Search NASA⌕ Search

SEARCH · Search NASA

Results for “Reliability Integrity Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

ACCELERATED DEPLOYMENT OF NOVEL MATERIALS BASED ON RELIABILITY INTEGRITY MANAGEMENT USING CUMULATIVE DAMAGE MODELING

There is currently no widely agreed, detailed general method for licensing a novel plant incorporating novel materials (or materials being deployed in novel environments); in many such situations, there are no directly applicable engineering code cases for decision-makers (including regulators) to rely on. This paper discusses a framework for solving this problem that is based on the Reliability and Integrity Management (RIM) approach delineated in ASME BPVC Section XI Division 2. NRC Regulatory Guide 1.246, Rev. 0, endorses, with conditions, the subject portion of the 2019 ASME Code. The proposed framework is meant to support development of a licensing case by addressing certain remaining technical challenges. The framework discussed here is compatible with the Licensing Modernization Project, but applying it in a specific case will call for advances in the state of practice, if not the state of the art. The RIM approach calls for applicants to (a) allocate reliability targets to plant structures, systems, and components (SSCs), (b) show that they are able to relate the currently observed physical condition of each SSC in the program to its failure probability well enough to determine whether the target reliability allocations are being satisfied, allowing for uncertainty related to the novelty of the materials/designs/operating environments, and (c) be able to demonstrate that the proposed program of surveillances will reliably detect unacceptable degradation of an SSC before SSC failure occurs. A modeling approach potentially applicable to item (b), based on cumulative damage modeling rather than failure rates, is briefly illustrated.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Relating Measured Component Damage to Assessed Component Reliability in Reliability Integrity Management (RIM)

There is currently no widely agreed detailed general method for licensing a novel plant incorporating novel materials (or materials being deployed in novel environments); in many such situations, there are no directly applicable engineering code cases for decision-makers (including regulators) to rely on. It may be possible to develop an approach to licensing such a plant that is based on the Reliability and Integrity Management (RIM) approach delineated in ASME BPVC Section XI Division 2. NRC Regulatory Guide 1.246, Rev.0, endorses, with conditions, the subject portion of the ASME Code. But that portion of the ASME code is written at a very high level, and there are fundamental technical challenges associated with applying it literally to licensing a real plant. In the RIM approach, applicants need to do the following (among other things): • Allocate target reliabilities to structures, systems, and components (SSCs) that collectively support the top-level plant safety and availability objectives; • Understand failure modes of those SSCs, and the degradation mechanisms that could lead to those failure modes; • Develop and propose a program of surveillances that will identify degradation prior to failure of SSCs; • Provide a means of reporting results, taking actions for anomalous or undesirable conditions, and give the regulator assurance of continued safe operations. Applying RIM in a specific case will call for advances in the state of practice of relating physical observables to functional reliability of certain component types. Except where a given level of damage corresponds to a failed (or nearly failed) state, it is not practical to establish a precise quantitative relationship between physical observables and reliability. This paper focuses on managing risk of passive component failures based on observable damage parameters. A simple approach to cumulative damage modeling will be illustrated with a view to possible use in RIM applications.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Investigation and Demonstration of Reliability Target Allocation to Support Reliability and Integrity Management Program

Nuclear energy is the most reliable and environmentally sustainable energy source available today. In the United States (U.S.), nuclear-generated power accounts for approximately 20% of total electricity and over 55% of clean energy. New advanced reactors have enormous potential to help further decarbonize the energy market, enhance grid resiliency, create new jobs, and build a stronger economy. More than 50 new reactors are being developed in the U.S., and the federal government realizes an urgent need to deploy nuclear technologies to meet the country’s energy, environmental, and national security goals. As such, the U.S. Department of Energy (DOE) launched multiple programs to support advanced reactor deployment. The research described in this report explores implementation strategies for the Reliability and Integrity Management Program that directly supports the DOE goal to enable the near-term deployment of the advanced reactor technologies. The project is conducted under the Regulatory Development Program for advanced reactors sponsored by the DOE.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Reliability and Integrity Management Scoping Study

