Improving GaAsP/Si Tandem Solar Cells Using Silicon Passivated Contacts

Abstract

The degradation of photocarrier bulk lifetime in Si wafer substrates during the heteroepitaxial growth of III-V materials has been widely reported and is known to limit the efficiency of III-V/Si tandem solar cells. There have been prior strategies to protect Si lifetime in III-V growth chambers, but most require the use of a protective layer that must be removed in subsequent device processing. It would be advantageous for protective layers to remain an active part of the device. In this work, we demonstrate that a polycrystalline silicon (poly-Si) passivated contact can protect the minority carrier lifetime of the Si base wafer during the organometallic vapor phase epitaxy of III-V materials on silicon substrates.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

LaSalvia, Vincenzo, Nemeth, William, Boyer, Jacob T., Lepowski, Daniel L., Makoutz, Emily A., Saenz, Theresa E., Ringel, Steven A., Grassman, Tyler J., Warren, Emily L. (ORCID:0000000185687881). 2021-01-05. Improving GaAsP/Si Tandem Solar Cells Using Silicon Passivated Contacts. https://doi.org/10.1109/pvsc45281.2020.9300356

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Scalable Stochastic Transmission Expansion: A Use Case for ExaSGD

The intermittent nature of renewable energy poses new challenges for power grids due to its variable and un- certain power output. These features of renewable generation are becoming more relevant to transmission planning as grids reach higher penetration levels of renewable energy. In this paper we present an approach for transmission planning based on scalable computational approaches which enable the explicit consideration of operational uncertainties in the planning process. Using three-stage stochastic programming and the progressive hedging algorithm, we compute transmission expansion decisions on a modified RTS-GMLC test system. We augment the grid with large amounts of wind generation and consider many operational scenarios subject to wind uncertainty. This is an example of a possible use of the ExaSGD security constrained AC optimal power flow solver.

Exascale Computing Project↗