Search NASA⌕ Search

SEARCH · Search NASA

Results for “Hydropower hybrids”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Corral Summit Pumped Storage Hydropower Hybrid: Site Suitability Assessment

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY↗

Corral Summit Pumped Storage Hydropower Hybrid Site Suitability Assessment (Rev.1)

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY↗

Existing Hydropower Assets (EHA) Annual Net Generation Plant Database, 2003-2024

Existing Hydropower Asset (EHA) Annual Net Generation is a geospatial point-level dataset containing annual net generation over time (2003-2024) and key characteristics of operational U.S. hydropower plants with 1 megawatt or greater of nameplate capacity. EIA 923 and EHA are the primary sources of the derived data. Pumped storage and hybrid plants are excluded.

Johnson, Megan [ORNL] (ORCID:0000000290141741)↗

Existing Hydropower Assets (EHA) Annual Gross Generation Plant Database, 2003-2024

Existing Hydropower Asset (EHA) Annual Gross Generation is a geospatial point-level dataset containing annual gross generation over time (2003-2024) and key characteristics of operational U.S. pumped storage and hybrid plants with 1 megawatt or greater of nameplate capacity. EIA 923 and EHA are the primary sources of the derived data. Hydropower units are excluded.

Johnson, Megan [ORNL] (ORCID:0000000290141741)↗

Hybrid Bioenergy and Hydropower Systems: Leveraging Heterogeneous Biomass and Wastes from Watersheds

Sandia National Laboratories and INL explore the water-for-energy nexus in this white paper, focusing on the impact of heterogeneous watershed waste materials on hydropower facilities. They identify key challenges—such as wildfires, and debris intercepted at water intakes—that adversely affect both watershed health and hydropower operations. More importantly, SNL and INL highlight opportunities to valorize these bioresources and waste materials by converting them into usable energy.

09 BIOMASS FUELS↗

Hybrid renewable pumped storage hydropower energy storage system

A pumped storage hydroelectric system may include a reservoir system including an upper reservoir system and a lower reservoir system. At least one of the upper reservoir system and the lower reservoir system may include a modular reservoir arrangement. A penstock may be coupled with the upper reservoir system. A pump/turbine may be coupled with the penstock and with the lower reservoir system. The pump/turbine may be configured to receive water flowing from the upper reservoir system to the lower reservoir system for generating electrical power, and to pump water from the lower reservoir system to the upper reservoir system for storing energy.

Medina, Hector Eduardo↗

Paired Hydro-Battery Hybrid System Operations Using MIQP Based Multi-Objective Optimization

Hybridizing a hydropower plant with a battery energy storage system is often a very expensive decision. So to make the case for feasibility of hybridization the cost benefit analysis must be comprehensive. Most literature found on this subject only uses one out of many different available value streams to carry out a feasibility analysis. To that end, in this study we propose a multi-objective optimization formulation and a mixed-integer quadratic programming optimization engine that considers multiple different value streams and optimizes hydro-battery hybrid system paired operations to maximize revenue generated from energy arbitrage while simultaneously minimizing the total hydro turbine mileage thus reducing turbine starts and stops and improving turbines life all while following all environmental constraints and not violating any limitations either regulatory or preferential (i.e., to support recreational activities like white water rafting, etc.). In this study we also implemented the developed optimization methodology to a real-world case study of Bagnell dam hydropower facility (8 units totaling 240 MW rated power capacity) which is owned and operated by our industry partner Ameren Energy Inc. The case study outcomes shows that by hybridizing the Bagnell dam hydropower facility with a 60 MW x 2-hr battery energy storage system, the annual benefits can be increased over \$6 million while reducing the annual mileage averaged per turbine and number of start/stops by over 98\% and 85\% respectively.