The U.S. Nuclear Regulatory Commission (NRC) is developing the regulatory framework and technical expertise to support regulatory review of advanced non-light water reactor (ANLWR) designs. The NRC staff expects most of these designs to use the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (BPVC) Section XI, Division 2 “Requirements for Reliability and Integrity Management (RIM) Programs for Nuclear Power Plants” for developing and implementing pre-service inspection (PSI) and in-service inspection (ISI) programs. The NRC recently endorsed ASME BPVC Section XI, Division 2 (BPV XI-2) in Regulatory Guide (RG) 1.246. This new ASME code is yet to be used in any applications submitted for NRC review. This report provides an overview of the current state of knowledge and practices within the industry for the use of BPV XI-2 for the development and implementation of a PSI and ISI program for non-light water reactors.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Regulatory Approach to Accelerated Deployment for New Material or Applications in Advanced Reactors

New advanced reactor developers may embark on deploying materials in novel and unique environments where a material’s long-term performance may be in question or unknown. In many cases, sufficient test data may not exist for the material in the desired application, or that no prescript or applicable regulatory testing requirements are available to demonstrate the safety of the application explicitly. This study endeavors to develop the framework for a regulatory and technical approach for safe and predictable accelerated materials use in advanced reactors guided by 10 CFR Part 50.43(e)(1), Advanced Reactor Design Criteria contained in Regulatory Guide 1.232, and Reliability Integrity Management Program (RIM) principles.

99 GENERAL AND MISCELLANEOUS↗

Management of Risks Associated with Application of Novel Materials in Novel Operating Environments in Novel Reactor Designs

There is currently no widely agreed, detailed general method for licensing a novel plant incorporating novel materials (or materials being deployed in novel environments); in many such situations, there are no directly applicable engineering code cases for decision-makers (including regulators) to rely on. This paper discusses a framework for solving this problem that is based on the Reliability and Integrity Management (RIM) approach delineated in ASME BPVC Section XI Division 2. NRC Regulatory Guide 1.246, Rev. 0, endorses, with conditions, the subject portion of the ASME Code. The proposed framework is meant to support development of a licensing case by addressing certain technical challenges. The framework discussed here is compatible with the Licensing Modernization Project, but applying it in a specific case will call for advances in the state of practice, if not the state of the art. The RIM approach calls for applicants to (a) allocate reliability targets to plant structures, systems, and components (SSCs), (b) show that they are able to relate the currently observed physical condition of each SSC in the program to its failure probability well enough to determine whether the target reliability allocations are being satisfied, allowing for uncertainty related to the novelty of the materials/designs/operating environments, and (c) be able to demonstrate that the proposed program of surveillances will reliably detect unacceptable degradation of an SSC before SSC failure occurs. These challenges are discussed in the paper, and a potentially applicable modeling approach based on cumulative damage rather than failure rates is briefly illustrated.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Distribution System Congestion Management - A Survey of Reliable Integration for Aggregated Resources and Microgrids

Rising penetration of consumer-owned Distribution Grid Resources (DGRs), increasingly managed by third party aggregators and enrolled in grid services and wholesale market programs, can create localized congestion in distribution networks. Managing these constraints is challenging due to a persistent coordination and information gap: utilities are accountable for reliability and have network topology and state visibility, while aggregators control the DGR capability needed to relieve congestion. This survey synthesizes congestion management solutions for distribution systems with high DGR penetration, covering both market-based mechanisms (distribution level markets, locational pricing, flexibility auctions) and non-market-based solutions (network reconfiguration, direct DGR control, demand response, curtailment, etc.). The literature is organized across three decision horizons: long term planning, operational planning, and real-time operation. Special attention is devoted to emerging distribution system operator architectures and coordination frameworks spanning transmission system operators, aggregators, and microgrids. Drawing on recent case studies and implementations, we distill best practices, identify key technical and economic barriers, and outline research directions. The evidence points to a shift toward integrated congestion management that combines market signals with technical controls, enabled by improved monitoring, forecasting, and closed loop control capabilities.

Active Distribution Networks (ADN)↗

ASME – Grappling with the Concept of Component Failure

ASME concepts of component failure. Definition for failure, functionality, damage tolerance, including Magnox reactors and AGRs. How ASME is addressing damage tolerance, and Section III division 5 Design, Classification, Reliability Target for SRC-1 components, Basic analysis approach, simple assessment, and full assessments, Reference to reliability and integrity management and strategy for graphite components.

