Search NASASearch

SEARCH · Search NASA

Results for “Control Samples”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

421 records · Page 24

Nuclear Safety [Vol. 29, No. 1, January-March 1988]

Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. THE CHERNOBYL ACCIDENT: 1 Core History and Nuclide Inventory of the Chernobyl Core at the Time of Accident by Gerald Kirchner and Cornelius C. Noack; GENERAL SAFETY CONSIDERATIONS: 6 Nonprescriptive Nuclear Safety Regulation: The Example of Loss of Offsite Power by M. W. Golay, V. P. Manno, and C. Vlahoplus, Jr., 20 Nuclear Power Safety Goals in Light of the Chernobyl Accident by C. Whipple and C. Starr; ACCIDENT ANALYSIS: 29 Containment Loads from Severe Accidents—U.S. Program by W. Kerr and M. K. Dey; PLANT SAFETY FEATURES: 36 Safety Characteristics of Modern High-Temperature Reactors: Focus on German Designs by W. Kröger, H. Nickel, and R. Schulten; ENVIRONMENTAL EFFECTS: 49 Radiation Hormesis and Nuclear Safety by C. C. Congdon; OPERATING EXPERIENCES: 58 Evaluation of Nonradiological Water Chemistry at Power Reactors by Harvey Zibulsky, James J. Kottan, Walter J. Pasciak, Mary Ann Castrogivanni, and Sujit Banerjee, 64 Reactor Shutdown Experience Compiled by J. W. Cletcher, 67 Operating U.S. Power Reactors Compiled by E. G. Silver; RECENT DEVELOPMENTS: 85 General Administrative Activities Compiled by E. G. Silver, 94 Reports, Standards, and Safety Guides by D. S. Queener, 100 Status of Power-Reactor Projects Undergoing Licensing Review Compiled by E. G. Silver, 103 Proposed Rule Changes as of Sept. 30, 1987; ANNOUNCEMENTS: 5 Northwestern University Short Course on Radiation Safety, 28 International Approach to Nuclear Safety (After Three-Mile Island and Chernobyl), 57 RPI Short Course on Modern Developments in Boiling Heat Transfer and Two-Phase Flow, 107 20th DOE/NRC Nuclear Air Cleaning Conference, 110 Third International Topical Meeting on Nuclear Power Plant Thermal Hydraulics and Operations, 108 The Authors, 111 Indexes to Nuclear Safety, Volume 28.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS

Water Observations of Flow/No-Flow for the East-Taylor Watershed, Colorado (June-July 2025 and 2026)