Chalishazar, Vishvas H.↗

Hybridization Assessment of Trybrid Pumped Storage Hydropower System—Part 1: A Case Study of Corral Summit

This report is a part of the deliverables for technical assistance provided to Cat Creek Energy for the Coral Summit Trybrid (Triple Hybrid-Pumped Storage Hydropower, Battery Energy Storage System, and photovoltaic solar energy) energy project. This report explores the operational benefits and challenges of hybridizing an open loop PSH (200MW) located at Mackay, Custer County, Idaho with solar PV (Ground mount 300MW and floating 40MW) and battery (720MWhr). This document reports two activities performed as a part of the hybridization assessment task 1) optimal resource allocation and energy management strategy, and 2) power quality and reliability assessment. From optimal resource allocation and energy management strategy (activity 1), the following key findings can be observed: • Conventional PSH (CPSH) with two reversible pump turbines and separate penstocks can provide required flexibility equivalent to that from two ternary PSH with separate penstock. With single unit CPSH, upper reservoir head cannot be maintained accurately, the variation of water level is rapid and pump mode flexibility is not available. These disadvantages can be overcome by single unit TPSH. However, using two CPSH units with separate penstocks also overcome these disadvantages with the formation of the hydraulic short circuit between two conventional units. • Flooding of the lower reservoir is a severe concern when considering continuous operation for black start. This limits the duration of continuous operation from PSH alone to around 50 hours. Due to the complementary PV and battery action, the duration of continuous operation and smooth power output can be extended. • An optimization problem is framed that maximizes the power output on an hourly basis while minimizing constraint violations and respecting seasonal variations of solar PV and load profiles . Two value streams, arbitrage and baseload generation are served by this profile. It was uncovered that for smooth power output during regular operation, PV curtailment will be required, or the battery capacity needs to be increased above 90MW to accommodate additional PV. From power quality and reliability assessment (activity 2) the following takeaway points can be observed: • The Trybrid, when integrated at the Lost River bus, and limited to 250MW in generation mode and -150MW in the pump mode, causes no violation of voltage or flow.

13 - HYDRO ENERGY↗

Hydroboost

HydroBoost is the most realistic revenue optimization tool for the hybridization of hydropower and battery energy storage systems to date. The innovative representation of how operators actually schedule hydropower in practice results in more realistic predictions of revenue and operations. Unlike other optimization tools, HydroBoost generates forecast energy prices with uncertainty to use in the optimization. This allows HydroBoost to give users a range of potential revenue with an upper bound using the perfect foresight pricing and a lower bound using a naive persistence forecast model. Additional forecast can be generated and used in the optimization, such as additive models, random forest, and neural networks to give further insight into potential revenue. HydroBoost has been designed to be applicable for both run-of-river and reservoir storage sites. The primary focus is on the day-ahead market and requires year-long data with an hour time-step. All time-series input and constraints are contained in an Excel worksheet for convince. The user will run the forecasting generation first with a Python script to give the optimization model the necessary requirements. Next the optimization is ran using Julia and results are generated and stored into a directory as csv files. HydroBoost includes an additional module to generate figures based on the results of the optimization simulation. The results help analyze the results and users to draw insights into how the hydro and battery systems are operated and the revenue each is producing. Additionally, the difference between the perfect foresight model and models that include forecast can easily be inspected.

Phillips, TylerB. [Idaho National Laboratory (INL)↗

Optimal Complementarity Analysis of Potential Floating Solar Co-Located With Existing Hydropower Assets Across the Contiguous United States

The U.S. is expected to double its rate of renewable capacity from 2024 to 2030. However, the stochastic nature of renewable energy poses challenges to the operation and reliability of our power grid. The combined generation from renewable energy sources, with dispatchable sources (such as hydropower) operating as a hybrid energy plant, could mitigate this variability. In this paper, the complementarity analysis of selected U.S. reservoirs with existing hydropower assets (EHAs) and potential floating photovoltaics (FPVs) is conducted for the continuous U.S. (CONUS). The optimal FPV capacity for each site is determined by minimizing the variability of the combined output, while adhering to the FPV potential. Our results indicate that over 50% of the analyzed reservoirs achieve a stability coefficient exceeding 0.5, leading to a less-variable output after optimization. Finally, we analyze the complementary hydro-FPV hybrid reservoirs by considering both the Pearson correlation coefficient and the stability coefficient on daily, monthly, and yearly scales. Summaries are included of locations of theoretical FPVs co-located with hydropower plants that exhibit high complementarity based on the selected metrics.

