Search NASA⌕ Search

SEARCH · Search NASA

Results for “Sludge Batch”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Sludge Batch 11 Assembly: Tank 51

Savannah River Mission Completion (SRMC) Nuclear Safety and Engineering Integration has requested that Savannah River National Laboratory (SRNL) perform Tank 51 characterization analyses in support of Sludge Batch 11 (SB11) assembly. This report provides important characterization of the slurry in Tank 51 after transfers from Tank 22, Tank 35, and Tank 13 (post Tank 15 to Tank 13 transfer) to Tank 51 that demonstrates the sludge concurs with the estimated transfer mass for the SB11 recipe. A total of 3 sets of Tank 51 samples were delivered to SRNL from March 2023 to February 2024. The composite sample was analyzed for the following: density, weight percent solids, chemical composition, radionuclides, and supernate corrosion control analyses. The results of the Tank 51 samples are consistent with and representative of expected sludge projections for Sludge Batch 11.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technical Evaluation of Accelerated Basin De-Inventory Material Addition to Sludge Batch 11 (Rev. 1)

The Accelerated Basin De-inventory (ABD) program involves discarding spent nuclear fuel that is currently stored in L-Basin to the Defense Waste Processing Facility (DWPF) for vitrification. The first ABD discards will occur during the preparation of Sludge Batch (SB) 11. Savannah River Mission Completion has requested that the Savannah River National Laboratory assess the technical gaps related to the increased gadolinium poisoning requirement and the impacts of performing the Low Temperature Aluminum Dissolution (LTAD) process in Tank 51 with H-Canyon discards present. The following summarizes the evaluation of the impacts of increasing the quantity of gadolinium (and related topics) from what was previously evaluated in the SRNL studies of gadolinium-poisoned ABD material solubility, the overall ABD flowsheet review, and increasing the fissile mass loading in glass: 1) Based on literature surveys, there is no indication that organic interactions with gadolinium will be significant at the high pH (typically >13) conditions of the Concentration, Storage, and Transfer Facilities. Any interactions of gadolinium with organics in DWPF are not expected to adversely impact DWPF or downstream facilities. Thus, there is little-to-no residual risk from organic interactions with gadolinium [Gap closed]; 2) Adding depleted uranium to ABD material, targeting 235 U enrichment of 4.90% within each transfer window, will mitigate potential impacts from an increase in soluble 235 U enrichment during sludge washing and LTAD. The plan to take advantage of previous transfers and allow 235 U enrichment of >5% during the final transfer window carries a risk that Tank 51 supernate will have a 235 U enrichment of >5%, which should be evaluated for acceptance; 3) Increasing the gadolinium mass ratio to 3.0:1 Gd: 235 U(eq SLU ) should lead to the same or higher partitioning of gadolinium into the solid phase within the DWPF Chemical Process Cell, resulting in both liquid and solid phases with expected partitioning of Gd consistent with the prior solubility study [Gap closed for SB11]; 4) There are no expected impacts on DWPF melt temperature and melter operations due to the minimal ~0.2 weight percent (wt%) increase in Gd concentration relative to previous sludge batches [Gap closed for SB11]; 5) As observed previously, Gd is expected to enter the off-gas system via physical entrainment, but at a slightly higher concentration than what was observed for SB9 melter off-gas pluggage deposits (0.07 wt%) [Gap closed for SB11] ; 6) There are no expected impacts on DWPF recycle or the Recycle Collection Tank glycolate destruction process. [Gap closed for SB11]; 7) Gd is projected to be a trace component in the SB11 glass (<0.5 wt%) and can be ignored for process control. Trace components do not significantly impact glass durability, thus the conclusions of the previous Product Consistency Test evaluation at a fissile mass loading of 2,500 g fissile/m3 glass still applies to SB11. The ~0.1 wt% increase in Gd2O3 concentration relative to the previous study will not impact the predictability of SB11 glass with the DWPF Product Composition Control System (PCCS) models for durability or the acceptability of glass according to the Waste Acceptance Product Specifications (WAPS) criterion for product consistency [Gap closed for SB11]; 8) No additional Toxicity Characteristic Leaching Procedure testing is necessary for SB11 and the hazardous waste specification of the SB11 DWPF waste form is unchanged after the addition of the ABD stream [Gap closed for SB11]. The following summarizes the evaluation of the impacts of adding two-thirds of the ABD material to Tank 51 prior to LTAD: 1) The addition of two-thirds of the ABD increases overall aluminum mass from 1.39×10 4 kg to 1.64×10 4 kg (15.5% ABD Al). The form of the insoluble portion of the Al resulting from ABD addition should be the more readily dissolved Al(OH) 3 and amorphous forms. The portion of the ABD aluminum that is processed by LTAD is expected to be completely soluble, thus requiring that less of the boehmite in the sludge be dissolved to reach the same Al target in the SB. [Gap closed for SB11]; The expected LTAD impact on other components, as related primarily to the components in ABD, are discussed. Gd is expected to remain insoluble during LTAD and not impact the solubility of other components. [Gap closed for SB11]; The addition of two-thirds of the ABD increases overall projected SB11 uranium mass from 4,740 kg to 13,100 kg (63% ABD U) and the projected plutonium mass from 86.0 kg to 89.5 kg (3.9% ABD Pu). The addition of all of the ABD increases overall projected SB11 uranium mass from 4,740 kg to 16,100 kg (70% ABD U) and the projected plutonium mass from 86.0 kg to 90.4 kg (5.3% ABD Pu). The 235 U enrichment will be ≤5%. The fissile uranium will be adequately poisoned by Gd and the fissile Pu will be adequately poisoned by Fe from the sludge. [Gap closed for SB11]; There is a low risk that ABD addition will impact the rheology or pumpability of the slurry. There is a low but higher risk of ABD addition prior to LTAD impacting the settling rate; Based on the evaluation of adding two-thirds of the ABD material and all of the ABD material prior to the LTAD process, there is no volume or mass limit that would need to be imposed on ABD additions prior to LTAD. [Gap closed for SB11]. Revision 1 of this report addresses a variation on the ABD additions and LTAD strategy where sodium hydroxide additions for LTAD may be performed intermittently or concurrently with an ABD addition window. The proposed change does not alter the conclusions of this evaluation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Determination of Reportable Radionuclides for Defense Waste Processing Facility (DWPF) Sludge Batch 10 (Macrobatch 12)

