Search NASA⌕ Search

SEARCH · Search NASA

Results for “Assembly and Manufacturing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Project Title: Demonstration High Temperature Superconducting NonPlanar Stellarator Magnet with Advanced Manufactured Assemblies

This is the final report for the project “Demonstration High Temperature Superconducting Non- Planar Stellarator Magnet with Advanced Manufactured Assemblies”, funded by DOE, and performed by Type One Energy from September, 2020, to March 2024 involving the Fusion Technology Institute at the University of Wisconsin–Madison, the Plasma Science and Fusion Center (PSFC) at the Massachusetts Institute of Technology (MIT) and Commonwealth Fusion Systems (CFS) to design and fabricate the first non-planar HTS (REBCO) coil for a high-field stellarator based on the SPARC tokamak’s VIPER cable concept. Stellarators at high fields make high-temperature superconducting magnets necessary for a compact fusion device. But the asymmetric and non-planar nature of its components, especially the magnets make it difficult for scalable producibility. To address these challenges, two promising technologies have emerged: advanced manufacturing (AM) for the supporting plates for forming the magnets, and high-temperature superconducting (HTS) cables inside the plates. AM has advanced enough to produce stellarator components with the necessary geometric complexity, size, and the precision, leading to potentially significant reductions in production time, cost, and waste. The cost of HTS tape has decreased dramatically, and progress in HTS planar magnet development has reached a point where it can be proposed for application to complex 3D non-planar magnets. The main objective of this project is to develop, demonstrate and pre-commercialize a novel, non-planar HTS coil shape that remains superconducting to achieve production scalable reductions in time and cost and performance. The proposed technology is based on the novel concept of a precision sub-scale HTS nonplanar coil assembly. This project focuses on the design, fabrication, material optimization of cable design, and validation and demonstration of the high current carrying capability of superconducting magnets and their support in a complex 3D shape needed for application to stellarator magnetic plasma confinement. The specific objectives of this research program include: (1) The successful application of metal AM to build a precision sub-scale HTS nonplanar coil, (2) An HTS cable and cross-section design that can conform to the required nonplanar coil shape (bend radii as tight as 10-cm) and remains superconducting at an engineering current density of 1.35 kA/cm 2 at 77 K and 1 tesla at the conductor (5 kA in the cable). To achieve the above challenging goals, we have formed a multidisciplinary research team consisting of members from Type One Energy and UW-Madison, MIT PSFC and CFS with complementary skills and strong facilities. The team worked collaboratively on fundamental and applied research on the following three major technical areas: (1) Design, fabrication, and optimization of non-planar HTS Cable The ultimate goal of the project is to determine if commercial REBCO tapes and additive manufacturing can be used to fabricate high field (≥ 10T) non-planar coils with tight bending radii (≃ 100mm) and with a degradation of the critical current (Ic) smaller than 20% with respect to the expected performance. We started with shorter length cable to evaluate the scalability of the production process and eventually reached multiple turns for higher magnetic fields. Our findings suggest that a stellarator coil system of a relevant size, characterized by its asymmetric and non-planar components, can be fabricated using a formed cable in plate method. This system can be simulated using a large-scale modeling approach. The use of hybrid modeling 3 techniques will be pivotal in reducing the complexity of the model and in assessing expected performance in designs. (2) Modeling and simulation of the non-planar HTS Cable Multiphysics simulations are performed using the commercial software and are carried out in self-field conditions, involving 2D and 3D models and twisted around one slot of twist-pitched VIPER cable. Multiphysics simulations are mainly focused on the coil for the critical current evaluation, the magnetic field map, self-Lorentz forces and mechanical, and magnetothermal behavior and the quench dynamics. The detailed model and prediction of the superconducting performance of a stellarator-relevant demonstration cable from numerical simulations supports the results from the actual testing backing the results. A detailed description and results are provided in the later sections. (3) Design, fabrication, and optimization of support for the non-planar HTS Cable The team developed an additive manufactured (AM) coil positioning plate that formed into the required non-planar geometry (with bend radii as tight as 10-cm) and to acceptable tolerances required for a stellarator magnet: (+0.25-mm from ideal on dimensions of coil positioning plates and up to +1-mm from ideal for position of wound coil). The plate materials is also included in this selection process from fabrication and 3D printing perspective and commensurate with eventual application to a fusion reactor. From the cost effectiveness point of view, the HTS coil and plate has the potential to cost less than that made in conventional methods with less waste (<75% waste) reducing time (<50%) and cost (<50%), especially as the AM field matures. The application of advanced manufacturing in the construction of the support plates will also lead to cost reduction, as the cables can be easily replaced, thereby making the assembly modular. With such high primary cost and time savings, high current densities and magnetic field, the funded R&D work has validated the designs, proven the feasibility, and characterized the performance of the HTS coil and plate assembly, paving the way for a relevant-size stellarator coil system.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Design, Manufacturing, Assembly, Testing, and Lessons Learned of the Prototype 650 MHz Couplers