13 - HYDRO ENERGY↗

Interconnection Timelines and Costs for Distributed Energy Projects in the United States (2000-2025)

These slides summarize and explain empirical data on interconnection timelines and costs for distributed energy projects connected to U.S. utility distribution systems. The study explores how interconnection metrics vary across states, project sizes, technology types, and over time to indicate progress toward simple, fast, and affordable interconnection. Data encompasses 188 utilities in 24 states. Project types include biomass/biofuels, coal, hydropower, natural gas/oil, solar, storage, wind, hybrid, and

Chelminski, Kathryn↗

Facets of hydro power and future trends in a Nordic Context

Hydropower technologies bolster high penetration of variable renewable energies (VREs) in the net zero emissions scenarios. Nevertheless, there are various challenges to meeting the ambitious goal, such as stability, reliability, resiliency, security, lack of reactive power, voltage support and inertia, large-scale storage deployment and coordination, interconnectedness, demand-side response, higher thermal cycles with increased start/stops, and inadequate Levelized Cost of Energy (LCOE) for system-wise VRE integration and profitability. This survey conducts a bottom-up analysis to unveil the opportunities to utilize hydropower facilities and disentangle the nested problem for intertwining design features, control algorithms, operation, optimization approaches, incentives, services, and market mechanisms using a three-pillar framework perspective: grid owners, power producers, and machine designers. The survey identified emerging trends in real-time and capacity markets, flexible power systems, and enhanced grid capabilities, including advanced voltage support and updated grid codes. These developments present significant opportunities for hydropower, such as achieving super-flexibility through hybridization, expanded reactive power capabilities, and advanced operational modes like a synchronous condenser and power adequator functionalities. These opportunities require novel design philosophies — including new winding, stator, and rotor configurations, optimized ventilation, and active cooling systems — to enhance performance under stressed grid and climate conditions. Finally, integrating climate and energy models for multi-basin optimization with finer spatial and temporal granularity enhances the planning accuracy for water management of hydropower while addressing environmental challenges. The review delivers helpful prospective suggestions and tools that would serve researchers, power engineers, and stakeholders in making decisions about hydropower technologies and services in 2050 and beyond.

13 HYDRO ENERGY↗

Hybrid Power Purchase Agreements for Flexible 24/7 Energy Delivery – A Comprehensive Review of Current Practices and Research Pathways

Power Purchase Agreements (PPAs) are becoming increasingly preferred among large energy consumers, such as data centers, to secure cost-effective energy and meet accelerating demand growth. Traditionally, variable renewable energy (VRE)-based PPAs operate on a pay-as-produced basis, balancing supply and demand for a relatively longer duration (e.g., annually). However, the focus is shifting toward matching supply and demand on an hourly basis to fully meet energy needs. This shift requires the integration of flexible energy resources, such as hydropower, thermal generation, and energy storage, to complement VRE sources like wind and solar, forming the foundation for 24/7 PPA. This work contributes by: (i) reviewing emerging market trends and current practices in PPA procurement, supported by data on PPA prices and technology portfolios; (ii) synthesizing the existing literature on modeling approaches for contract pricing, quantities, hybrid resource procurement, and risk management in 24/7 PPA design, while identifying key research gaps; and (iii) proposing an integrated 24/7 PPA design framework along with two contracting mechanisms from the perspectives of both PPA providers and consumers. The proposed framework highlights critical modeling challenges, risk-allocation issues, and future research opportunities for 24/7 PPA design.

24/7↗