Search NASASearch

SEARCH · Search NASA

Results for “ST–E1”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

49 records · Page 3

Linking Community‐Climate Disequilibrium to Ecosystem Function

Turnover in species composition often lags behind the pace of climate change, resulting in mismatches between climate and communities. However, the impact of these community‐climate disequilibria on ecosystem functions is rarely considered, and current methods for measuring disequilibria assume that species ranges were, until recently, in equilibrium with climate. Here, in this work, we develop a simple theoretical model to address both of these problems by linking community‐climate disequilibrium with ecosystem functioning. We show how disequilibrium can impair functioning in the near‐term even when climate change is expected to enhance functioning in the long‐term. Responses are most likely to change over time in communities where turnover is slow, the impact of disequilibrium counteracts the direct effects of climate on ecosystem function, and pre‐existing disequilibrium is large. These findings emphasise the importance of precise and unbiased estimates of community‐climate disequilibria for improving ecological forecasts. By fitting our model to time series of both climate and ecosystem function from a metacommunity simulation, we show the potential for community‐climate disequilibrium to be inferred without direct knowledge about species' distributions or climatic tolerances. We end by outlining a research agenda to apply dynamic disequilibrium concepts and test novel hypotheses across diverse ecosystems.

climate change

Best Practices for Resilience Hub Development and Management

The Carbon League and its community partners in East St. Louis, Illinois, have identified five facilities to serve as resilience hubs. These hubs are intended to support the local community through a range of services and resources during blue-sky (everyday), gray-sky (pre-event), and black-sky (emergency) conditions. Transforming these facilities into fully functional resilience hubs requires a broad operational improvement and programmatic planning roadmap. This memo outlines best practices to guide the development of these resilience hubs in East St. Louis, including recommendations for infrastructure services; safety and physical protection; community services; operational protocols; and a phased implementation strategy aligned with realistic funding and capacity constraints. Infrastructure recommendations include strengthening electric power, communications, water, sanitation, and transportation/logistics capabilities, all of which are essential for hubs that may serve as cooling and warming centers, distribution points, and information hubs during emergencies. Safety recommendations focus on accessibility, emergency action planning, indoor air quality, and secure storage of critical equipment. A phased roadmap provides guidance from immediate, low-cost readiness actions to long-term optimization and community integration. Performance metrics and maintenance protocols ensure continuous improvement and operational readiness. This guidance draws on best practices that can be used to support the development of resilient, community-centered hubs capable of enhancing public safety, health, and well-being during everyday operations and emergencies alike.

99 GENERAL AND MISCELLANEOUS

Dynamic environments for space shuttle payloads

Payload bay dynamic data from the first two space shuttle flights are summarized and evaluated. Development of dynamic environment design and test criteria for shuttle payloads from measured flight data is discussed. Factors that must be considered are flight to flight variations, spatial variations, temporal variations, measurement bias errors and the degree of confidence desired that a predicted environment will not be exceeded in flight. Summary and conclusion reports will be published after STS-4 and at appropriate intervals thereafter. The nature of these future reports and their impact on the user community is discussed.

Dennis L Kern

Artemis I Orion ESM Propulsion System Engine Performance

NASA's Orion spacecraft transports humans and cargo into cislunar space for the Artemis program. The European Service Module (ESM), supplied by ESA and its European industry partners, provides Orion with power and in-space propulsion. The Orion-ESM propulsion system is a bipropellant hypergolic propulsion system using monomethyl hydrazine (MMH) and nitrogen tetroxide (MON-3). Primary translational propulsion is provided by the Orbital Maneuvering System Engine(OMS-E), with backup translational propulsion provided by eight Auxiliary thrusters (AUX). Attitude control and small translational maneuvers are provided by twenty four Reaction Control System (RCS) engines. The 2022 Artemis I mission was the first integrated flight test of the Orion-ESM spacecraft and its propulsion system. The OMS-E used on Artemis I was a refurbished Space Shuttle OMS-E that previously flew on nineteen missions ranging from STS-41G in 1984 to STS-112 in 2002. The Auxiliary engines are modified Aerojet Rocketdyne R4D-11 engines produced specifically for the Orion program. The RCS engines are Ariane Group engines originally used for the Automated Transfer Vehicle (ATV) program. This paper will discuss the unique operational requirements for each engine on Orion and the development and qualification effort sat both the engine and system-level that were completed to enable a successful Artemis I mission. Next the paper will evaluate the in-flight performance of the engines during the Artemis I mission showing nominal performance as expected. Additionally, comparisons to models will be presented showing very good correlation. Finally, the paper will address the plan for the engines on future Orion missions and the evolution of the system operation.