Six 650 MHz high-power couplers will be integrated into the prototype High Beta 650 MHz (HB650) cryomodule for the PIP-II project at Fermilab. The design of the coupler is described, including design optimizations from the previous generation. This paper then describes the coupler life-cycle, including manufacturing, assembly, testing, conditioning and the lessons learned at each stage.

43 PARTICLE ACCELERATORS↗

Design, Manufacturing, Assembly, and Lessons Learned of the Pre-production 325 MHz Couplers for the PIP-II Project at Fermilab

Five 325 MHz high-power couplers will be integrated into the pre-production Single Spoke Resonator Type-II (ppSSR2) cryomodule for the PIP-II project at Fermilab. Couplers were procured by both Fermilab and IJCLAB for this effort. The design of the coupler is described, including design optimizations from the previous generation. This paper then describes the coupler life cycle, including design, manufacturing, and assembly, along with the lessons learned at each stage.

43 PARTICLE ACCELERATORS↗

Membrane Electrode Assembly Manufacturing Automation Technology for the Electrochemical Compression of Hydrogen: Cooperative Research and Development (Final Report)

Electrochemical compression has the possibility to outcompete mechanical compression for hydrogen end- use applications. While HyET has a compressor that can output JO kilograms (kg)/day (fully scalable from home-to-industrial application) at up to 700 bar, the energy demand and reliability require top-quality electrochemical hydrogen compression (EHC) membrane electrode assemblies (MEAs), preferably prepared by cost-effective high-capacity manufacturing. High pressure requires a special MEA design, deviating from typical proton exchange membrane fuel cell (PEMFC) MEAs with adapted catalyst layer substrates, asking for a modified coating process. The National Renewable Energy Laboratory (NREL) will help HyET by developing an automated catalyst coating process fit for EHC MEA manufacturing. In addition, inline quality inspection methods will be developed/selected to improve the MBA quality as it is used for EHC stack assembly. In a joint effort, NREL and HyET will even design an automated manufacturing process for the EHC MEA and approach potential United States (US) suppliers of manufacturing equipment.

30 DIRECT ENERGY CONVERSION↗

Membrane electrode assembly manufacturing process

Methods and compositions for making fuel cell components are described. In one embodiment, the method comprises providing a substrate, and forming or adhering an electrode on the substrate, wherein the forming includes depositing an aqueous mixture comprising water, a water-insoluble component, a catalyst, and an ionomer. The water-insoluble component comprises a water-insoluble alcohol, a water-insoluble carboxylic acid, or a combination thereof. The use of such water-insoluble components results in a stable liquid medium with reduced reticulation upon drying, reduced dissolution of the substrate, and reduced penetration of the pores of the substrate.

Edmundson, Mark↗

Additive manufacturing method and assembly

Methods and assemblies for additive manufacturing portions of components with enhanced strength are provided. The assemblies comprise a first deposition head and an apparatus for causing one or more reinforcement fibers to extend more than two layers within previously-deposited layers of build material. The first deposition head is configured to deposit a plurality of layers of a filament comprising a reinforcement fiber and thermoplastic material. The apparatus may comprise a needle point configured to be inserted into the plurality of layers to displace the reinforcement fiber so that it extends two or more of the plurality of layers. The apparatus may additionally or alternatively comprise a second deposition head having a needle tip configured to be inserted into the plurality of layers to inject a length of a second filament comprising thermoplastic material and a reinforcement fiber so that the reinforcement fiber of the second filament extends two or more layers of the plurality of layers of the first filament.

Barr, Christian G.↗

Design of the 650 MHz High Beta Prototype Cryomodule for PIP-II at Fermilab

The Proton Improvement Plan II (PIP-II) is the first U.S. accelerator project that will have significant contributions from international partners. The prototype High Beta 650 MHz cryomodule (pHB650 CM) is designed by an integrated design team, consisting of Fermilab (USA), CEA (France), UKRI-STFC (UK), and RRCAT (India). The manufacturing & assembly of this prototype cryomodule will be done at Fermilab, whereas the production cryomodules will be manufactured and/or assembled by UKRI-STFC, RRCAT, or Fermilab. Similar to the prototype Single Spoke Resonator 1 cryomodule (pSSR1 CM), this cryomodule is based on a strong-back at room temperature supporting the coldmass. The pSSR1 CM led to significant lessons being learnt on the design, procurement, and assembly processes. These lessons were incorporated into the design and processes for the pHB650 CM. Amongst many challenges faced, the main challenges of the pHB650 CM design were to make the cryomodule compatible to overseas transportation and to design components that can be procured in USA, Europe, and India.