Savannah River National Laboratory (SRNL) was tasked with the radionuclide characterization of the Sludge Batch 10 (SB10) Tank 40 sample (HTF-40-23-24) in accordance with requirements for reporting the Waste Acceptance Product Specifications (WAPS). The Defense Waste Processing Facility (DWPF) is required to report all radionuclides with half-lives greater than ten years and which comprise greater than 0.05% of the total activity inventory for a given waste form at certain specified “index years”. DWPF complies with the requirements by considering the half-life requirement (t1/2 > 10 years) and radionuclides with concentrations greater than 0.01% of the total inventory from the approximate time of production through 1,100 years.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of the sludge batch 9 (Macrobatch 10) DWPF pour stream glass sample

A pour stream (PS) sample taken during processing of Sludge Batch 8 (SB8, Macrobatch 10) was analyzed by Savannah River National Laboratory (SRNL) to verify compliance with the Defense Waste Processing Facility (DWPF) Glass Product Control Program. The following conclusions were drawn from these analyses; The sum of oxides for the SB8 PS glass (97.41 wt%) is within the Product Composition Control System (PCCS) limits (100 ± 5 wt%); The average Waste Dilution Factor (WDF) calculated from the Tank 40 dried sludge analysis results for SB8 is 1.9 ± 0.1. In general, the radionuclide concentration of the SB8 PS glass sample calculated using this WDF is in good agreement with the measured radionuclide content; The Product Consistency Test (PCT) results indicate that the SB8 PS glass meets the Waste Acceptance Product Specifications (WAPS) for durability, with normalized release rates for boron, lithium and sodium all at least two standard deviations lower than those of the Environmental Assessment (EA) glass; The average measured density of the SB8 PS glass is 2.72 g/cm 3 , consistent with previous PS samples; and, The average measured Fe 2+ /ΣFe ratio of the SB8 PS glass is 0.15, within the target range of 0.09- 0.33, and closely resembling the predicted REDOX value of 0.15.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technical Evaluation of Accelerated Basin De-Inventory Material Addition to Sludge Batch 11