Liquid Propulsion Systems

Artemis I Orion ESM Propulsion System Engine Performance

NASA's Orion spacecraft transports humans and cargo into cislunar space for the Artemis program. The European Service Module (ESM), supplied by ESA and its European industry partners, provides Orion with power and in-space propulsion. The Orion-ESM propulsion system is a bipropellant hypergolic propulsion system using monomethyl hydrazine (MMH) and nitrogen tetroxide (MON-3). Primary translational propulsion is provided by the Orbital Maneuvering System Engine(OMS-E), with backup translational propulsion provided by eight Auxiliary thrusters (AUX). Attitude control and small translational maneuvers are provided by twenty four Reaction Control System (RCS) engines. The 2022 Artemis I mission was the first integrated flight test of the Orion-ESM spacecraft and its propulsion system. The OMS-E used on Artemis I was a refurbished Space Shuttle OMS-E that previously flew on nineteen missions ranging from STS-41G in 1984 to STS-112 in 2002. The Auxiliary engines are modified Aerojet Rocketdyne R4D-11 engines produced specifically for the Orion program. The RCS engines are Ariane Group engines originally used for the Automated Transfer Vehicle (ATV) program. This paper will discuss the unique operational requirements for each engine on Orion and the development and qualification effort sat both the engine and system-level that were completed to enable a successful Artemis I mission. Next the paper will evaluate the in-flight performance of the engines during the Artemis I mission showing nominal performance as expected. Additionally, comparisons to models will be presented showing very good correlation. Finally, the paper will address the plan for the engines on future Orion missions and the evolution of the system operation.

Reuse

Constraining primordial non-Gaussianity from DESI DR1 quasars and Planck PR4 CMB lensing

We present the first measurement of local-type primordial non-Gaussianity from the cross-correlation between 1.2 million spectroscopically confirmed quasars from the first data release (DR1) of the Dark Energy Spectroscopic Instrument (DESI) and the Planck PR4 CMB lensing reconstructions. The analysis is performed in three tomographic redshift bins covering 0.8 < z < 3.5, covering a sky fraction of ∼20%. We adopt a catalog-based pseudo-C ℓ estimator and apply linear imaging weights validated on noiseless mocks. Compared to previous analyses using photometric quasar samples, our results benefit from the high purity of the DESI spectroscopic sample, the reduced noise of PR4 lensing, and the absence of excess large-scale power in the spectroscopic quasar auto-correlation. Fitting simultaneously for the non-Gaussianity parameter f NL and the linear bias amplitude in each redshift bin, we obtain f NL = 2 +28 -34 for a response parameter p = 1.6, and f NL = 6 +20 -24 for p = 1.0. These results improve the constraints on f NL by ∼35% compared to the previous analysis based on the Legacy Imaging Survey DR9. Additionally, we derive an optimal weighting scheme to maximize the constraining power. In this case, and assuming p = 1.6, we obtain f NL = 19 +25 -31 . Our results demonstrate the statistical power of DESI quasars for probing inflationary physics, and highlight the promise of future DESI data releases.

cosmological parameters from CMBR

Copacabana: a probabilistic membership assignment method for galaxy clusters

Cosmological analyses using galaxy clusters in optical/near-infrared photometric surveys require robust characterization of their galaxy content. Precisely determining which galaxies belong to a cluster is crucial. In this paper, we present the COlor Probabilistic Assignment of Clusters And BAyesiaN Analysis (Copacabana) algorithm. Copacabana computes membership probabilities for all galaxies within an aperture centred on the cluster using photometric redshifts, colours, and projected radial probability density functions. We use simulations to validate Copacabana and we show that it achieves up to 89 per cent membership accuracy with a mild dependence on photometric redshift uncertainties and choice of aperture size. We find that the precision of the photometric redshifts has the largest impact on the determination of the membership probabilities followed by the choice of the cluster aperture size. We also quantify how much these uncertainties in the membership probabilities affect the stellar mass–cluster mass scaling relation, a relation that directly impacts cosmology. Using the sum of the stellar masses weighted by membership probabilities (⁠μ * ⁠) as the observable, we find that Copacabana can reach an accuracy of 0.06 dex in the measurement of the scaling relation at low redshift for a Legacy Survey of Space and Time type survey. These results indicate the potential of Copacabana and μ * to be used in cosmological analyses of optically selected clusters in the future.

79 ASTRONOMY AND ASTROPHYSICS

Shuttle-Mir [Мир-Шаттл] Supplement

This is a companion to an illustrated history book with the same title. This set of electronic files includes the full text and images in the book, as well as additional material. Interviews, photographs, and biographies of the U.S. Astronauts, cosmonauts, and team members for the Shuttle-Mir Program are available. STS Mission Summaries for each mission involved can be viewed, including launch and landing details, crew lists, and mission highlights. Photographs and videos from each mission are included, as well as diagrams of different spacecraft, and computer-generated animations of the Mir deorbit, collision, and flyaround. Additional documents include mission status reports, published documents, news releases, personal letters, and oral histories. The experiments carried out on Mir are described, highlighting combustion and fluid physics research, life in microgravity, and research of the development of the solar system. The focus on improving space technology and planning for the International Space Station is explained. The main features of the book itself include: (1) Training and Operations; (2) Long Duration Psychology; (3) Bilingual Blues; and (4) Earth Observations.

