Search NASASearch

SEARCH · Search NASA

Results for “Accelerator Design, Technology, and Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

LAMP Technical Readiness Evaluation Report

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed in 2023. This included determining corresponding Technical Readiness Levels (TRLs) for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. This revised report includes a summary of the recent design modifications required to meet the project Key Performance Requirements (KPPs), some of which may reduce technical risk to the project. These recent design modifications include: • Further optimization of the low-energy and medium-energy beam transport regions (LEBT and MEBT, respectively), including relocation of various functional elements (ie choppers, kickers, and bunchers). • An additional H - ion source to separate ion-source function based on beam delivery requirements. • A high-repetition-rate pulsed kicker magnet to select/merge the two H ion beams into a common low-energy beam transport. • Modification and further optimization to a more conventional RFQ design. Performance of the RFQ has been optimized to deliver the required three types of beams while meeting the project KPPs. • The addition of a second chopper in the medium-energy beam transport (MEBT) line to reduce the required pulser voltages. The scope of the evaluation was limited to the project Work Breakdown Structure (WBS) elements as defined for the RFQ Injector and Drift Tube Linac (DTL) systems only. Integration of Instrumentation and Controls (I&C) and Safety Systems was not considered, although specific technologies as related to the RFQ and DTL systems were included. Other elements of the project such as Shielding, System Design, Technical Management, and additional facility integration needed to enable off-line testing and pre-installation commissioning were also not evaluated. Each technical subsystem element was evaluated for technical readiness, however, not all were found to meet the criteria for a CTE. Three subsystem elements were determined to meet the CTE criteria. Their associated TRLs are summarized in the table below. These subsystem elements of the project have the lowest technical readiness due to either being new, novel or modified, requiring additional R&D before being capable of meeting the project Key Performance Parameters (KPPs) and subsystem requirements, or present technology exists but has not yet been demonstrated in a relevant environment. All other subsystems were determined to have a TRL of 8, indicating that actual operating systems exist having similar performance requirements as needed for LAMP. Details of the technical readiness evaluation for each subsystem is given in the following sections of this report.

43 PARTICLE ACCELERATORS

Preliminary Look at the LBEG & MPEG Beam Transmissions between HPSim and Operation Data

This report summarizes recent work on estimating the transmission of LANSCE H- beams from the end of the present DTL to both the PSR stripper foil (LBEG) and WNR target 4 (MPEG). The LBEG beam might be considered a more typical LINAC beam and lends itself to continuous monitoring of transmission through the various stages of the accelerator. For the MPEG, however, the widely-spaced micropulses and lack of the requisite sensitivity current monitors throughout the accelerator make these measurements extremely difficult and more uncertain. Therefore, to assist in estimating the MPEG beam transmission, beam-dynamics simulations using HPSim were employed. These beam transmission estimates from the end of the Drift Tube Linac (DTL) to Target 4 (MPEG) and the PSR stripper foil (LBEG) are vital to determine the charge requirements for LAMP’s front end. In this technote, we demonstrate three major efforts in determining the transmission: (1) Convert the WNR beamline lattice from TRANSPORT to HPSim for use in the simulation; (2) Simulate the optimization process in the Central Control Room (CCR) that brings down the losses by up to a factor of 4000 between the end of the initial physics-based tuneup phase and production beam operation; (3) Analyze operational data to deduce measured transmissions. Table 1 shows the estimated losses with HPSim and operational analysis. Finally, a better measurement and other improvements to refine the results are also proposed.

43 PARTICLE ACCELERATORS

LEBT Buncher / Feed Forward / Frequency Generation: System Design Document (SDD)

The LAMP Low Energy Beam Transport (LEBT) transfers a continuous beam at 100 keV from the ion source to RFQ in LEBT. A LEBT buncher imposes an energy tilt to initiate velocy bunching in the chopped beam pulse about 25 ns long to form a short MPEG bunch. One possible option for the LEBT buncher based on a two-gap LC-circuit driven structure was considered, which is similar to the existing LANSCE low-frequncy buncher (LFB). Another possible option is a non-resonant element driven by a pulse-forming-network that provides a single pulse at the repetition frequency of MPEG beam, with a period of 1.8 µs. The LEBT operation is synchronized with the accelerator timing system.

43 PARTICLE ACCELERATORS

MEBT Bunchers: System Design Document (SDD)

The LAMP Medium Energy Beam Transport (MEBT) transfers bunched beam at the energy 3 MeV from RFQ to the Drift-Tube Linac (DTL) entrance. The beam particles (protons or H- ) in the LAMP MEBT have velocity β = v/c = 0.08, where v is the beam velocity, c is the speed of light. The MEBT bunchers keep beam bunches from spreading longitudinally as they propagate through the MEBT, where some unwanted bunches are removed by a chopper to create a required beam pattern. The MEBT bunchers are RF cavities operating at the frequency 201.25 MHz; possible design options were considered in.