Savannah River Nuclear Solutions has a need to discard spent nuclear fuel (SNF), currently stored in L Basin, to the Defense Waste Processing Facility (DWPF) for vitrification. The Department of Energy (DOE) has approved the Accelerated Basin De-inventory (ABD) Program for discarding SNF via transfers from H-Canyon to the Savannah River Site (SRS) Liquid Waste (LW) system. The first ABD discards will occur during the preparation of Sludge Batch (SB) 11. An initial impact evaluation of the LW flowsheet was performed by the Savannah River National Laboratory (SRNL) prior to the approval of the ABD Program. This evaluation addressed the LW downstream facilities based on the current H-Canyon flowsheet sequence for the average ABD discard. The flowsheet evaluation only included aluminum-clad SNF, specifically Materials Test Reactor (MTR) fuel and High Flux Isotope Reactor (HFIR) fuel similar to the planned SB11 discard. Following this evaluation, the flowsheet has been slightly altered to address (i) new nuclear criticality safety controls for DWPF that credit a higher amount of gadolinium as a neutron poison for all of the enriched uranium contained in a SB and (ii) potential additions of the H-Canyon neutralized fuel stream prior to the Low Temperature Aluminum Dissolution (LTAD) process in Tank 51. The early introduction of ABD material into the SB assembly process is being investigated to provide flexibility regarding transfer opportunities for H-Canyon to Tank 51 for SB11 and future sludge batches.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of the Sludge Batch 9 (Macrobatch 11) DWPF Pour Stream Glass Sample Collected During the Nitric-Glycolic Acid Flowsheet Transition

A pour stream (PS) sample taken near the end of processing of Sludge Batch 9 (SB9, Macrobatch 11) during the transition to the nitric-glycolic acid (NGA) flowsheet was analyzed by the Savannah River National Laboratory (SRNL). The SB9 NGA PS sample was taken on 12/18/2022 during Melter Feed Batch 823 associated with glass canister S04773 and was transferred to SRNL in Primary Container PC0139 in February 2023.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sludge Batch 11 Assembly: Tank 26

Savannah River Mission Completion Nuclear Safety and Engineering Integration (SRMC-E) has requested that Savannah River National Laboratory (SRNL) perform Tank 26 characterization analyses in support of Sludge Batch 11 (SB11) assembly. This report provides important characterization of the slurry in Tank 26 prior to transfer from Tank 26 to Tank 51 that confirms the transfer is "Low Rem" and ensures the sludge concurs with the estimated transfer mass for the SB11 recipe. Two Tank 26 samples were delivered to SRNL and composited into a single sample in September 2023. The composite sample was analyzed for the following: density, weight percent solids, chemical composition, radionuclides, supernate corrosion control tests, and x-ray diffraction for burkeite, gibbsite, and boehmite. The slurry was also evaluated for sulfate washing behavior in order to provide knowledge on insoluble sulfate dissolution during Tank 51 sludge washing similar to a previous washing study performed in 2019. The Tank 26 sample results are consistent with and representative of PUREX sludge and the prior usage of Tank 26 as a feed tank for the 1F and 2F Evaporators.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Chemical Characterization Results for Tank 40 Sludge Batch 10 Waste Acceptance Product Specifications (WAPS) Sample

A 3-L sample (HTF-40-23-24) obtained from Tank 40 following transfer of Tank 51 to achieve the final Sludge Batch 10 processing composition was received by Savannah River National Laboratory (SRNL). SRNL was tasked with characterization of the sample in accordance with requirements for reporting the Waste Acceptance Product Specifications. A representative subsample, approximately 500 mL, was prepared by continuously agitating the 3-L sample via a mixing blade inserted into the bottle. This subsample was then used for the chemical and physical characterization reported here. This characterization includes the following: (1) Supernate and slurry density; (2) Weight percent solids; (3) Mercury Analysis (supernate and slurry); (4) Anions; (5) Total Organic/Inorganic Carbon; (6) Free Hydroxide; (7) Other Base; (8) Elementals; (9) Volatile Organic Analysis and Semi-volatile Organic Analysis; and (10) Fissile Radionuclides and Uranium Enrichment. The results of this physical and chemical characterization of the sample are documented in this report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sludge Batch 11 Assembly: Tank 26 (Rev.1)