43 PARTICLE ACCELERATORS↗

CEA Contribution to the PIP-II Linear Accelerator

The Proton Improvement Plan II (PIP-II) that will be installed at Fermilab is the first U.S. accelerator project that will have significant contributions from international partners. CEA joined the international collaboration in 2018, and will deliver 10 low-beta cryomodules as In-Kind Contribution to the PIP-II project, with cavities supplied by LASA-INFN and power couplers and tuning systems supplied by Fermilab. This paper presents the CEA scope of work that includes the design, manufacturing, assembly and tests of the cryomodules and the upgrade of the existing infrastructures to the PIP-II requirements.

43 PARTICLE ACCELERATORS↗

Floating Offshore Wind US Manufacturing and Commercialization (CRADA Final Report)

Create a detailed manufacturing, assembly, load-out, transportation, upending, turbine integration, and offshore transportation plan for a hypothetical project in one of the California lease areas off the central coast. Develop a detailed schedule and cost estimation for each step of the process and compare with conventional floating platform designs.

17 WIND ENERGY↗

Design and Development of the PIP-II Stripline Beam Position Monitor

• Designed a stripline Beam Position Monitor (BPM) for the PIP-II accelerator to ensure precise proton beam alignment under ultra-high vacuum (UHV) conditions • Developed a mechanically robust and manufacturable assembly, including a cylindrical housing, electrodes, flange interfaces, and internal supports • Achieved high safety margins under pressure loading, using finite element analysis (FEA), while

Avalos Angel, Alejandro [Northern Illinois U.]↗

Mechanics and Cooling of the CMS Phase-II Tracker Barrel

The CMS upgrade for the High-Luminosity LHC (HL-LHC) era will allow for an incredibly high rate of data collection, to be used in the next generation of precision measurements and searches for beyond the standard model physics. A key element of this upgrade is the full replacement of the silicon strip tracker to enable level-1 triggering on track level primitives, produced by pixel-strip (PS) and strip-strip (2S) modules, tiled together to form the new detector. Mechanically supporting and cooling these modules is not trivial, as material budget in the tracker volume is highly constrained, and as the modules accrue radiation damage they risk becoming entirely non-functional if the silicon sensors are not sufficiently cooled. To address this, each region of the tracker has a bespoke solution for housing and cooling their modules, mostly depending on carbon-fiber and carbon-foam structures, with dual phase CO2 cooling. For the most central part of the tracker, the Flat Barrel with PS modules (Flat TBPS) covers the pseudorapidity range out to $|\eta|=0.4$, and the mechanical structures are manufactured, assembled, and tested entirely by Fermilab and UC Davis. This presentation will describe the intense design and testing requirements for these components, and how they will ensure strong performance of the tracker through the HL-LHC era.

Cosby, Christopher [Fermilab]↗

Manufacturing Cost Analysis of Advanced Parabolic Trough Collector

The research team performed a detailed bottom-up manufacturing cost estimate for an advanced parabolic trough design - the Solar Dynamics Sunbeam-MT (Sunbeam Mid-Term). This includes all components for manufacturing and assembly in a manufacturing facility (e.g. space frame and arms), and the purchased parts (e.g. mirrors and receiver tubes). Estimates of the construction and assembly activities have been made to then determine an estimated installed cost. Prior analysis has already undertaken detailed bottom-up manufacturing, assembly, and construction analysis for the Ultimate Trough from schlaich bergermann partner (sbp), and this work updates the solar field cost estimates based on a similar aperture area as the SunBeam-MT. For this analysis, the Ultimate Trough is considered the commercial parabolic trough and the Sunbeam-MT as the advanced parabolic trough. For similarity, both the Sunbeam-MT and the Ultimate Trough have been modelled with a solar field with approximately 800,000 square meters (m2) in aperture area - the equivalent of a large CSP plant. The analysis has found a potential installed cost estimate of the Sunbeam-MT could be $120/m2 but must be built at scale to confirm this estimate. Compared to prior analysis, the commercial Ultimate Trough using U.S. conditions, has reduced in installed cost from $178/m2 to $152/m2. Both designs could be even cheaper with Chinese steel.

cost analysis↗