This dataset provides multi-year, ground-truth visual observations of surface water flow/no-flow conditions within the East-Taylor Watershed, Colorado, collected during June and July of 2025 and 2026. In June and July 2025, on-the-ground visual observations of flow/no-flow were collected as part of the Watershed Function Scientific Focus Area (SFA) and Rocky Mountain Biological Laboratory (RMBL) Colorado Headwaters Ecological Spectroscopy Study (CHESS) campaign (further details are provided within the CHESS Project Description). We obtained 377 water observations of flow/no-flow within the East-Taylor Watershed, Colorado. These ground-truth observations were collected to validate classification maps from remote sensing data and model results within the East-Taylor Watershed. In 2025, flow/no-flow measurements were collected using a field-based app for the CHESS Campaign (Zerion iForm). Within the field app, a water observation form was created to collect coordinates and metadata about the observation. Information collected for the water observation points included information about visually-assessed streamflow presence/absence (standard question obtained from Colorado State University’s StreamTracker project), flow estimate, stream or ponded area width, canopy cover, manganese films, iron seeps, and beaver activity. For 2025 water observations, this dataset contains: (1) a data file with the water observations and coordinates (2025_Water_Observations.csv); (2) a Keyhole Markup Language Zipped (KMZ) with the water observation locations and metadata (2025_Water_Observations_Locations.kmz); (3) photos (.jpg and .jpeg) of the water observation points, organized by location, contained within 2025_Water_Observations_FieldPhotographs.zip file; and (4) water observation protocols and figures (2025_Water_Observation_Protocols.pdf). In June and July 2026, on-the-ground visual observations of flow/no-flow were collected as part of the Watershed Function SFA project. We obtained 365 water observations of flow/no-flow within the East-Taylor Watershed, Colorado. The 2026 observations focused on collecting repeat measurements at the 2025 flow/no-flow observation locations conducted as part of the CHESS campaign. These ground-truth observations were collected to understand differences in flow/no-flow in 2026, given the unprecedented 2026 drought in Colorado. In 2026, flow/no-flow measurements were collected using ArcGIS (Geographic Information System) Survey123. Within the field app, a water observation form was created to collect coordinates and metadata about the observation. Information collected for the water observation points included repeat information from the 2025 water observation effort, including visually-assessed streamflow presence/absence (standard question obtained from Colorado State University’s StreamTracker project), flow estimate, stream or ponded area width, canopy cover, manganese films, iron seeps, beaver activity, and a new metadata component of estimated stream depth (for select locations). For 2026 water observations, this dataset contains: (1) a data file with the water observations and coordinates (2026_Water_Observations.csv); (2) a Keyhole Markup Language Zipped (KMZ) with the water observation locations and metadata (2026_Water_Observations_Locations.kmz); (3) photos (.jpg) of the water observation points, organized by location, contained within 2026_Water_Observations_FieldPhotographs.zip file; and (4) water observation protocols and figures (2026_Water_Observation_Protocols.pdf). For 2025 and 2026 water observations, this dataset contains: (1) a location metadata file (locations.csv); (6) a file-level metadata (flmd.csv) file that lists each file contained in the dataset with associated metadata; and (7) a data dictionary (dd.csv) file that contains column/row headers used throughout the files along with a definition, units, and data type. CHESS Project Description: The Colorado Headwaters Ecological Spectroscopy Study (CHESS) comprised a multi-week airborne remote sensing and field observation campaign in the Upper Gunnison Basin, Colorado, conducted in June and July of 2025. Airborne remote sensing was conducted by the National Ecological Observatory Network Airborne Observation Platform (NEON AOP), concurrent with a field campaign run by the Rocky Mountain Biological Laboratory (RMBL), the Lawrence Berkeley National Laboratory (LBNL) and SLAC National Accelerator Laboratory Watershed Function Science Focus Area (SFA), and NASA-JPL (Jet Propulsion Laboratory) Earth Surface Mineral Dust Source Investigation (EMIT) program. Between June 10 and July 18, 2025, the NEON AOP flight team collected high-resolution aerial imaging spectroscopy and Light Detection and Ranging (LiDAR) data over three domains: the Upper East River (CRBU), Almont Triangle (ALMO), and the Upper Taylor Basin (UPTA). In coordination with the flights, a field campaign acquired ground-truth observations, including observations of vegetation composition, foliar traits, forest demography, and subsurface properties in 18 core sampling areas within the domains. Additional surface water observations were taken at over 380 point locations. All CHESS campaign datasets can be found within the CHESS ESS-DIVE data portal: https://data.ess-dive.lbl.gov/portals/chess. This work was supported by the Watershed Function Science Focus Area at Lawrence Berkeley National Laboratory funded by the US Department of Energy, Office of Science, Biological and Environmental Research under Contract No. DE-AC02-05CH11231. 2026-09-02: This dataset was updated to include 2026 water observation measurements. The 2025 observation files were also updated to ensure a consistent file naming convention across water observation years.

2018 NEON and 2025 CHESS Campaigns

Weak Lensing Mass Calibration of the ACT DR5 Galaxy Clusters with the DES Year 3 Weak Lensing Data

We use weak gravitational lensing measurements from Year 3 Dark Energy Survey data to calibrate the masses of 443 galaxy clusters selected via the Sunyaev-Zel'dovich effect from Atacama Cosmology Telescope Data Release 5 maps of the cosmic microwave background. We incorporate redshift and SZ measurements for individual clusters into a hierarchical model for the stacked lensing signals and perform Bayesian analyses to constrain the hydrostatic mass bias of the clusters. Our treatment of systematic uncertainties includes a prescription for measuring and accounting for the weak lensing boost factor, consideration of a miscentering effect, as well as marginalization over uncertainties in the source galaxy photometric redshift distributions and shear calibration. The resultant constraints on the normalization of the mass-observable relation have a precision of approximately 7%, with the mean WL halo mass of M $_{500c}$ = 5.4 × 10$^{14}$ M $_{⊙}$. We measure the bias between the true cluster mass and the mass estimated from the SZ signal based on an X-ray-calibrated scaling relation assuming hydrostatic equilibrium, to be 1 - b = 0.74$^{+0.06}$ $_{-0.05}$ over the full sample. When splitting the clusters into high (z = 0.43-0.70) and low (z = 0.15-0.43) redshift bins, we measure 1 - b = 0.58$^{+0.06}$ $_{-0.05}$ and 0.81$^{+0.08}$ $_{-0.06}$, respectively. When introducing additional freedom in redshift and mass to the hydrostatic bias model, we find that 1 - b decreases with redshift (with the power law of -1.8$^{+0.5}$ $_{-0.6}$, 99.95% confidence), consistent with findings from other recent studies, while we do not find any significant trend in mass. We also demonstrate that our result is robust against various systematics such as a scale cut, priors on baryonic and miscentering parameters, and degree of scatter in mass-observable relation. The weak-lensing mass calibration presented in this study will be a useful tool for using the ACT clusters as probes of astrophysics, and as a step towards using their abundance as a cosmological probe.