Savannah River Mission Completion Nuclear Safety and Engineering Integration (SRMC-E) has requested that Savannah River National Laboratory (SRNL) perform Tank 26 characterization analyses in support of Sludge Batch 11 (SB11) assembly. This report provides important characterization of the slurry in Tank 26 prior to transfer from Tank 26 to Tank 51 that confirms the transfer is "Low Rem" and ensures the sludge concurs with the estimated transfer mass for the SB11 recipe. Two Tank 26 samples were delivered to SRNL and composited into a single sample in September 2023. The composite sample was analyzed for the following: density, weight percent solids, chemical composition, radionuclides, supernate corrosion control tests, and x-ray diffraction for burkeite, gibbsite, and boehmite. The slurry was also evaluated for sulfate washing behavior in order to provide knowledge on insoluble sulfate dissolution during Tank 51 sludge washing similar to a previous washing study performed in 2019. The Tank 26 sample results are consistent with and representative of PUREX sludge and the prior usage of Tank 26 as a feed tank for the 1F and 2F Evaporators.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sludge Batch 11 Assembly: Tank 15

Savannah River Mission Completion Nuclear Safety and Engineering Integration (SRMC-E) has requested that Savannah River National Laboratory (SRNL) perform Tank 15 characterization analyses in support of Sludge Batch 11 (SB11) assembly. This report provides important characterization of the slurry in Tank 15 prior to transfer from Tank 15 to Tank 13 (prior to sending to Tank 51) in order to demonstrate that the transfer is "Low Rem" and ensure the sludge concurs with the estimated transfer mass for the SB11 recipe. A total of 3 sets of Tank 15 samples were delivered to SRNL from December 2022 to August 2023. The individual sets of composite samples were analyzed for density, weight percent solids, chemical composition, radionuclides, and/or supernate corrosion control tests.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Sludge Batch 11 Assembly: Tank 35

Savannah River Mission Completion Nuclear Safety and Engineering Integration (SRMC-E) has requested that Savannah River National Laboratory (SRNL) perform Tank 35 characterization analyses in support of Sludge Batch 11 (SB11) assembly. Two Tank 35 samples were delivered to SRNL and composited into a single sample in April 2023. The composite sample was analyzed for the following: density, weight percent solids, chemical composition, radionuclides, supernate corrosion control tests, and x-ray diffraction for burkeite, gibbsite, and boehmite.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sludge Batch 11 Assembly: Tank 35

Savannah River Mission Completion Nuclear Safety and Engineering Integration (SRMC-E) has requested that Savannah River National Laboratory (SRNL) perform Tank 35 characterization analyses in support of Sludge Batch 11 (SB11) assembly. Two Tank 35 samples were delivered to SRNL and composited into a single sample in April 2023. The composite sample was analyzed for the following: density, weight percent solids, chemical composition, radionuclides, supernate corrosion control tests, and x-ray diffraction for burkeite, gibbsite, and boehmite.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of a Sulfate Solubility Limit Greater Than 0.65 Weight Percent in Sludge Batch 10 Glasses

Previous laboratory-scale crucible testing with batch chemicals confirmed that the sulfate (SO 4 2- ) limit for Sludge Batch 10 (SB10) was 0.65 weight percent (wt.%) in glass. This limit signifies that 0.65 wt.% SO 4 2- can be retained in the glass without the formation of a sulfate phase. The Defense Waste Processing Facility imposes this constraint in the Material Tracking Program. Based on preliminary calculations to support the Material Tracking Program, it was anticipated that transfer volumes of the monosodium titanate/sludge solids (MST/SS) stream from the Salt Waste Processing Facility (SWPF) may need to be reduced to maintain projected sulfate concentrations below 0.65 wt.% in glass. Savannah River Mission Completion requested that the Savannah River National Laboratory perform additional sulfate testing to determine whether a sulfate solubility limit greater than 0.65 wt.% is feasible for SB10, which could allow for higher transfer volumes of the MST/SS stream. This report documents the results of the testing at higher sulfate concentrations for the glass composition region defined by the most recent SB10 projection (November 2022) and Frits 473 and 625. Frit 473 was recommended for SB10 and Frit 625 was used during SB9 processing and the SB9 to SB10 transition. A total of twenty-one glass compositions were developed based on the expected compositional variables, which include sludge-only (SO) and coupled processing with the SWPF, waste loading (WL), and frit composition. The target sulfate concentrations were varied from 0.65-0.85 wt.% at 32 and 40% WL. Each glass was prepared from reagent grade chemicals and melted at 1150 °C. Visual observations were used to confirm the presence of a sulfate salt phase on the cooled glass surfaces. Representative samples of each glass were submitted for chemical composition analysis by inductively coupled plasma-optical emission spectroscopy and Cs analysis by inductively coupled plasma-mass spectrometry. Overall the majority of mean measured values are consistent with the target values for each major oxide of interest with less than 5% error. The percent errors for the measured SO 4 2- concentrations are generally less than 10%, which is comparable with previous sulfate solubility study measurements and acceptable. Only the SO glasses based on Frit 625 formed a sulfate phase at a 0.80 wt.% SO 4 2- target concentration at both 32 and 40% WL. The remainder of the glasses did not form a sulfate layer. Due to the formation of the sulfate phase, the limit is conservatively set at 0.70 wt.% based on the measured sulfate concentrations of 0.71 wt.% and 0.75 wt.% for these two glasses. None of the SO or coupled operation glasses based on Frit 473 formed a sulfate salt phase, which supports a sulfate limit of 0.80 wt.%. The following SO 4 2- concentration limits are recommended during SO and coupled SB10 processing: (1) 0.70 wt.% during processing with Frit 625, and (2) 0.80 wt.% during processing with Frit 473.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SRNL Sludge Batch 10 Qualification SRAT and SME Off-Gas Results