36 MATERIALS SCIENCE↗

Reliable, High Power Density Inverters for Heavy Equipment Applications

With this final report, the combined team of the University of Arkansas (UA), University of Illinois, Urbana-Champaign (UIUC), Wolfspeed, Caterpillar, and Ampaire have successfully met all of their project objectives. Noteworthy for the heavy equipment portion of the project with Caterpillar is that the team made its project milestones two years into the project by designing a power dense motor drive for a permanent magnet synchronous machine. Upon finding out that Caterpillar had pivoted to switched-reluctance machines (SRMs), the team subsequently redesigned and implemented the SRM drive with a coolant temperature of 105°C! The other major task that the UA, UIUC, and Wolfspeed teams took on was the design of a PMSM drive for a hybrid aircraft that was flown on Feb. 20, 2023 by Ampaire after extensive testing and evaluation. While there were also technical objectives in thermal management, integrated gate drivers, reliability studies, and high temperature capacitors with integrated bussing, each of these have been fully reported on in quarterly reports. In brief, advances in thermal management and high temperature capacitors were utilized in order to achieve a 105°C motor drive. The integrated gate driver work resulted in a higher density drive with no loss of efficiency. Most of the last year, during a no-cost extension, was spent waiting for the Ampaire motor drive to be tested (outside of our project). Many months passed with the device just sitting in California while the company dealt with battery-related issues. This delayed the integration and testing activities until Fall 2022. Once those began, then the process took about 4-5 months to complete culminating in the test flight in Feb. 2023. By providing technical advances and integration into final platforms, the barrier to economic impact has been lowered. This project benefits the public by overcoming key technical barriers to electrified and hybrid electric heavy equipment and aircraft. This, in turn, leads to lower greenhouse gas emissions and a cleaner environment. This final report summarizes the integrated gate driver work and the Ampaire hybrid electric aircraft integration and test flight efforts. All other information has been previously reported in quarterly reports. A summary of the motor drives created during this project is provided along with a listing of publications.

42 ENGINEERING↗

RIM: Reliability and Integrity Management/ASME BPVC Section XI Division 2

Prepared at the request of the Nuclear Energy Institute (NEI) and the Joint Committee on Nuclear Risk Management's SubCommittee on Risk Applications, this slide set presents an update on some recent Reliability and Integrity Management (RIM) Subgroup work to respond to industry questions on American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Division 2. If approved, the briefing will be given at an upcoming workshop of the Nuclear Energy Institute (February 18-20, Washington, DC) and at an upcoming meeting of the Joint Committee on Nuclear Risk Management's SubCommittee on Risk Applications (February 25-26, College Park, MD).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Integrated Large-Scale Data Management Platform for Photovoltaic Power Conversion Equipment (PCE) Reliability Data

To meet the demand for accuracy and real-time capability of PV system degradation evaluation, massive volume data is needed to run high-fidelity and high-efficiency simulations and perform advanced data analysis. However, PV farm operators have a series of difficulties with PV inverter data, such as data collection from multiple channels, massive data storage, data management and massive data analysis. To address these challenges, we developed an integrated data management platform capable of data acquisition, processing, storage, query, and performing big data analysis utilizing AI algorithms. The platform can also achieve data correctness verification and provide an effective distributed data management solution to retrieve massive data and establish a connection to distributed computational frameworks.

data management platform↗

Integrated Large-Scale Data Management Platform for Photovoltaic Power Conversion Equipment (PCE) Reliability Data: Preprint

To meet the demand for accuracy and real-time capability of PV system degradation evaluation, massive volume data is needed to run high-fidelity and high-efficiency simulations and perform advanced data analysis. However, PV farm operators have a series of difficulties with PV inverter data, such as data collection from multiple channels, massive data storage, data management and massive data analysis. To address these challenges, we developed an integrated data management platform capable of data acquisition, processing, storage, query, and performing big data analysis utilizing AI algorithms. The platform can also achieve data correctness verification and provide an effective distributed data management solution to retrieve massive data and establish a connection to distributed computational frameworks.

data management↗

VA EDH Advanced Software Pipeline Framework Report: Enhancing Automation and Scalability

