method for detecting faults in antenna arrays. The method, termed Impulse Testing, was developed for corporate-fed patch arrays where the element is fed by a probe and is shorted at its center. Impulse Testing was devised to supplement conventional microwave measurements in order to quickly verify antenna integrity. The technique relies on exciting each antenna element in turn with a fast pulse (or impulse) that propagates through the feed network to the output port of the antenna. The resulting impulse response is characteristic of the path through the feed network. Using an oscilloscope, a simple amplitude measurement can be made to detect faults. A circuit model of the antenna elements and feed network was constructed to assess various fault scenarios and determine fault-detection thresholds. The experimental setup and impulse measurements for two patch array antennas are presented. Advantages and limitations of the technique are discussed along with applications to other antenna array topologies

antenna array↗

NASA System-Wide Safety Wildland Firefighting Operations Workshop Report

On March 9-11, 2022, NASA’s System-Wide Safety Wildland Firefighting Operations Workshop engaged the broader wildland firefighting management ecosystem in a safety-oriented discussion via a virtual platform. This enabled a better understanding of how NASA and community expertise can be leveraged in the safe development of current and future firefighting systems and operations. The goals of the workshop were to: (1) identify and prioritize the top safety-oriented risks, gaps in capabilities, and emerging technologies to enhance wildland firefighting for both near-term and far-term concepts, with a specific focus on aviation operations and (2) engage the stakeholder community in defining emergent safety-oriented scope, roles, responsibilities, and procedures for agents undergoing increasingly complex wildland firefighting operations in information-rich, but uncertain environments. Workshop participants were solicited from wildland firefighting stakeholders across government, industry, and academia. All levels of government were engaged, as NASA sought attendees from federal, state, local, and tribal government agencies. Industry participants from traditional wildland firefighting domains such as data visualization and equipment manufacturers were invited, and corporate attendees from novel application domains such as aerial robotics and autonomous systems were present as well. The top three findings were as follows: (1) Enhancing situation awareness is a safety priority, especially in the use of aerial assets; (2) Timely access to information along with data fusion and integrated displays will enhance safety-critical decision-making both inside and outside aviation contexts; and (3) Tailorable standards and common operating pictures in the field will enhance inter-agency cooperation in the wildland firefighting lifecycle and enable the optimal use of limited resources such as aerial assets. The workshop helped inform NASA of the relevant safety-related wildland firefighting concerns and aided the broader ecosystem in understanding the potential safety-oriented role NASA might play in this community. Increased engagement with crucial governmental stakeholders (e.g., U.S. Forest Service, CAL FIRE, etc.) along with industry partners in cutting- edge information -centric domains is a fundamental next step. Additionally, the workshop findings will help define the first of a series of operationally challenging demonstrations, held in concert with strategic ecosystem partners, known as the Safety Demonstrator Series for NASA’s System-Wide Safety project. The first demonstration is set in the wildland firefighting application domain and will: (1) examine high risk operational scenarios to reduce their overall risk via services, functions or capabilities that act as risk mitigators (or transfer that risk to automated systems better able to tolerate it) and (2) explore novel tools and technologies that will enhance safety margins by enabling non-traditional or neoteric operational paradigms.

wildland firefighting↗

EASE/ACCESS ground processing at Kennedy Space Center

The Kennedy Space Center (KSC) Payload Management and Operations Directorate is responsible for the processing of Space Shuttle payloads. The KSC responsibilities begin prior to hardware arrival at the launch site and extend until the experiments are returned to the investigators after the flight. The KSC involvement with the integration and checkout of payloads begins with participation in experiment, Mission Peculiar Equipment (MPE), and integrated payload design reviews. This involvement also includes participation in assembly and testing of flight hardware at the appropriate design center, university, or private corporation. Once the hardware arrives at the launch site, KSC personnel install the experiments and MPE onto a carrier in the Operations and Checkout (O & C) building. Following integration, the payload is functionally tested and then installed into the orbiter. After the mission, the payload is removed from the orbiter, deintegrated in the O & C building, and the experiments are turned over to the mission manager. One of the many payloads process at KSC consisted of two space construction experiments: the Experimental Assembly of Structures in Extravehicular Activity (EASE) and the Assembly Concept for Construction of Erectable Space Structures (ACCESS). The details of EASE/ACCESS integration, testing, and deintegration are addressed and how this mission can serve as a guide for future space construction payloads is discussed.

