Search NASA⌕ Search

SEARCH · Search NASA

Results for “project procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

E2C Cohorts: Overview of Project Procurement, Performance Monitoring, and O&M [Slides]

The Energy to Communities (E2C) peer-learning cohort program provides technical assistance to groups of 15 community entities around a common energy topic over the course of 6 months. Every month, participants join a virtual meeting where they hear from experts and exchange strategies and best practices with their peers. This cohort, "Successful Energy Project Implementation" will explore common challenges in implementing energy projects and learn strategies to turn project plans into reality. Each participant will focus on a local energy project or priority as a cornerstone for their learning throughout the series. This presentation is focused on project performance, monitoring, and O&M. This workshop is on May 27.

14 SOLAR ENERGY↗

Comparing Offshore Wind Energy Procurement and Project Revenue Sources Across U.S. States

The pace of offshore wind energy procurement in the United States has rapidly accelerated in recent years. U.S. states along the Atlantic Coast have set procurement goals for offshore wind energy to meet renewable portfolio standards and serve state policy needs. By the end of 2019, projects with a total capacity of 6.4 gigawatts (GW) had established long-term contracts (or equivalent regulatory requirements) with utility off-takers. The prices established in these contracts since 2017 have been well below expectations from many industry observers, prompting stakeholders to compare price levels across U.S. states and globally. However, comparing procurement prices across projects and jurisdictions is often challenging because of differences in project parameters, support regimes, supply chains, and the applicable tax and regulatory environment. These characteristics provide critical context for understanding project revenue streams, delivery obligations, and risk allocation, which need to be accounted for when comparing across different projects. In combination, variation in these characteristics between projects results in measurable differences in project costs and revenues and, consequently, in different offer bids. In this report, we systematically analyze offshore wind energy support regimes across U.S. states. Because offshore wind energy procurement prices from U.S. projects are often compared not only among states but also with European tenders, this report also provides an overview of support regimes and taxonomy used in European offshore wind markets. The content of this report was derived from a literature review, primarily regulatory filings and summary reports, and 16 interviews with leading industry experts from state agencies, energy sector consultancies, and law practices. The comparison between U.S. states focuses on several dimensions, including statutory authority, solicitation procedures, procurement goals and awards, and the structuring of physical and transactional delivery of energy services.

17 WIND ENERGY↗

Moving the Mission Forward with Renewable Energy

Presentation gives an overview of proven examples of renewable energy technologies. Learn how to properly utilize renewable energy technologies; research, select, fund, and deploy renewable technologies; best operate and maintain the federal government’s fleet of on-site solar photovoltaic (PV) systems; and learn best practices to detect and address performance issues with a PV system.

distributed energy↗

Financing Microgrids in the Federal Sector

Recent high-impact events such as hurricanes and wildfires highlight the need for energy system resilience. One potential impact of these events is the loss of utility grid power to federal sites, negatively affecting the ability to carry out their missions. Depending on the need to sustain critical functions, it may be important to continue operations during an outage of the electric grid, or at least have power restored quickly after the event. One approach to addressing this need is through a microgrid. Microgrids can provide a more reliable solution than the traditional approach of using a backup generator at individual buildings. A microgrid can enhance a site’s electrical power system during normal operations, as well as provide reliable backup power to critical loads when electric utility power is interrupted. Many times, certain components of a microgrid (and potentially the entire system) can be justified economically and paid for out of energy savings or avoided costs. In cases where savings can cover the project costs, one of several privately financed procurement mechanisms may be used to implement the project. Procurement options available to all federal agencies include utility energy services contracts (UESC), energy savings performance contracts (ESPC), and utility services contracts (USC); other mechanisms such as a power purchase agreement (PPA), enhanced use lease (EUL), and utility privatization (UP) may also be useful to agencies that have the authority to use them. Implementing a microgrid in a comprehensive effort that also includes energy efficiency can provide an important savings component, while reducing power requirements for critical loads, thus reducing the cost of the microgrid and associated distributed energy resources (DER). However, it can be difficult to achieve enough savings and avoided costs to cover the entire microgrid system, so leveraging these avoided costs in combination with appropriated funds may be necessary to implement the full project. When a site is deciding if a microgrid is the best solution, activities early in the process include identifying critical loads and existing DERs, conversations with the local electric utility, and implementation options that work best for the agency and site. This paper explores procurement options and agreements that may be useful to federal agencies interested in implementing microgrids at their sites. Microgrid complexities, implementation considerations, and suggestions to get started are also discussed. This information will be most useful to agencies when they are exploring electric energy system resilience options and/or considering different procurement options to meet their needs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Financing Microgrids in the Federal Sector

