Search NASASearch

SEARCH · Search NASA

Results for “user requirements”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

User requirements and user acceptance of current and next-generation satellite mission and sensor complement, oriented toward the monitoring of water resources

Principal water resources users were surveyed to determine the applicability of remotely sensed data to their present and future requirements. Analysis of responses was used to assess the levels of adequacy of LANDSAT 1 and 2 in fulfilling hydrological functions, and to derive systems specifications for future water resources-oriented remote sensing satellite systems. The analysis indicates that water resources applications for all but the very large users require: (1) resolutions on the order of 15 meters, (2) a number of radiometric levels of the same order as currently used in LANDSAT 1 (64), (3) a number of spectral bands not in excess of those used in LANDSAT 1, and (4) a repetition frequency on the order of 2 weeks. The users had little feel for the value of new sensors (thermal IR, passive and active microwaves). What is needed in this area is to achieve specific demonstrations of the utility of these sensors and submit the results to the users to evince their judgement.

Castruccio, P. A.

Public Service Communications Satellite User Requirements Workshop

Information on user requirements for public service communications was acquired to provide the basis of a study to determine the optimum satellite system to satisfy user requirements. The concept for such a system is described: Topics discussed included requirements for data and message services, elementary and secondary education, extension and continuing education, environmental communications, library services, medical education, medical services, public broadcasting, public safety, religious applications, state and local communications, and voluntary services. Information was also obtained on procedures to follow to make the transfer to commercial services.

Wolff, E. A.

Study of data collection platform concepts: Data collection system user requirements

The overall purpose of the survey was to provide real world data on user requirements. The intent was to assess data collection system user requirements by questioning actual potential users rather than speculating on requirements. The end results of the survey are baseline requirements models for both a data collection platform and a data collection system. These models were derived from the survey results. The real value of these models lies in the fact that they are based on actual user requirements as delineated in the survey questionnaires. Some users desire data collection platforms of small size and light weight. These sizes and weights are beyond the present state of the art. Also, the survey provided a wealth of information on the nature and constituency of the data collection user community as well as information on user applications for data collection systems. Finally, the data sheds light on the generalized platform concept. That is, the diversity of user requirements shown in the data indicates the difficulty that can be anticipated in attempting to implement such a concept.

Source record

Results of the users' requirements survey

The objectives of the High Resolution, High Frame Rate Video Technology (HHVT) Users' Requirements Survey were the following: (1) Document the requirements of potential users of the HHVT system; (2) Establish a data base relating key video parameters to HHVT users; (3) Guide the development of a high resolution, high frame rate video system offering high data storage capacity and high data transmission rates; (4) Allow users to compare their requirements to those of other users and to the state-of-the-art technology; and (5) Allow users to reassess, if necessary, their requirements in the light of existing and near-term technology. The results of the Users' Requirements Survey are presented. The diversity of these requirements indicates a need for developing a video system with great flexibility.

Butcher, Robert L.

An earth and ocean SAR for Space Shuttle - User requirements and data handling implications

A brief summary is presented of user requirements for the Shuttle synthetic aperture radar (SAR) to be flown on a sortie mission of 7 to 10 days in duration, based on information collected from survey of the literature and direct user contacts. This information suggests selection of a dual frequency (L and X band) dual polarization SAR capable of meeting most user requirements. Particular attention is given to the SAR system specifications and the data handling capability expected to be available during the 1980s for the tracking and data relay satellite system (TDRSS). The data link requirements of the majority of Shuttle experiments will eventually determine whether the necessary high-capacity Shuttle-TDRSS return link will be part of the intrinsic Shuttle capability or will be part of the SAR payload.

Cohen, E. A.

User requirements for NASA data base management systems. Part 1: Oceanographic discipline

Generic oceanographic user requirements were collected and analyzed for use in developing a general multipurpose data base management system for future missions of the Office of Space and Terrestrial Applications (OSTA) of NASA. The collection of user requirements involved; studying the state-of-the-art technology in data base management systems; analyzing the results of related studies; formulating a viable and diverse list of scientists to be interviewed; developing a presentation format and materials; and interviewing oceanographic data users. More effective data management systems are needed to handle the increasing influx of data.

Fujimoto, B.