Moates, Deborah J.↗

Proposal to Accomplish Phase B Space Shuttle Program

This proposal has been prepared in response to National Aeronautics and Space Administration Request for Proposal No. 10-8423, dated February 20, 1970, and Amendments No.1, 2, 3, & 4 thereto. It is firm for a period of not less than one hundred twenty (120) days from March 30, 1970. The executed certifications requested in Enclosures 5 and 6 of the Request for Proposal are appended at the end of this proposal. Grumman Aerospace Corporation, along with its associates -- the General Electric Company, Eastern Airlines, the Northrop Corporation, and the Aerojet-General Corporation -- are pleased to submit this proposal. This study must prove that technical challenges can be met at a cost commensurate with realistic national funding levels at an early date, (perferably prior to the late 1977 initial operating capability (IOC) indicated in the Statement of Work). We have assembled a team of extremely competent associates. Together, we are fully qualified to study all facets of the proposed Phase B study, and to develop and build the product. We believe we have already made a promising start toward defining the concept of the space shuttle system.

Mead, Lawrence M.↗

The Space Laser Business Model

Creating long-duration, high-powered lasers, for satellites, that can withstand the type of optical misalignment and damage dished out by the unforgiving environment of space, is work that is unique to NASA. It is complicated, specific work, where each step forward is into uncharted territory. In the 1990s, as this technology was first being created, NASA gave free reign to a group of "laser jocks" to develop their own business model and supply the Space Agency with the technology it needed. It was still to be a part of NASA as a division of Goddard Space Flight Center, but would operate independently out of a remote office. The idea for this satellite laboratory was based on the Skunk Works concept at Lockheed Martin Corporation. Formerly known as the Lockheed Corporation, in 1943, the aerospace firm, realizing that the type of advanced research it needed done could not be performed within the confines of a larger company, allowed a group of researchers and engineers to essentially run their own microbusiness without the corporate oversight. The Skunk Works project, in Burbank, California, produced America s first jet fighter, the world s most successful spy plane (U-2), the first 3-times-the-speed-of-sound surveillance aircraft, and the F-117A Nighthawk Stealth Fighter. Boeing followed suit with its Phantom Works, an advanced research and development branch of the company that operates independent of the larger unit and is responsible for a great deal of its most cutting-edge research. NASA s version of this advanced business model was the Space Lidar Technology Center (SLTC), just south of Goddard, in College Park, Maryland. Established in 1998 under a Cooperative Agreement between Goddard and the University of Maryland s A. James Clark School of Engineering, it was a high-tech laser shop where a small group of specialists, never more than 20 employees, worked all hours of the day and night to create the cutting- edge technology the Agency required of them. Drs. Robert Afzal and Joseph Dallas were directors of the SLTC, and led the development and production of active spaceborne, remote-sensing, optical instruments. As a pioneer in the area of photonics, Dr. Dallas led basic research, development, and production of semiconductor laser diode products, improving coupling efficiency through novel physical optics modeling and intracavity phase-correction techniques. He worked for NASA for 15 years, 11 of which were as a civil servant, and 4 of which were as a contractor.

Source record↗

Application of frequency domain handling qualities criteria to the longitudinal landing task

Under NASA sponsorship, an in-flight simulation of the longitudinal handling qualities of several configurations for the approach and landing tasks was performed on the USAF/AFWAL Total In-Flight Simulator by the Calspan Corporation. The basic configuration was a generic transport airplane with static instability. The control laws included proportional plus integral gain loops to produce pitch-rate and angle-of-attack feedback loops. The evaluation task was a conventional visual approach to a flared touchdown at a designated spot on the runway with a lateral offset. The general conclusions were that the existing criteria are based on pitch-attitude response and that these characteristics do not adequately discriminate between the good and bad configurations of this study. This paper describes the work that has been done to further develop frequency-based criteria in an effort to provide better correlation with the observed data.