The VA Environmental Determinants of Health (EDH) Advanced Software Pipeline Framework is designed to enhance the efficiency, scalability, and security of geospatial data processing workflows. This framework integrates modern data orchestration and containerization technologies, including Prefect for workflow automation, Docker for containerization, and PostgreSQL/PostGIS for geospatial data storage and analysis. It ensures standardized, reproducible, and automated data processing, supporting VA objectives related to substance use risk assessment and recovery research. The pipeline addresses key scalability and performance challenges through horizontal and vertical scaling, high-performance computing (HPC) integration, parallel processing, task caching, and dynamic resource allocation. These optimizations improve throughput and reduce latency, allowing the system to efficiently manage large and complex datasets. Additionally, security and compliance measures—such as data encryption (SSL), Role-Based Access Control (RBAC), and adherence to GDPR and HIPAA standards—safeguard sensitive information throughout data transmission and storage. A key implementation of this framework includes the automation of shelter list geolocation workflows, ensuring that up-to-date data is readily available for VA decision-making. Lessons learned from this project include the transition from in-memory processing to incremental storage writes, improving resource management and reliability. Future enhancements aim to expand automation, integrate AI-driven anomaly detection, and incorporate high-performance computing resources. This framework provides a scalable, secure, and adaptable solution for managing geospatial datasets, reinforcing the VA’s ability to support clinical and strategic initiatives through data-driven decision-making.

97 MATHEMATICS AND COMPUTING↗

Assessing thermal comfort and participation in residential demand flexibility programs

Residential space-conditioning-based demand flexibility (DF) has become an increasingly sought-after method for demand-side load management to enhance grid reliability and facilitate integration of renewable energy generation. However, predicting the effectiveness and flexibility of residential DF resources is challenging due to the variability in household energy use behaviors. Current estimates show that only 50 % of projected savings from DF resources are actualized due to regulatory, technological, and social barriers. From a household perspective, concerns over thermal comfort during space conditioning-based DF events significantly impact participation decisions. Currently, there is a very limited understanding of how thermal comfort during space-conditioning-based DF events in real-world settings impacts household energy use behaviors and, consequently, the success of DF programs in achieving targeted savings. This paper proposes a method to comprehensively assess the thermal comfort implications of DF strategies and presents results of their impacts on DF event participation decisions and demand savings. Here, the proposed method was applied to a heat pump DF field study in Cordova, Alaska. The study’s key findings are: 1) DF event setpoint offsets that maintain indoor operative temperatures between 18 to 22 °C (65 to 71°F) may be preferred in Cordova, Alaska; 2) Household-level thermal comfort is more sensitive to the duration of the DF event than to the degree of temperature offset from baseline conditions; 3) The delayed impact of changes in indoor operative temperature in response to setpoint offsets, both during and after a DF event, influences occupants’ thermal comfort perceptions and willingness to persistently participate in events. The findings from application of the proposed method can help inform future larger-scale occupant-centric DF programs as it can capture information not readily available through utility and device-level energy use data. Thus, it can supplement these sources and help program administrators develop occupant-centric DF strategies, enabling more accurate predictions of participation rates and savings estimates for space-conditioning-based DF programs.

Demand side management↗

Development of Human and Technology Integration Guidance for Work Optimization and Effective Use of Information

Existing nuclear power contributes to roughly 20% of the total electricity generation, and consistently provides the highest capacity factor of any other electricity generating resource in the United States. Despite these advantages, the existing nuclear power plant fleet in the United States has been enduring significant challenges in providing electricity in a cost-competitive manner, which has ultimately threatened the long-term economic viability of these plants. A major contributor to these increased operating and maintenance costs has been the continued reliance of a large workforce who perform their work under an operating model that has largely remained unchanged since the commissioning of these nuclear power plants. Unfortunately, while this operating model has provided safe and reliable electricity, other industries have already began transforming their workforce through the use of advanced digital technology and automation that has reduced their operating and maintenance cost significantly. In order for the United States nuclear industry to remain economically viable, a similar transformation must be considered in which digital technologies and automation capabilities are brought in to support key plant functions across all work functions across plant operation, maintenance, and support. To effectively integrate digital technology and automation in the existing nuclear power plant operating model, a multidisciplinary approach is needed that addresses technological and sociotechnical (i.e., human and technology integration) considerations. This report describes an extension to the human and technology integration methodology, herein referred to as Human Integration and Technology Task Force for Work Management Optimization (HITT), to support the safe, reliable, and efficient use of proposed innovations with the intended users in their intended environment to perform their intended tasks. By effectively incorporating human and technology integration into a plant modernization effort by using HITT, we believe that a utility can significantly improve work performance and overall workforce quality of life. For instance, if HITT is performed to optimize work management, scheduling performance and scope stability can be improved by up to 10%. HITT enables these benefits through developing a rich understanding of the work being performed, the utility’s vision, and the opportunities that provide greatest value to optimize performance through a 10-step process illustrated below as a quick guide. The quick guide contains links in the righthand side of each step that allows for navigation to the detailed section (Section 4) of HITT in this technical report.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

