Search NASA⌕ Search

SEARCH · Search NASA

Results for “IC”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

IC Project: w19_hossfault “Modelling of stick-slip behavior in sheared granular fault gouge & nonlinear elasticity behavior in cracked solid”

Low frequency earthquakes, non-volcanic tremor, and acoustic emissions are examples of weak seismic signals that may help detect major seismic events, i.e., earthquakes. In a laboratory setting, in which stick-slip events are simulated, acoustic emissions are detected far from the stick-slip events. In both, field and laboratory scale cases, the acoustic emission signals are sourced or detected in a volume remote from the volume that spawns the earthquake. Therefore, it is relevant to establish the causal relationship between signals detected on passive, remote monitors and the dynamics of the elastic structures that launch important seismic events. The work conducted under this IC allocation allowed us to utilize a numerical model that let us follow this causality, i.e., examine and connect the dynamics in a granular system (fault gouge), to signals detected on passive remote monitors. It was demonstrated that stress chains are key in the dynamics of granular systems and that their evolution is the source of the acoustic emission.

58 GEOSCIENCES↗

FY20 ASC IC L2 Milestone 7180: Performance Portability of SIERRA Mechanics Applications to ATS-1 and ATS-2. Executive Summary

The overall goal of this work was to accelerate simulations supporting the nuclear deterrence (ND) mission through improved performance of key algorithms in the ASC IC Sierra multi-physics application suite. This work focused on porting and optimizing algorithms for the graphics processing units (GPU) on the second ASC advanced technology system (ATS-2), while maintaining or improving performance on commodity technology systems (CTS) and ATS-1. Furthermore, these algorithmic developments used the ASC developed Kokkos performance portability abstraction library to maintain high performance across platforms using identical code, and enable sustainable reduced-cost migration and performance optimization to emerging hardware.

97 MATHEMATICS AND COMPUTING↗

Scalable Geometric Modeler for Overlap Detection and Resolution (ASC IC L2 Milestone 7181 FY2020 Final Review)

The final review for the FY20 Advanced Simulation and Computing (ASC) Integrated Codes (IC) L2 Milestone #7181 was conducted on August 31, 2020 at Sandia National Laboratories in Albuquerque, New Mexico. The review panel unanimously agreed that the milestone has been successfully completed. Roshan Quadros (1543) led the milestone team and various members from the team presented the results. The review panel was comprised of staff from Sandia National Laboratories Albuquerque and California that are involved with computational engineering modeling and analysis. The panel consisted of experts in the fields of solid modeling, discretization, meshing, simulation workflows, and computational analysis including personnel Brett Clark (1543, Chair); Jay Foulk (8363); Jackie Moore (1553); Ron Kensek (1341); Ed Hoffman (8753); Dan Ibanez (1443). The presentation documented the technical approach of the team and summarized the results with sufficient detail to demonstrate both the value and the completion of the milestone. A separate SAND report was also generated with more detail to supplement the presentation. The purpose of the milestone was to advance capabilities for automatically finding, displaying, and resolving geometric overlaps in CAD models.

97 MATHEMATICS AND COMPUTING↗

Jan-Dec 2021 IC Project: w20_earthquake (Yearly Report)

The simulations conducted under this IC project used an in-house code developed at Los Alamos National Laboratory called HOSS (Hybrid Optimization Software Suite) and its extended version called HOSS-FSIS (fluid-structure interaction solver). HOSS has been under development in LANL’s Geophysics Group since 2004 and was used to simulate the signal propagation in pieces of material with pre-existing defects and also to simulate the near source effects of above ground nuclear explosions. One of the key feature of HOSS is that it is superior to pure finite element method and discrete element method implementations because it allows for a natural transition from continuum to discontinuum when the material breaks or fractures.

58 GEOSCIENCES↗

Implementation and Demonstration of P4 Software for Improving ICS Protocol Visibility and Control [Slides]

No prior enabling funded work applicable to this proposal. Programming Protocol-independent Packet Processors (P4) is an open source, domain-specific programming language for network switching devices. P4 complements traditional Software Defined Networking (SDN) which is primarily concerned with the management of packets (e.g. routing/dropping decisions) rather than how each packet is processed. The introduction of P4 provided new capabilities (e.g. firewall, load balancing, enhanced security) but has primarily been deployed in data centers. This effort investigates ways to expand P4 into other niches such as ICS networks.

97 MATHEMATICS AND COMPUTING↗

Risk-based System Upgrade Planning for AOT-IC [Capstone Project]

The Accelerator Operations and Technology Instrumentation and Controls Group (AOT IC) at the Los Alamos Neutron Science Center (LANSCE) has established a comprehensive risk-based system upgrade planning strategy which has been utilized as a tool to prioritize system upgrade projects for the past several years. A challenge with the current system is that the group often lacks the data to quantify the probability and impact of system failures, so the group often relies instead on qualitative risk assessments as well as evaluations of a potential upgrade project’s alignment with group strategy and vision to prioritize projects. A proposed framework to enable quantitative risk probability and impact assessments has been developed and tested on three pilot systems chosen to broadly represent the types and conditions of equipment used by the group. The proposed framework incorporates availability data gathered from the LANSCE control room logbooks and the LANSCE work control system, as well as a system health evaluation which is conducted from a variety of resources to assess the probability of equipment failure. The impact of system failure is viewed from the perspective of impact on mission and schedule, where spares status, system documentation status, and the functional distribution of deployed systems are used to quantify these impacts.