43 PARTICLE ACCELERATORS

Post-DTL Beam Delivery

Ensuring that the beam delivered from the upgraded Front-End (FE) meets the Key Performance Parameters (KPPs) at each user facility is critical to the success of the LANSCE Accelerator Modernization Project (LAMP). For a high-intensity, multi-user facility like LANSCE, compliance with beam loss and radiation thresholds is as important as the charge delivered to each target. While early LAMPF/LANSCE operations relied on iterative tuning to minimize losses from beam halo and tail particles, the new FE may introduce different beam distributions and loss modes—making predictive modeling essential. To manage this, the F2E (Front-End to End) effort is developing detailed particle-tracking models that reflect realistic beamline conditions, including halo formation and expected diagnostic readings. These "snapshot" simulations aim to benchmark live machine performance at a given moment. This will help quantify how beam quality from the new FE will propagate downstream through the facility. Only by validating these models can we confidently assess and mitigate the potential impacts of the LAMP FE on beam delivery. Post-DTL, the beam splits to serve five major user facilities. Historically, low-energy beam transport has been modeled using TRACE, and higher-energy sections with TRANSPORT. These have now been unified into MAD-X format and validated with codes such as Elegant, pyOrbit, XSuite, Impact-Z, and HPSim. The primary focus now is on accurate modeling of full particle distributions (including beam halo) as they traverse the accelerator and beamlines to each experimental station. All models are at various stages of validation with empirical data.

43 PARTICLE ACCELERATORS

LEBT Chopper System: System Design Document (SDD)

The Low Energy Beam Transport (LEBT) chopper creates a required beam time structure by chopping out (removing by deflecting from the beam path) unwanted parts of a continuous beam transported from the ion source to RFQ in LEBT. The unchopped parts of the beam propagate through the LEBT, while the deflected parts are deposited on an absorbing target. The chopper system in general consists of a deflecting structure, where the beam-deflecting fields are created, and a pulse generator that feeds this structure with voltage pulses having the required time pattern. The system should turn deflection on and off within a short time interval, because the beam parts within the pulse front and end will be only partially deflected and will form unwanted tails of the beam pulse downstream. This can be achieved with traveling slow-wave chopper structures where the field propagates with the same velocity as the beam, as illustrated in Fig. 1.

43 PARTICLE ACCELERATORS

MEBT Chopper System: System Design Document (SDD)

The Medium Energy Beam Transport (MEBT) chopper removes unwanted beam bunches by deflecting them to a target from a bunched beam transported through the MEBT from RFQ to the Drift-Tube Linac (DTL) entrance. The unchopped bunches propagate through the MEBT to DTL, while the deflected bunches are deposited on a target downstream of chopper. The chopper system consists of a deflecting structure, where the beam-deflecting fields are created, and a pulse generator (pulser) that feeds this structure with voltage pulses having the required time pattern. Ideally, the system should turn deflection on and off in the time interval between the bunches to prevent partially chopped / deflected bunches. This usually requires traveling slow-wave chopper structures where the field propagates with the same velocity as the beam, as illustrated in Fig. 1.

43 PARTICLE ACCELERATORS

Beam optics design of a prototype 20 kW conduction-cooled SRF accelerator for medical sterilization

Superconducting technology has significantly advanced the capabilities of particle accelerators, facilitating higher beam-power operations for fundamental research at a comparatively lower cost. However, the conventional implementation of superconducting technology introduces complexities in the form of cryogenic plants, cryogenic distribution systems and substantial construction and operational cost. In response to these challenges, recent research efforts at Fermilab have been dedicated to the development of a cryogen-free, conduction-cooled Nb3Sn-based superconducting technology. This paper outlines the beam optics design of a 20-kW conduction-cooled compact superconducting accelerator for medical sterilization. The paper reviews both the physics and practical constraints associated with high beam-power operation within the context of industrial applications. The focus is on providing insights into the potential of this innovative technology to overcome existing challenges and pave the way for more accessible and efficient industrial particle accelerators.

Saini, A. [Fermilab]