Recent high-impact events such as hurricanes and wildfires highlight the need for energy system resilience. One potential impact of these events is the loss of utility grid power to federal sites, negatively affecting the ability to carry out their missions. Depending on the need to sustain critical functions, it may be important to continue operations during an outage of the electric grid, or at least have power restored quickly after the event. One approach to addressing this need is through a microgrid. Microgrids can provide a more reliable solution than the traditional approach of using a backup generator at individual buildings. A microgrid can enhance a site’s electrical power system during normal operations, as well as provide reliable backup power to critical loads when electric utility power is interrupted. Many times, certain components of a microgrid (and potentially the entire system) can be justified economically and paid for out of energy savings or avoided costs. In cases where savings can cover the project costs, one of several privately financed procurement mechanisms may be used to implement the project. However, it can be difficult to achieve enough savings and avoided costs to cover the entire microgrid system, so leveraging these avoided costs in combination with appropriated funds may be necessary to implement the full project. This paper explores procurement options and agreements that may be useful to federal agencies interested in implementing microgrids at their sites. Microgrid complexities, implementation considerations, and suggestions to get started are also discussed. This information will be most useful to agencies when they are exploring electric energy system resilience options and/or considering different procurement options to meet their needs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Magnetic Gears: The Key to Robust, Cost-Effective Hydropower Drivetrains