Savannah River National Laboratory (SRNL) completed a small-scale demonstration of the Defense Waste Processing Facility (DWPF) Chemical Process Cell (CPC) utilizing the nitric-glycolic acid (NGA) flowsheet to support Sludge Batch 10 (SB10) qualification. The demonstration utilized a Tank 51 slurry sample washed by SRNL (with added H-canyon material). The purpose of this document is to report the observed off-gas results from the demonstration. With the NGA flowsheet, DWPF has a CPC hydrogen generation limit of 2.4×10 -2 lb/h. The peak observed rate was nearly 90 times less than that limit during SRNL testing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sludge Batch 10 Flowsheet Testing with Non-radioactive Simulants

Fourteen Chemical Processing Cell (CPC) simulations were performed with nonradioactive sludge simulants at the Aiken County Technology Laboratory in Aiken, SC. Four of these experiments were performed with Tank 51 sludge simulant. The remaining ten were performed with Tank 40 sludge simulant. The purpose of these experiments was to elucidate the chemistry and characteristics of Sludge Batch (SB) 10 as anticipated in the Defense Waste Processing Facility (DWPF). Experiments were performed at acid stoichiometries between 76% and 138% of the Koopman Minimum Acid requirement (85% - 144% of the Hsu acid requirement) and at REDuction/OXidation (REDOX) targets between 0.1 and 0.3. Testing examined the impact of coupled operations and sludge-only operations during Sludge Receipt and Adjustment Tank (SRAT) and Slurry Mix Evaporator (SME) processing at both design basis and nominal boilup rates. This report shares conclusions made as a result of this testing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Sludge Solids Returns Impacts on Sludge Batch 10 Flammability, Glass Quality, and Glass Processability

The Savannah River National Laboratory (SRNL) is currently preparing to return ≤ 20 kgs of sludge solids collected over time from Tank Farm characterization activities and demonstrations of the Defense Waste Processing Facility (DWPF) flowsheets (nitric-formic and nitric-glycolic). These sludge solids will be transported and added to Tank 51 which is currently preparing Sludge Batch (SB) 10. DWPF plans to operate the under the nitric-glycolic flowsheet for the processing of SB10. The hydrogen generation rate for the nitric-glycolic flowsheet is 0.024 lb h -1 . The addition of ≤20 kg of sludge solids returns to SB 10 does not have an impact on flammability in the DWPF Chemical Process Cell (CPC) or glass quality and processability. The relatively low mass of the addition (≤20 kg) is insufficient to detect a significant analytical change to the expected SB 10 compositions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of the Sludge Batch 9 (Macrobatch 11) DWPF Pour Stream Glass Sample

A pour stream (PS) sample taken near the end of processing of Sludge Batch 9 (SB9, Macrobatch 11) with the Nitric-Formic Acid Flowsheet was analyzed by the Savannah River National Laboratory to comply with the Defense Waste Processing Facility (DWPF) Glass Product Control Program. The SB9 PS sample was taken on 5/28/2022 during Melter Feed Batch 815 associated with glass canister S04741, and was transferred to SRNL in Primary Container PC0136.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