Sarrafian, S. K.↗

Formative and summative evaluation efforts for the Teacher Enhancement Institute conducted at the NASA Langley Research Center, summer 1994

The Teacher Enhancement Institute (TEI) at NASA Langley Research Center was developed in response to Executive Order 12821 which mandates national laboratories to 'assist in the mathematics and science education of our Nation's students, teachers, parents, and the public by establishing programs at their agency to provide for training elementary and secondary school teachers to improve their knowledge of mathematics and science. Such programs, to the maximum extent possible, shall involve partnerships with universities, state and local elementary and secondary school authorities, corporations and community based organizations'. The faculty worked closely with one another and the invited speakers to insure that the sessions supported the objectives. Speakers were informed of the objectives and given guidance concerning form and function for the session. Faculty members monitored sessions to assist speakers and to provide a quality control function. Faculty provided feedback to speakers concerning general objective accomplishment. Participant comments were also provided when applicable. Post TEI surveys asked for specific comments about each TEI session. During the second of the two, two week institutes, daily critiques were provided to the participants for their reflection. This seemed to provide much improved feedback to speakers and faculty because the sessions were fresh in each participant's mind. Between sessions one and two, some changes were made to the program as a result of the formative evaluation process. Those changes, though, were minor in nature and comprised what may be called 'fine tuning' a well conceived and implemented program. After the objectives were written, an assessment instrument was developed to test the accomplishment of the objectives. This instrument was actually two surveys, one given before the TEI and one given after the TEI. In using such a series, it was expected that changes in the participants induced by attendance at TEI may be discovered. Because the institute was limited in time and depth of exposure, attitudinal changes (self-assessment of ability and confidence) were chosen to be surveyed. On the pre-survey, seven general categories of questions were asked. The post-survey repeated three of these categories, providing a pre and post evaluation of the same questions and added a fourth category which asked the participant to self-assess objective accomplishment. The assessment process for TEI was valuable when one looks at the final accomplishments of the TEI. A number of aspects stand out: (1) formative evaluation during project development allowed the goals and objectives to guide the development of the institute; (2) formative evaluation provided positive guidance to presenters in developing and implementing their session; (3) formative evaluation helped presenters to improve or focus their sessions; (4) summative evaluation provided managers a way to gauge the success of the institute; (5) summative evaluation provided a benchmark for future programs to be measured against.

Carlson, Randal D.↗

Correlation Between Weather Alerts and Grid Component Failures for Grid Alert

Weather events cause most grid failures. Often, we even get notifications on our phones to take cover or be prepared for an imminent event. If electric grid utilities had a similar warning that also included probable scenarios and the equipment involved, they could prepare and minimize the effects. Recent research at Idaho National Laboratory into electric grid risk analysis methods resulted in a tool that allows for the development of the most likely scenarios given failure probabilities of grid components. INL has a project with the U.S. Department of Energy’s Cybersecurity, Energy Security, and Emergency Response (CESER) program to develop a Grid Alert application that receives messages from the existing emergency alert system, filters and determines components possibly affected by the emergency event, calculates probable scenarios uses MASTERRI and then notifies the utility if there is significant risk. Historical failure data of elements that comprise the U.S. electric grid have been compiled by utilities and organizations such as the international regulatory body North American Electric Reliability Corporation (NERC). Nominal failure rates are obtained from this data. To make this tool possible, estimated failure rates are needed for different component types given the alert type, severity, and location. Historic weather-related grid element failures are correlated with historic weather events from Integrated Public Alert & Warning System (IPAWS). These correlated events and failures are used along with Bayesian updates from the historical norms to provide a modified failure rate for grid elements in the alert areas and calculate probable scenarios. This discusses the Grid Alert project plan but focuses on the data gathered and process used in determining failure rates for possible grid failure scenarios.

24 - POWER TRANSMISSION AND DISTRIBUTION↗