Based on previous demonstrated success at fabricating 5 and 10 kW scale magnetic gearbox (MGB) prototypes, Emrgy and its partners (the project team) proposed to design and construct a 100 kW scale MGB with a 30:1 gear ratio for the low-head hydro applications. The Statement of Project Objectives included tasks covering: 1) Market Applicability; 2) Technical Metrics; 3) Design (initial); 4) Electromagnetic (EM) Load and Structural Analysis; 5) Modal Analysis; 6) Sealing Design and 7) Final Design during Budget Period 1. Budget Period 2 included tasks covering: 1) Materials Procurement and Test Plan Development; 2) Assembly; and 3) Testing. The Market Applicability study (Task 1) led to a clear conclusion and recommendation toward “Low Head” technologies for maximum market share of both New Stream Reach development as well as powering Non-Powered Dams. The findings of this study also identified the opportunity for a larger scale magnetic gearbox-based drive train as a function of increased torque, as opposed to increased speed. The Technical Metrics Study (Task 2) concluded a horizontal orientation was preferred, examined potential loss mechanisms, concluded that a Halbach Array magnetic design was preferred, established a 30:1 gear ratio as optimal, and established a power rating of 100 kW as optimal. The subsequent initial and final detailed design process included electro-magnetic (EM) load and structural analysis (Task 4), a Modal analysis (for vibration) (Task 5), and a sealing design (Task 6) to assure water impermeability. The final design package (Task 7) included 729 individual parts, 117 unique part numbers, and 15 assemblies. In order to facilitate procurement, the full bill of materials was broken down into several sub-components: 1) custom magnetic parts; 2) custom machined parts; 3) custom casted parts; and 4) commercial off the shelf (COTS) parts. The casted parts were fabricated by Oak Ridge National Laboratory (ORNL) via a Cooperative Research and Development Agreement (CRADA) with Emrgy and funded by the Advanced Manufacturing Office (AMO). The procurement effort (Task 8) ultimately covered three time periods based on challenges encountered in meeting the budgeted cost for the prototype. Following the first effort in the early stages of Budget Period 2 in 2017, a no-cost time extension was granted to seek alternative fabrication and procurement options. The project was re-booted in 2020 based on the new ORNL CRADA that would focus on five (5) of the more difficult and expensive parts using their advanced manufacturing expertise. Procurement efforts for the other custom machined parts resulted in quotations that still exceeded the budget by more than $\$$100k. This was, in part, also due to the concurrent COVID-19 pandemic that caused both supply chain disruptions and labor shortages. As the project continued, pricing and availability degraded further. In Q2 FY’22, it was decided to not proceed with the fabrication of the prototype (Task 9) based on budgetary limitations. Outcomes included a full and detailed design of a 100 kW magnetic gearbox and associated indented bill of materials (BOM) and CAD drawings, a full assembly instruction manual with an associated BOM for materials necessary to support assembly, the fabrication of the double Halbach magnetic array for the rotor/stator system, fabrication of five (5) sand-casted/machined parts (via CRADA with ORNL) and an initial draft of a comprehensive testing plan. The most significant non-outcome was the actual fabrication and testing of the prototype gearbox based on budget limitations. Lessons learned included the need for an Application / Design / Cost trade analysis to better elucidate the cost potential of the MGB in the projected volumes anticipated for future demand. This would better establish the efficacy of the original cost target ($\$$0.80/Watt) and/or the need for reconsideration of designs and applications. Likewise, additional consideration of the prototype nature of the gearbox – single use, short lifetime, etc. - either as a separate exercise or in place of the design process completed, to reduce the cost of the demonstration prototype device. Additionally, project continuity was cited as a significant risk based on the loss of the primary design engineering firm after Budget Period 1. A design analysis exercise was conducted at the conclusion of the project to identify potential areas for cost reduction. One concept considered was the removal of the inner ring of magnets (with associated changes in the outer ring magnets) to enable a horizontal collapse of the design. It was estimated this could reduce cost by 10-25% without impacting performance.

13 HYDRO ENERGY↗

SEIN: Breaking Barriers Resilient Energy System Analysis [Slides]

The Solar Energy Innovation Network (SEIN) is a collaborative research program that supports multi-stakeholder teams in researching and sharing solutions to real-world challenges associated with solar energy adoption. The Breaking Barriers project was selected to participate in the Solar Energy Innovation Network, Round 2, and was led by Groundswell, a D.C.-based clean energy project developer. The Breaking Barriers team included Partnership for Southern Equity, Atlanta University Center campus facility managers and professors, the City of Atlanta's Neighborhood Planning Unit T, and Georgia Power Company. The project aimed to design and construct innovative urban energy resiliency hubs integrating microgrid technology, solar generation, and energy storage in Atlanta colleges and communities. The hubs will help these historically Black colleges and universities (HBCUs) and the energy-burdened broader community in West Atlanta be more resilient, in addition to informing new course curricula at Atlanta University Center campuses. With many possible options for the system's battery size, the Breaking Barriers team needed insight into the relationships between BESS size, economic performance, and resilience at Spelman College's Manley Center. These insights are crucial for entering procurement negotiations with project developers, establishing resilience capabilities that the HBCU campuses can plan around, and guiding the team's fundraising targets. This analysis includes estimates of PV and battery performance, costs, savings, and resilience for multiple battery sizes. In order to provide power during a grid outage, the resilient energy system also needs to be connected to the Manley Center in a safe and island-able manner (electrically isolated from the grid). Analysis of potential electrical configurations and estimated setup costs is key to successfully entering a required interconnection agreement with Georgia Power, as well as informing requests for engineering firms to construct the system. This analysis includes conceptual options and rough order of magnitude cost estimates for electrically interconnecting the resilient energy system to the Manley Center and the grid. The Breaking Barriers team used this analysis to select preferred system characteristics and design for the resilient energy system.