Evaluation of the user requirements processes for NASA terrestrial applications programs

To support the evolution of increasingly sound user requirements definition processes that would meet the broad range of NASA's terrestrial applications planning and management needs during the 1980's, the user requirements processes as they function in the real world at the senior and middle management levels were evaluated. Special attention was given to geologic mapping and domestic crop reporting to provide insight into problems associated with the development and management of user established conventional practices and data sources. An attempt was made to identify alternative NASA user interfaces that sustain strengths, alleviate weaknesses, maximize application to multiple problems, and simplify management cognizance. Some of the alternatives are outlined and evaluated. It is recommended that NASA have an identified organizational point of focus for consolidation and oversight of the user processes.

Source record

Canadian MSAT field trial program user requirements

A wide range of mobile satellite service offerings will be available in late 1993 with the launch of Canada's first satellite devoted almost exclusively to mobile and transportable services. During the last seven years, the Dept. of Communications has been meeting with potential MSAT users in government and the private sector as part of a $20M Communications Trials Program. User trials will be conducted using leased capacity as well as capacity on Canada's MSAT satellite. User requirements are discussed which were identified under the Communications Trials Program. Land, marine, aeronautical, and fixed applications are described from the perspective of the end users. Emphasis is placed on field trials being accomplished using leased capacity such as the marine data trial being implemented by Ultimateast Data Communications, trials using transportable briefcase terminals and additional field trials being considered for implementation with the TMI Mobile Data Service. The pre-MSAT trials that will be conducted using leased capacity are only a limited sample of the overall end user requirements that have been identified to date. Additional end user applications are discussed, along with a summary of user benefits.

Pedersen, Allister

Automated Derivation of Complex System Constraints from User Requirements

International Space Station (ISS) payload developers submit their payload science requirements for the development of on-board execution timelines. The ISS systems required to execute the payload science operations must be represented as constraints for the execution timeline. Payload developers use a software application, User Requirements Collection (URC), to submit their requirements by selecting a simplified representation of ISS system constraints. To fully represent the complex ISS systems, the constraints require a level of detail that is beyond the insight of the payload developer. To provide the complex representation of the ISS system constraints, HOSC operations personnel, specifically the Payload Activity Requirements Coordinators (PARC), manually translate the payload developers simplified constraints into detailed ISS system constraints used for scheduling the payload activities in the Consolidated Planning System (CPS). This paper describes the implementation for a software application, User Requirements Integration (URI), developed to automate the manual ISS constraint translation process.

Muery, Kim

Evolution user requirements for the restructured space station

Space Station Freedom (SSF) is designed to be an Earth orbiting multidisciplinary R&D facility capable of evolving to accommodate a variety of potential uses. In order to identify SSF evolution requirement and define potential growth configurations, NASA-Langley is analyzing user resource requirements for the post-PMC time frame. The analysis goal is to define resource levels, including crew, power, and volume, which allow full utilization of SSF capabilities commensurate with minimum essential user requirements. Multiple scenarios were studied including core R&D and combined SEI plus R&D utilization. An analysis is presented of a core R&D utilization scenario. Included are discussions of resource allocation assumptions for specific R&D disciplines, user requirements trends, and growth resource projections. These preliminary results show total resource requirements of 13 crew, 150 kW power, and additional lab volume equivalent to a second U.S. lab module. Additionally, orthogonal growth structure was identified as required to support SSF systems and users.

Leath, K.

Paper simulation techniques in user requirements analysis for interactive computer systems

This paper describes the use of a technique called 'paper simulation' in the analysis of user requirements for interactive computer systems. In a paper simulation, the user solves problems with the aid of a 'computer', as in normal man-in-the-loop simulation. In this procedure, though, the computer does not exist, but is simulated by the experimenters. This allows simulated problem solving early in the design effort, and allows the properties and degree of structure of the system and its dialogue to be varied. The technique, and a method of analyzing the results, are illustrated with examples from a recent paper simulation exercise involving a Space Shuttle flight design task

Ramsey, H. R.

Definition study of land/sea civil user navigational location monitoring systems for NAVSTAR GPS: User requirements and systems concepts

A low-cost GPS civil-user mobile terminal whose purchase cost is substantially an order of magnitude less than estimates for the military counterpart is considered with focus on ground station requirements for position monitoring of civil users requiring this capability and the civil user navigation and location-monitoring requirements. Existing survey literature was examined to ascertain the potential users of a low-cost NAVSTAR receiver and to estimate their number, function, and accuracy requirements. System concepts are defined for low cost user equipments for in-situ navigation and the retransmission of low data rate positioning data via a geostationary satellite to a central computing facility.