INTEGRATION OF DATA ANALYTICS WITH SYSTEM HEALTH PROGRAMS

Industry equipment reliability and asset management programs are essential elements that help ensure the safe and economical operation of nuclear power plants. The effectiveness of these programs is addressed in several industry developed and regulatory programs. However, these programs have proven to be labor intensive and expensive. There is an opportunity to significantly enhance the collection, analysis, and use of this information to provide more cost-effective plant operation. Additionally, there is an acute industry need to leverage advanced technology to reduce costs and improve operational effectiveness. The goal of this paper is to provide effective and efficient analytical methods and tools to support risk-informed decisions for the equipment reliability and asset management programs at nuclear power plants. This is accomplished by creating a direct bridge between component health/lifecycle data and decision making (e.g., maintenance scheduling and project prioritization). Here we are supporting typical system engineer decisions regarding maintenance activity scheduling and component ageing management. This is performed in a risk-informed context where herein the term “risk” is broadly constructed to include both plant reliability and economics. This framework combines data analytics tools to analyze equipment reliability data with risk-informed methods designed to support system engineer decisions (e.g., maintenance and replacement schedules, optimal maintenance posture) in a customizable workflow. A challenge is that the structure of this workflow strongly depends on the decision that needs to be made, the type of data available, and the constraints that need to be considered. Current methods are designed to provide specific answers to specific problems; however, these methods might prove to be inadequate even when problem settings slightly change (e.g., different types of requirements, additional dependencies between system reliability and economics). We tackled this challenge by designing framework in a flexible and modular fashion such that the user can assemble and customize his/her own workflow that integrates SSC economic lifecycle models (e.g., maintenance and replacement costs), system reliability models, and optimization methods.

97 - MATHEMATICS AND COMPUTING↗

ASEAN Technical Exchange Workshop for System Operators, Regulators, and Policymakers

This presentation provides an in-depth exploration of power system planning, cross-border electricity trading, and battery energy storage systems (BESS), offering actionable insights for system operators, regulators, and policymakers. The first section delves into power system planning and analysis, focusing on capacity expansion models and resource adequacy studies, including their role in optimizing system efficiency, managing emissions, and addressing system reliability risks. Key considerations, such as integration of transmission into generation planning and the forecasting versus optimization of customer distributed energy resources (DER) technologies, are explored. The session highlights critical trade-offs in spatial granularity and model runtimes, as well as the feasibility of aligning distribution investments with capacity expansion efforts. The second section examines cross-border electricity trading, with an emphasis on resource adequacy concepts such as reliability targets, loss of load expectation (LOLE), and planning reserve margins (PRM). Case studies on reserve market design and coordination across US regions provide insights into improving reserve deliverability and managing interregional power balance and congestion. This section also addresses market-to-market congestion management, including advanced strategies for high-voltage direct current (HVDC) optimization and ancillary service delivery. Finally, the presentation covers the rapid evolution of Battery Energy Storage Systems (BESS), highlighting their operational growth, regulatory frameworks, and use cases in grid flexibility, energy storage, and reliability. The discussion focuses on the benefits of BESS for system stability, resilience, and integration of renewable energy, offering insights into its role as a vital component in the transition toward a more sustainable and flexible grid. Key performance parameters, such as throughput, round-trip efficiency, and state of charge, are also examined.

25 ENERGY STORAGE↗