14 SOLAR ENERGY↗

Final Design for Thermal/Epithermal eXperiments (TEX) with Lithium Absorbers to Provide Validation Benchmarks for Y-12 Electrorefining Facility

One of the main goals of the Thermal/Epithermal eXperiments (TEX) project is to use existing Nuclear Criticality Safety Program (NCSP) assets to create critical experiment plutonium and uranium test beds for materials important to criticality safety that have insufficient benchmark evaluations. The plutonium test bed experiments were completed in 2018 and are published in the 2020 edition of the International Criticality Safety Benchmark Evaluation Project (ICSBEP) Handbook. The uranium test bed assemblies were completed in 2023 and accepted in the 2024 edition of the ICSBEP Handbook. The Nuclear Criticality Safety (NCS) group at Y-12 National Security Complex has identified programmatic need for validation cases for uranium electrorefining operations at Y-12. The electrorefining operation credits lithium enriched in 6 Li in addition to 35 Cl as absorbers in the design criticality safety evaluation for precluding criticality under upset conditions in the large and geometrically unfavorable electro-refiner. There is, however, inadequate experimental validation for the 6 Li absorbers. As an extension of the TEX uranium test bed, TEX-Cl critical experiments were performed with sodium chloride salt to address the 35 Cl thermal absorption as well as other validation needs at Los Alamos National Laboratory (LANL). These experiments were completed in 2024 and accepted into the 2025 ICSBEP Handbook. To continue the methodology used in TEX-Cl, TEX-Li aims to accomplish the same. The overall design of both experiments was to use commercially available, high purity, salts with polyethylene moderator and HEU plates to configure a critical assembly. Three experiments are planned for TEX-Li using encapsulated lithium carbonate (Li 2 CO 3 ), with natural 6 Li abundance. For all experiments, the highly enriched uranium (HEU) Jemima plates will be used as fissile material. Multiple layers will be stacked together with encapsulated Li 2 CO 3 alternated with polyethylene in standard configurations. Standard stacking was found to be optimal in matching the different sensitivity profiles provided by the Y-12 models. Three configurations are proposed with varying polyethylene moderation and a constant 1/4” absorber thickness. The first uses 11 layers of 5/4” polyethylene, the second uses 9 layers of 3/4” polyethylene, and the third uses 10 layers of 1/2” polyethylene. Calculations showed that some alternative forms of lithium-based materials provided slightly less-optimal sensitivity profiles when compared to lithium carbonate but come with other drawbacks. These alternatives included lithium aluminate (LiAlO 2 ), Aluminum-2050 alloy, Aluminum-8090, Aluminum-2095, lithium hydride (LiH), and lithium fluoride (LiF). Lithium aluminate and aluminum-2050 provided comparable sensitivity profiles when compared to lithium carbonate and can be used instead if lithium carbonate cannot be readily procured. After a broad material study, lithium carbonate outperformed any alternative material with a balance in affordability and workability. The assessment of experimental uncertainties of the non-absorber and absorber components was predicted to be 0.00089 and 0.00093 Δk eff , respectively. The largest uncertainties may be reduced with precision dimensional inspection of the components. Many of the parts and equipment for IER 575 have already been fabricated or procured for previous projects and therefore do not contribute significantly to the overall cost of this experiment. This includes the Jemima plates and Comet critical assembly machine, which are existing NCSP assets, as well as the aluminum platen and polyethylene reflector rings, which were fabricated and authorized for the TEX experiment involving HEU with polyethylene. Lithium carbonate containers will be procured by LANL and will be filled by LLNL. The total material costs for TEX-Li experiments are estimated to be on the order of $\$$47,400. Precision inspection, including dimensional, mass, density, and impurity, is recommended for all components for an estimated cost of $\$$12,000.