43 PARTICLE ACCELERATORS↗

Risk-based System Upgrade Planning for AOT-IC Presentation [Slides]

The number of deployed systems and different HW/SW form factors makes it difficult to maintain a complete understanding of their health which leads to a reduced level of certainty when assessing risk and trying to prioritize system upgrade efforts. AOT-IC must constantly plan and execute system upgrade and replacement projects to ensure the longevity of the control system. There are many more projects needed than the group can realistically accomplish given schedule and resource constraints. The group must prioritize their upgrade projects to choose only the highest priority projects to execute each year. Currently plans upgrade and replacement projects based on alignment with mission needs, group vision, resource availability, and qualitative risk assessments based on SME estimates. The group maintains a risk register. This is useful as a tool for shaping strategic planning but currently lacks the quantitative data and process needed to generate accurate risk assessments.

43 PARTICLE ACCELERATORS↗

TFR-2574 MARVEL Instrumentation and Control System (ICS)

This document contains the Level 3 requirements associated with the subsystems of the Instrumentation Control System (ICS) in the Microreactor Applications Research Validation and Evaluation (MARVEL) project.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Open Cluster IC 1369 and Its Vicinity: Multicolor Photometry and Gaia DR2 Astrometry

The open cluster IC 1369, located in Cygnus close to the galactic equator at the 89.°6 longitude, and its vicinity are investigated by applying two-dimensional photometric classification of stars down to V = 19 mag measured in the Vilnius seven-color photometric system. Employing the Gaia DR2 coordinates, parallaxes, and proper motions, 143 cluster members are found having cluster membership probabilities ≥0.75. The hottest stars of the evolved main sequence are of spectral class B9. Distances to the cluster, determined by two methods based on the Gaia parallaxes, are 3280 and 3370 pc with an uncertainty of 400–500 pc. Employing the physical HR diagram with the coordinates logL/L{sub ⊙} versus logT{sub eff} and the Padova isochrones, the cluster age is found to be between 300 and 350 Myr. Among the cluster members we identified six red giants of spectral classes G5–G8 and luminosities II–III, 17 Am stars, one Ap star, and one B5 blue straggler. The extinction shows a steep rise up to ∼2.0 mag at 300–700 pc, caused by the extensions of the dust cloud LDN 970 and the Great Cygnus Rift, and up to ∼2.5 mag at the edge of the Perseus arm at 3.0 kpc. The extinction is almost constant between 0.9 and 2.5 kpc from the Sun. The average extinction of the cluster members is 2.54 mag. A systematic error of color excesses found in the Argonaut calculator results is discussed.

79 ASTRONOMY AND ASTROPHYSICS↗

Cluster Difference Imaging Photometric Survey. II. TOI 837: A Young Validated Planet in IC 2602

We report the discovery of TOI 837b and its validation as a transiting planet. We characterize the system using data from the NASA Transiting Exoplanet Survey Satellite mission, the ESA Gaia mission, ground-based photometry from El Sauce and ASTEP400, and spectroscopy from CHIRON, FEROS, and Veloce. We find that TOI 837 is a T = 9.9 mag G0/F9 dwarf in the southern open cluster IC 2602. The star and planet are therefore 35$_{-5}^{+11}$ million years old. Combining the transit photometry with a prior on the stellar parameters derived from the cluster color–magnitude diagram, we find that the planet has an orbital period of 8.3 days and is slightly smaller than Jupiter (R p =0.77$_{-0.07}^{+0.09}$ R Jup ). From radial velocity monitoring, we limit M p sin i to less than 1.20 M Jup (3σ). The transits either graze or nearly graze the stellar limb. Grazing transits are a cause for concern, as they are often indicative of astrophysical false-positive scenarios. Our follow-up data show that such scenarios are unlikely. Our combined multicolor photometry, high-resolution imaging, and radial velocities rule out hierarchical eclipsing binary scenarios. Background eclipsing binary scenarios, though limited by speckle imaging, remain a 0.2% possibility. TOI 837b is therefore a validated adolescent exoplanet. The planetary nature of the system can be confirmed or refuted through observations of the stellar obliquity and the planetary mass. Such observations may also improve our understanding of how the physical and orbital properties of exoplanets change in time.

79 ASTRONOMY AND ASTROPHYSICS↗

A Multiwavelength View of IC 860: What Is in Action inside Quenching Galaxies

We present a multiwavelength study of IC 860, a nearby post-starburst galaxy at the early stage of transitioning from blue and star forming to red and quiescent. Optical images reveal a galaxy-wide, dusty outflow originating from a compact core. We find evidence for a multiphase outflow in the molecular and neutral gas phase from the CO position–velocity diagram and NaD absorption features. We constrain the neutral mass outflow rate to be ~0.5 M ⊙ yr -1 , and the total hydrogen mass outflow rate to be ~12 M ⊙ yr -1 . Neither outflow component seems able to escape the galaxy. We also find evidence for a recent merger in the optical images, CO spatial distribution, and kinematics, and evidence for a buried active galactic nucleus in the optical emission line ratios, mid-IR properties, and radio spectral shape. The depletion time of the molecular gas reservoir under the current star formation rate is ~7 Gyr, indicating that the galaxy could stay at the intermediate stage between the blue and red sequence for a long time. Thus the timescales for a significant decline in star formation rate (quenching) and gas depletion are not necessarily the same. Our analysis supports the quenching picture where outflows help suppress star formation by disturbing rather than expelling the gas and shed light on possible ongoing activities in similar quenching galaxies.

79 ASTRONOMY AND ASTROPHYSICS↗

An Emergency Helium Bubbling Control System for the Prevention of Geysering in the Lox Suction Lines of S-IC

An emergency helium bubbling system was devised for geyser suppression in the LOX suction lines of S-IC . Flight model pressure and temperature transducers were compared to more accurate transducers to determine the best sensor configuration. Transducers were electronically simulated to calibrate the circuit design. A development system was tested for feasibility on a full- scale LOX flow line test facility.

BUBBLE↗