Future Circular Collider Feasibility Study Report

In response to the 2020 Update of the European Strategy for Particle Physics , the Future Circular Collider (FCC) Feasibility Study was launched as an international collaboration hosted by CERN. This report describes the FCC integrated programme , which consists of two stages: an electron-positron collider (FCC-ee) in the first phase, serving as a high-luminosity Higgs, top, and electroweak factory; followed by a proton-proton collider (FCC-hh) at the energy frontier in the second phase. The FCC-ee is designed to operate at four key centre-of-mass energies: the Z pole, the WW pair production threshold, the ZH production peak, and the top/anti-top production threshold—each delivering the highest possible luminosities to four experiments. Over 15 years of operation, FCC-ee will produce more than 6 trillion Z bosons, 200 million WW pairs, nearly 3 million Higgs bosons, and 2 million top anti-top pairs. Precise energy calibration at the Z pole and WW threshold will be achieved through frequent resonant depolarisation of pilot bunches. The sequence of operation modes between the Z, WW, and ZH substages remains flexible. The FCC-hh will operate at a centre-of-mass energy of approximately 85 TeV—nearly an order of magnitude higher than the LHC—and is designed to deliver 5 to 10 times the integrated luminosity of the upcoming High-Luminosity LHC. Its mass reach for direct discovery extends to several tens of TeV. In addition to proton-proton collisions, the FCC-hh is capable of supporting ion-ion, ion-proton, and lepton-hadron collision modes. This second volume of the Feasibility Study Report presents the complete design of the FCC-ee collider, its operation and staging strategy, the full-energy booster and injector complex, required accelerator technologies, safety concepts, and technical infrastructure. It also includes the design of the FCC-hh hadron collider, development of high-field magnets, hadron injector options, and key technical systems for FCC-hh.

Benedikt, M. [European Organization for Nuclear Re

Ku-band electron linac for battery-powered hand-portable 2-MeV X-ray generator

X-ray generators, producing radiation in MeV range, are a critical tool for radiography, non-destructive testing and security applications. Field operation of such source requires them to be hand-portable, autonomous and allow parameter adjustability. RF linear accelerators can serve as a flexible, reliable, and robust radiation generator alternative to dangerous radioisotopes and bulky betatrons that are currently used for field radiography if their size, weight, cost, and imaging performance are matched to these sources. Here, in this paper, we present the design and test results of a 2 MeV Ku-band electron linac for a hand-portable X-ray generator system for field radiography being developed by RadiaBeam. The dramatic scale of miniaturization and cost-reduction is achieved thanks to the implementation of innovative technologies such as air-cooled Ku-band air-traffic control magnetrons, a split accelerating structure fabrication technique, and solid-state Marx modulators. This paper presents the design of the first prototype of the accelerator, its operation from Li-Ion batteries, as well as high-power and beam measurements.

43 PARTICLE ACCELERATORS

Design of a 915 MHz conduction-cooled cryomodule

High-power, compact, continuous-wave (CW) linear electron accelerators with beam energies of up to 10 MeV are being considered for possible industrial applications. Conduction-cooled, superconducting radio-frequency (SRF) technology allows operating such machines at high electrical efficiency, thereby reducing the operating cost significantly. A prototype conduction-cooled SRF cryomodule has been designed and components are currently being manufactured. The cryomodule features a two-cell, 915 MHz SRF cavity, two cryocoolers, a fundamental power coupler, two magnetic shields, a thermal shield and warm-to-cold transitions. The cryomodule has been designed to be able to provide an energy gain of 3.5 MeV to a CW electron beam with a current of 5 mA. This contribution focusses on thermal and mechanical design aspects of the cryomodule.

Ciovati, G. [Old Dominion Univ., Norfolk, VA (Unit

Design of a 915 MHz conduction-cooled cryomodule

High-power, compact, continuous-wave (CW) linear electron accelerators with beam energies of up to 10 MeV are being considered for possible industrial applications. Conduction-cooled, superconducting radio-frequency (SRF) technology allows operating such machines at high electrical efficiency, thereby reducing the operating cost significantly. A prototype conduction-cooled SRF cryomodule has been designed and components are currently being manufactured. The cryomodule features a two-cell, 915 MHz SRF cavity, two cryocoolers, a fundamental power coupler, two magnetic shields, a thermal shield and warm-to-cold transitions. The cryomodule has been designed to be able to provide an energy gain of 3.5 MeV to a CW electron beam with a current of 5 mA. This contribution focusses on thermal and mechanical design aspects of the cryomodule.

Ciovati, G. [Old Dominion Univ., Norfolk, VA (Unit

Upgrading Fermilab’s accelerator control system with ACORN

The Fermilab Accelerator Complex is the largest national user facility in the Office of High Energy Physics (DOE/HEP) program and the only national user facility operating at Fermilab. Fermilab serves as the host to the Long Baseline Neutrino Facility/Deep Underground Neutrino Experiment (LBNF/DUNE), the laboratory’s flagship project for neutrino science that is under construction. LBNF/DUNE will be powered by megawatt beams from an upgraded accelerator, the Proton Improvement Plan II (PIP-II) that will replace the laboratory’s aging linear accelerator with a new one based on superconducting radio-frequency cavities. The Accelerator Controls Operations Research Network (ACORN) Project will support LBNF/DUNE and PIP-II by modernizing the accelerator control system. The project is at the conceptual design phase and looking to achieve Critical Decision 1 (CD-1) later this year. The scope and structure of the project will be presented, along with an overview of how that has changed in the past year. Current design and technology choices will be shared. Specific challenges facing the project will be addressed, along with current thinking on solutions.

Roehrig, Christian [Fermilab]