35Cl↗

Offshore Wind Technology Data Update (2019) [Slides]

The 2019 Offshore Wind Technology Data Update compiles information from peer-reviewed literature, market reports, press releases, industry news reports, manufacturer specification sheets, and offshore wind project announcements to provide a comprehensive snapshot of the state of the global wind industry in 2019. These data, including capacity projections, project characteristics, technology trends, and cost estimates, are categorized, tabulated, and plotted to provide easily recognizable and understandable summaries. A particular focus is given to the United States offshore wind project pipeline, including project announcements, state procurements, deployment timelines, infrastructure investments, grid interconnections, and other related developments. The update is intended to be used as a reference document by researchers, analysts, industry practitioners, and government officials.

17 WIND ENERGY↗

Icy Moon Project (Final Report)

For this Icy Moon project, we designed, procured, built, tested and used a compact ICI instrument. This instrument has several technical advances, including a compact form factor that uses fiber arrays to relay light to six APDs. This enables a single data acquisition to measure eleven unique baselines simultaneously. The DAQ is well-synchronized and provides a path forward to even more channels. The combination of a bright LED, a sinusoidal target and cylindrical optics enables high-SNR measurements based on a known formula: a 25-ms measurement should have an SNR of 188 on the baseline zero signal. This rapid measurement time should enable two-dimensional operation and obviate the impact of temperature drifts. However, the experiment did not detect a coherence signal on any baseline (see Section Single-shot measurement results).

47 OTHER INSTRUMENTATION↗

Supply Chain Risk Mitigation for Scientific Facilities and Tools

In November 2021, the U.S. Department of Energy (DOE) Office of Science (SC) convened a roundtable on “Supply Chain Risk Mitigation for Scientific Facilities and Tools” to gather information about current supply chain challenges in key technology areas unique to SC or critical to its mission. The roundtable brought together technical, project management, and procurement experts from DOE national laboratories, industry, academia, and other government agencies. Panelists explored opportunities, possible partnerships, and mechanisms to strengthen the domestic supply chain for critical SC technologies.

99 GENERAL AND MISCELLANEOUS↗

Performance Testing of a Moving-Bed Gasifier Using Coal, Biomass, and Waste Plastic Blends to Generate White Hydrogen

The objective of this DOE-funded project by the Electric Power Research Institute, Inc. (EPRI), Hamilton Maurer International (HMI) and Sotacarbo S.p.A. (Sotacarbo), is to qualify coal, biomass, and plastic waste blends based on performance testing of selected pellet recipes in a pilot-scale updraft moving-bed gasifier. The testing will provide relevant data to advance the commercial-scale design of the moving-bed gasifier to be able to successfully use these feedstocks to produce hydrogen. In particular, the effects of the waste plastics on feedstock development (i.e., blending and pelletizing) and the resulting products (i.e., syngas compositions, organic condensate production, and ash characteristics) are a focus. The gasifier is Hamilton Mauer International, Inc. (HMI)’s moving-bed gasifier, which has been proven capable of gasifying nearly all coal ranks. It has also shown the ability in prior testing work to gasify wood chips. However, mixtures of these fuels with plastic wastes have not been prepared and gasified together. The feedstocks will be prepared by California Pellet Mill (CPM) under contract to HMI. The technical tasks and current status for this two-year research project are: Feed Procurement and Preparation: Nine different feedstocks were prepared from varying compositions of PRB coal, corn stover biomass, and car fluff waste plastics. Fuel pellets were produced by California Pellet Mill and shipped to Sotacarbo’s test facility in Italy. Test Plan Development: A test plan was created to define the test runs to be performed. The test plan detailed the different tests that were run, instrumentation used, extractive samples taken, and relevant figures of merit. Gasifier Testing: Tests are currently being performed in the pilot-scale gasifier at Sotacarbo using nine different fuel feedstocks generated from varying mixtures of coal, biomass, and plastic wastes. The testing will provide information on gasification reaction efficiency/performance, yielding relevant data for models used to scale up the gasifier design. This task will also include work to reassemble the gasifier at Sotacarbo and perform a baseline 100% coal run. Data Analysis and Reporting: Review of the data, determination of figures of merit, and interpretation of the results to be reported. The results will be used to specify the range of feedstock blends that can be successfully gasified as well as quantify gasifier outputs based on specific blends. This paper will be summarize the pelletizing procedure that insures the viability of the tri-fuel pellets for the gasification runs that are being performed at Sotacarbo’s 30mm up draft moving bed gasifier. Initial gasification tests have been conducted, and all the lab scale tri-fuel pellet gasification runs will be completed by the fall of 2022. Performance data will enable modeling of a full-scale HMI industrial scale gasifier supporting both CHP and Hydrogen production.