Devito, D. M.

Agricultural aviation user requirement priorities

The results are given of a research project pertaining to the development of agricultural aviation user requirement priorities. The raw data utilized in the project was obtained from the National Agricultural Aviation Association. A specially configured poll, developed by the Actuarial Research Corporation was used to solicit responses from NAAA members and others. The primary product of the poll is the specification of seriousness as determined by the respondents for some selected agricultural aviation problem areas identified and defined during the course of an intensive analysis by the Actuarial Research Corporation.

Kaplan, R. L.

Development of Integrated Programs for Aerospace-Vehicle Design (IPAD) - IPAD user requirements

Results of a requirements analysis task for Integrated Programs for Aerospace Vehicle Design (IPAD) are presented. User requirements which, in part, will shape the IPAD system design are given. Requirements considered were: generation, modification, storage, retrieval, communication, reporting, and protection of information. Data manipulation and controls on the system and the information were also considered. Specific needs relative to the product design process are also discussed.

Anderton, G. L.

Drought Predictability and Prediction in a Changing Climate: Assessing Current Predictive Knowledge and Capabilities, User Requirements and Research Priorities

Drought is fundamentally the result of an extended period of reduced precipitation lasting anywhere from a few weeks to decades and even longer. As such, addressing drought predictability and prediction in a changing climate requires foremost that we make progress on the ability to predict precipitation anomalies on subseasonal and longer time scales. From the perspective of the users of drought forecasts and information, drought is however most directly viewed through its impacts (e.g., on soil moisture, streamflow, crop yields). As such, the question of the predictability of drought must extend to those quantities as well. In order to make progress on these issues, the WCRP drought information group (DIG), with the support of WCRP, the Catalan Institute of Climate Sciences, the La Caixa Foundation, the National Aeronautics and Space Administration, the National Oceanic and Atmospheric Administration, and the National Science Foundation, has organized a workshop to focus on: 1. User requirements for drought prediction information on sub-seasonal to centennial time scales 2. Current understanding of the mechanisms and predictability of drought on sub-seasonal to centennial time scales 3. Current drought prediction/projection capabilities on sub-seasonal to centennial time scales 4. Advancing regional drought prediction capabilities for variables and scales most relevant to user needs on sub-seasonal to centennial time scales. This introductory talk provides an overview of these goals, and outlines the occurrence and mechanisms of drought world-wide.

Schubert, Siegfried

MSAT wide-area fleet management: End-user requirements and applications

MSAT (Mobile SATellite) Services will become a reality in North America in 1995. MSAT will provide wide-area voice, data and fax services to land, marine and aeronautical mobile users anywhere in North America including 200 nautical miles off the coasts and into the Arctic waters. MSAT will also convey GPS position information from mobiles to dispatch centers. One broad application of MSAT is Wide Area Fleet Management (WAFM). This paper defines WAFM, outlines end-user requirements and identifies potential applications of MSAT WAFM. The paper draws from information obtained in several preMSAT WAFM field trials in land, marine and aeronautical mobile environments. The paper concludes with an outline of the potential benefits of MSAT WAFM.

Pedersen, Allister

Automated Derivation of Complex System Constraints from User Requirements

The Payload Operations Integration Center (POIC) located at the Marshall Space Flight Center has the responsibility of integrating US payload science requirements for the International Space Station (ISS). All payload operations must request ISS system resources so that the resource usage will be included in the ISS on-board execution timelines. The scheduling of resources and building of the timeline is performed using the Consolidated Planning System (CPS). The ISS resources are quite complex due to the large number of components that must be accounted for. The planners at the POIC simplify the process for Payload Developers (PD) by providing the PDs with a application that has the basic functionality PDs need as well as list of simplified resources in the User Requirements Collection (URC) application. The planners maintained a mapping of the URC resources to the CPS resources. The process of manually converting PD's science requirements from a simplified representation to a more complex CPS representation is a time-consuming and tedious process. The goal is to provide a software solution to allow the planners to build a mapping of the complex CPS constraints to the basic URC constraints and automatically convert the PD's requirements into systems requirements during export to CPS.

Foshee, Mark