Shin, T. [Carnegie Mellon U.] (ORCID:0000000263895

Dense nuclear matter equation of state from heavy-ion collisions

The nuclear equation of state (EOS) is at the center of numerous theoretical and experimental efforts in nuclear physics. With advances in microscopic theories for nuclear interactions, the availability of experiments probing nuclear matter under conditions not reached before, endeavors to develop sophisticated and reliable transport simulations to interpret these experiments, and the advent of multi-messenger astronomy, the next decade will bring new opportunities for determining the nuclear matter EOS, elucidating its dependence on density, temperature, and isospin asymmetry. Among controlled terrestrial experiments, collisions of heavy nuclei at intermediate beam energies (from a few tens of MeV/nucleon to about 25 GeV/nucleon in the fixed-target frame) probe the widest ranges of baryon density and temperature, enabling studies of nuclear matter from a few tenths to about 5 times the nuclear saturation density and for temperatures from a few to well above a hundred MeV, respectively. Collisions of neutron-rich isotopes further bring the opportunity to probe effects due to the isospin asymmetry. However, capitalizing on the enormous scientific effort aimed at uncovering the dense nuclear matter EOS, both at RHIC and at FRIB as well as at other international facilities, depends on the continued development of state-of-the-art hadronic transport simulations. Furthermore, this white paper highlights the essential role that heavy-ion collision experiments and hadronic transport simulations play in understanding strong interactions in dense nuclear matter, with an emphasis on how these efforts can be used together with microscopic approaches and neutron star studies to uncover the nuclear EOS.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS

Physics basis for the reference flat-top plasma scenario in the ST–E1 fusion power plant

As part of the U.S. Department of Energy’s Milestone-Based Fusion Energy Development Program, Tokamak Energy has completed the pre-concept design of the ST–E1 fusion power plant. ST–E1 is envisaged to operate in two phases: a pilot plant phase, targeting sustained net power production of 300 - 500 MWe for a duration >1 hr, followed by a commercial power plant phase targeting steady-state operations and a normalised overnight capital cost of ⩽12 000 $\$$/kWe. The design process adopted was highly iterative, integrating all major plant systems and progressing in a phased fidelity approach. At the pre-conceptual stage, the emphasis has been on exploring the design space, identifying the main system-level trade-offs, and making the key decisions that define the overall plant concept, rather than optimising a single operating point. This paper, part of a focused collection detailing the ST–E1 pre-concept design, addresses the development of a series of reference flat-top plasma operating points for the pilot plant phase. A modelling workflow was established to develop and assess candidate plasma design points and explore key dependencies. The workflow includes integrated core plasma modelling, magnetohydrodynamic (MHD) stability assessment, equilibrium generation, scrape-off-layer and exhaust modelling, heating & current drive design and optimisation, and turbulent transport modelling. Using this framework, the impact of several key parameters on the flat-top operating space was investigated, including the density limit, core radiation fraction and divertor power loading, level of external heating and curent drive power and assumed pedestal characteristics. The MHD stability, controllability and micro-stability characteristics of these plasmas were also analysed. These investigations informed the definition of a set of fully non-inductive, flat-top reference operating points that satisfy the high-level ST–E1 mission, including a low and high density case, a case that is stable to resistive wall modes and a case with reduced divertor power loading.

ST–E1

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Dark energy survey year 3 results: likelihood-free, simulation-based w CDM inference with neural compression of weak-lensing map statistics

We present simulation-based cosmological wcold dark matter (wCDM) inference using dark energy survey year 3 weak-lensing maps, via neural data compression of weak-lensing map summary statistics: power spectra, peak counts, and direct map-level compression/inference with convolutional neural networks (CNN). Using simulation-based inference, also known as likelihood-free or implicit inference, we use forward-modelled mock data to estimate posterior probability distributions of unknown parameters. This approach allows all statistical assumptions and uncertainties to be propagated through the forward-modelled mock data; these include sky masks, non-Gaussian shape noise, shape measurement bias, source galaxy clustering, photometric redshift uncertainty, intrinsic galaxy alignments, non-Gaussian density fields, neutrinos, and non-linear summary statistics. We include a series of tests to validate our inference results. This paper also describes the Gower Street simulation suite: 791 full-sky pkdgrav3 dark matter simulations, with cosmological model parameters sampled with a mixed active-learning strategy, from which we construct over 3000 mock dark energy survey lensing data sets. For wCDM inference, for which we allow –1 < w < –$\frac{1}{3}$⁠, our most constraining result uses power spectra combined with map-level (CNN) inference. Using gravitational lensing data only, this map-level combination gives Ω m = 0.283$^{+0.020}_{–0.027}$⁠, S 8 = 0.804$^{+0.025}_{–0.017⁠}$, and w < –0.80 (with a 68 per cent credible interval); compared to the power spectrum inference, this is more than a factor of two improvement in dark energy parameter (Ω⁠ DE , w⁠) precision.

79 ASTRONOMY AND ASTROPHYSICS