01 COAL, LIGNITE, AND PEAT↗

Performance Testing of a Moving Bed Gasifier Using Coal, Biomass, and Waste Plastic Blends to Generate White Hydrogen

The objective of this DOE-funded project by the Electric Power Research Institute, Inc. (EPRI), Hamilton Maurer International (HMI) and Sotacarbo S.p.A. (Sotacarbo), is to qualify coal, biomass, and plastic waste blends based on performance testing of selected pellet recipes in a pilot-scale updraft moving-bed gasifier. The testing provides relevant data to advance the commercial-scale design of the moving-bed gasifier to be able to successfully use these feedstocks to produce hydrogen. In particular, the effects of the waste plastics on feedstock development (i.e., blending and pelletizing) and the resulting products (i.e., syngas compositions, organic condensate production, and ash characteristics) are a focus. The gasifier is Hamilton Mauer International, Inc. (HMI)’s moving-bed gasifier, which has been proven capable of gasifying nearly all coal ranks. It has also shown the ability in prior testing work to gasify wood chips. However, mixtures of these fuels with plastic wastes had not yet been prepared and gasified together. The feedstocks were prepared by California Pellet Mill (CPM) under contract to HMI. The technical tasks for this research project included: • Feed Procurement and Preparation: Nine different feedstocks were prepared from varying compositions of PRB coal, corn stover biomass, and car fluff waste plastics. Fuel pellets were produced by California Pellet Mill (CPM) and shipped to Sotacarbo’s test facility in Italy. • Test Plan Development: A test plan was created to define the test runs to be performed. The test plan detailed the different tests that were run, instrumentation used, extractive samples taken, and relevant figures of merit. • Gasifier Testing: Tests were performed in the pilot-scale gasifier at Sotacarbo using nine different fuel feedstocks generated from varying mixtures of coal, biomass, and plastic wastes. The testing provides information on gasification reaction efficiency/performance, yielding relevant data for models used to scale up the gasifier design. This task will also included work to reassemble the gasifier at Sotacarbo and perform a baseline 100% coal run. • Data Analysis and Reporting: Review of the data, determination of figures of merit, and interpretation of the results was reported. The results can be used to specify the range of feedstock blends that can be successfully gasified as well as quantify gasifier outputs based on specific blends. The tri-fuel pelletizing conducted at CPM and gasification testing results from Sotacarbo’s 30mm up draft moving bed gasifier are significant. Providing data for an established gasifier to help accelerate its updated design to be able to accommodate feedstocks composed of coal, biomass, and plastic waste. This should ultimately lead to development and commercialization of a lower cost, white hydrogen generation system.

01 COAL, LIGNITE, AND PEAT↗

Performance Testing of a Moving-Bed Gasifier Using Coal, Biomass, and Waste Plastic Blends to Generate White Hydrogen

The objective of this DOE-funded project by the Electric Power Research Institute, Inc. (EPRI), Hamilton Maurer International (HMI) and Sotacarbo S.p.A. (Sotacarbo), is to qualify coal, biomass, and plastic waste blends based on performance testing of selected pellet recipes in a pilot-scale updraft moving-bed gasifier. The testing provides relevant data to advance the commercial-scale design of the moving-bed gasifier to be able to successfully use these feedstocks to produce hydrogen. In particular, the effects of the waste plastics on feedstock development (i.e., blending and pelletizing) and the resulting products (i.e., syngas compositions, organic condensate production, and ash characteristics) are a focus. The gasifier is Hamilton Mauer International, Inc. (HMI)’s moving-bed gasifier, which has been proven capable of gasifying nearly all coal ranks. It has also shown the ability in prior testing work to gasify wood chips. However, mixtures of these fuels with plastic wastes had not yet been prepared and gasified together. The feedstocks were prepared by California Pellet Mill (CPM) under contract to HMI. The technical tasks for this research project included: • Feed Procurement and Preparation: Nine different feedstocks were prepared from varying compositions of PRB coal, corn stover biomass, and car fluff waste plastics. Fuel pellets were produced by California Pellet Mill (CPM) and shipped to Sotacarbo’s test facility in Italy. • Test Plan Development: A test plan was created to define the test runs to be performed. The test plan detailed the different tests that were run, instrumentation used, extractive samples taken, and relevant figures of merit. • Gasifier Testing: Tests were performed in the pilot-scale gasifier at Sotacarbo using nine different fuel feedstocks generated from varying mixtures of coal, biomass, and plastic wastes. The testing provides information on gasification reaction efficiency/performance, yielding relevant data for models used to scale up the gasifier design. This task will also included work to reassemble the gasifier at Sotacarbo and perform a baseline 100% coal run. • Data Analysis and Reporting: Review of the data, determination of figures of merit, and interpretation of the results was reported. The results can be used to specify the range of feedstock blends that can be successfully gasified as well as quantify gasifier outputs based on specific blends. The tri-fuel pelletizing conducted at CPM and gasification testing results from Sotacarbo’s 30mm up draft moving bed gasifier are significant. Providing data for an established gasifier to help accelerate its updated design to be able to accommodate feedstocks composed of coal, biomass, and plastic waste. This should ultimately lead to development and commercialization of a lower cost, white hydrogen generation system.

01 COAL, LIGNITE, AND PEAT↗

Gasification of Mixed Blends of Coal, Biomass, and Plastic Waste

The objective of this DOE-funded project by the Electric Power Research Institute, Inc. (EPRI), Hamilton Maurer International (HMI) and Sotacarbo S.p.A. (Sotacarbo), is to qualify coal, biomass, and plastic waste blends based on performance testing of selected pellet recipes in a pilot-scale updraft moving-bed gasifier. The testing provides relevant data to advance the commercial-scale design of the moving-bed gasifier to be able to successfully use these feedstocks to produce hydrogen. In particular, the effects of the waste plastics on feedstock development (i.e., blending and pelletizing) and the resulting products (i.e., syngas compositions, organic condensate production, and ash characteristics) are a focus. The gasifier is Hamilton Mauer International, Inc. (HMI)’s moving-bed gasifier, which has been proven capable of gasifying nearly all coal ranks. It has also shown the ability in prior testing work to gasify wood chips. However, mixtures of these fuels with plastic wastes had not yet been prepared and gasified together. The feedstocks were prepared by California Pellet Mill (CPM) under contract to HMI. The technical tasks for this research project included: • Feed Procurement and Preparation: Nine different feedstocks were prepared from varying compositions of PRB coal, corn stover biomass, and car fluff waste plastics. Fuel pellets were produced by California Pellet Mill (CPM) and shipped to Sotacarbo’s test facility in Italy. • Test Plan Development: A test plan was created to define the test runs to be performed. The test plan detailed the different tests that were run, instrumentation used, extractive samples taken, and relevant figures of merit. • Gasifier Testing: Tests were performed in the pilot-scale gasifier at Sotacarbo using nine different fuel feedstocks generated from varying mixtures of coal, biomass, and plastic wastes. The testing provides information on gasification reaction efficiency/performance, yielding relevant data for models used to scale up the gasifier design. This task will also included work to reassemble the gasifier at Sotacarbo and perform a baseline 100% coal run. • Data Analysis and Reporting: Review of the data, determination of figures of merit, and interpretation of the results was reported. The results can be used to specify the range of feedstock blends that can be successfully gasified as well as quantify gasifier outputs based on specific blends. The tri-fuel pelletizing conducted at CPM and gasification testing results from Sotacarbo’s 30mm up draft moving bed gasifier are significant. Providing data for an established gasifier to help accelerate its updated design to be able to accommodate feedstocks composed of coal, biomass, and plastic waste. This should ultimately lead to development and commercialization of a lower cost, white hydrogen generation system.

01 COAL, LIGNITE, AND PEAT↗

Autonomous Hydrogen Fueling Station

This project “Autonomous Hydrogen Fueling Station” covered the autonomous refueling with both gaseous hydrogen and liquid hydrogen. The part on gaseous hydrogen focused on the development of an autonomous robotic fueling arm that would couple to a fuel cell engine for hydrogen refueling without guidance from the forklift operator and budget period. Research was also covered for the robotic fueling with a commercial vehicle. The second phase of the project created the baseline for an autonomous liquid hydrogen transfer system that would minimize boil off losses by operating at thermodynamically efficient state points. For the development of the robotic fueling arm, testing was conducted to establish a baseline measurement of the accuracy and repeatability of a human operator positioning a lift truck in front of a dispenser. The goal was to establish the range of motion required for an autonomous fueling mechanism to mate a hydrogen nozzle with a receptacle on a fuel cell system installed in a forklift. The final design comprised a selective compliance articulated robot arm (SCARA)-type mechanism with two arms for horizontal motion and a ball screw for vertical movement and color and LIDAR cameras were used for marker identification and proximity awareness to guide the robotic arm to its target receptacle. Initial tests resulted in 199 out of 200 successful attempts at autonomous coupling of the dispensing coupler and a fuel cell engine, without hydrogen. The dispenser prototype was modified to include tubing for both hydrogen fuel and air purge lines, but subsequent tests were confounded by the shoulder motor over current errors which limited the robot from getting to the fully inserted position to achieve a positive latch. Robotic hydrogen refueling was successfully demonstrated over 1.5 hours of testing, Plug completed 29 successful latches with an average number of 4 sequential latches before failure. However, a robot capable of placing the nozzle with more force is required for higher reliability. For budget period two, a small scale (10 kg / transfer) automated control system was designed that would operate valves to control pressure and flow of liquid nitrogen between a source and receiving tank with an aim to minimize boil off losses by operating at the most thermodynamically efficient state points. Control system logic flow and a P&ID were developed prior to system safety characterization via HAZOP. A control narrative and system state points were defined. Delays in approval for a change of project objective and procurement issues precluded the construction and test of the final prototype system.

08 HYDROGEN↗

Pro2R: Procurement of Ramping Product and Regulation in CAISO Using Probabilistic Solar Power Forecasts

This presentation summarizes the objectives and findings from the project titled, "Pro2R: Coordinated Procurement of Ramping Product & Regulation in CAISO Using Probabilistic Solar Power Forecasts," funded by DOE SETO. The goal is to develop cutting edge probabilistic solar power forecasting methods, and integrate them into ISO market operations. The team has integrated in two ways: 1) to procure ramping product and regulation requirements (ancillary services) in the California ISO market, and 2) to develop an open source visitation and ramp alert related situational awareness using probabilistic forecasts. This deck also summarizes the results from the use of machine learning methods to relate probabilistic solar forecasts to the the needs for flexible ramp product in the California ISO system.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Lessons Learned from the Clean Energy to Communities (C2C) Peer-Learning Cohort Enhancing Resilience at Critical Facilities through Solar, Storage, and Microgrids

The National Renewable Energy Laboratory (NREL), with support from World Resources Institute (WRI), designed and led a six-month peer-learning cohort from January through July 2024 on "Enhancing Resilience at Critical Facilities through Solar, Storage, and Microgrids" as part of the U.S Department of Energy's Clean Energy to Communities (nrel.gov/c2c) (C2C) program. Representatives from 15 municipalities, municipal utilities, colleges, and Tribes from across the United States participated in monthly workshops covering best practices for planning and deploying local resilience projects. This document shares key takeaways, lessons learned, and resources from the cohort including considerations for planning, proposing, designing, procuring, and funding microgrid projects for resilience.

C2C↗