Astronautics

The Solid Surface Combustion Experiment Aboard the USML-1 Mission

AA Experimental results from the five experiments indicate that flame spread rate increases with increasing ambient oxygen content and pressure. An experiment was conducted aboard STS-50/USML-1 in the solid Surface Combustion Experiment (SSCE) hardware for flame spread over a thin cellulosic fuel in a quiescent oxidizer of 35% oxygen/65% nitrogen at 1.0 atm. pressure in microgravity. The USML-1 test was the fourth of five planned experiments for thin fuels, one performed during each of five Space Shuttle Orbiter flights. Data that were gathered include gas- and solid-phase temperatures and motion picture flame images. Observations of the flame are described and compared to theoretical predictions from steady and unsteady models that include flame radiation from CO2 and H2O. Experimental results from the five esperiments indicate that flame spread rate increases with increasing ambient oxygen content and pressure. The brightness of the flame and the visible soot radiation also increase with increasing spread rate. Steady-state numerical predictions of temperature and spread rate and flame structure trends compare well with experimental results near the flame's leading edge while gradual flame evolution is captured through the unsteady model.

Robert A Altenkirch

Dark energy survey year 3 results: likelihood-free, simulation-based w CDM inference with neural compression of weak-lensing map statistics

We present simulation-based cosmological wcold dark matter (wCDM) inference using dark energy survey year 3 weak-lensing maps, via neural data compression of weak-lensing map summary statistics: power spectra, peak counts, and direct map-level compression/inference with convolutional neural networks (CNN). Using simulation-based inference, also known as likelihood-free or implicit inference, we use forward-modelled mock data to estimate posterior probability distributions of unknown parameters. This approach allows all statistical assumptions and uncertainties to be propagated through the forward-modelled mock data; these include sky masks, non-Gaussian shape noise, shape measurement bias, source galaxy clustering, photometric redshift uncertainty, intrinsic galaxy alignments, non-Gaussian density fields, neutrinos, and non-linear summary statistics. We include a series of tests to validate our inference results. This paper also describes the Gower Street simulation suite: 791 full-sky pkdgrav3 dark matter simulations, with cosmological model parameters sampled with a mixed active-learning strategy, from which we construct over 3000 mock dark energy survey lensing data sets. For wCDM inference, for which we allow –1 < w < –$\frac{1}{3}$⁠, our most constraining result uses power spectra combined with map-level (CNN) inference. Using gravitational lensing data only, this map-level combination gives Ω m = 0.283$^{+0.020}_{–0.027}$⁠, S 8 = 0.804$^{+0.025}_{–0.017⁠}$, and w < –0.80 (with a 68 per cent credible interval); compared to the power spectrum inference, this is more than a factor of two improvement in dark energy parameter (Ω⁠ DE , w⁠) precision.

79 ASTRONOMY AND ASTROPHYSICS

WINDSAT Free Flyer Using the Advanced TIROS-N Satellite

The results of this study show the feasibility of carrying a wind measuring lidar on an ATN-derivative free flying spacecraft. The overall configuration fits within the Shuttle bay and uses the same techniques for STS Launch as the proposed SAATN spacecraft. The lidar can be made light enough that the total weight of the satellite is well within the capability of the onboard propulsion system for transfers to a Sun synchronous orbit at 833 km attitude. The principal techniques for weight minimization are the use of the Perkin Elmer proprietary HIP process for the telescope, new packaging concepts for the laser and for the optics-laser interface, and the application of current technology to the signal processing hardware. Power minimization is achieved for the lidar primarily by use of a low pulse repetition frequency, i.e., 2pps, and again by the use of current processor technology. The power capability of the spacecraft is enhanced by increasing the ATN array size 25 percent, through the addition of two more solar array panels of the present size, and by limiting the range of Sun angles over which the spacecraft is operated. The same basic concept for the lidar as proposed in the Shuttle Windsat study is recommended here, but there are some changes in details to improve weight and power. No major technology break-throughs are required for the lidar, but some technology experiments are recommended for the laser subsystem to verify isotopic gas lifetime and performance, modulator life and weight, and for space qualification. Spacecraft changes are all natural modifications or growth to accommodate the payload. Overall, the proposed system provides substantial margin for the uncertainties for the future and for potential payload change, and also demonstrates the reasonableness of the Windsat Free Flyer concept.

Herbert M Gurk

Systems Engineering and Analysis in Support of a US Federal Staging Facility for UNF

The US Department of Energy Office of Nuclear Energy (DOE-NE) Office of Spent Fuel and High-Level Waste Disposition is examining a set of system options and conducting supporting analyses to inform the development of an integrated waste management system, which may include one or more federal staging facilities (FSFs) for used nuclear fuel (UNF ) sited using a collaborative siting process. This paper focuses on the ongoing activities in two systems engineering and analysis work areas: (1) data and tools development, validation, and maintenance and (2) systems engineering execution. Within the first work area, the STANDARDS 5.0 UNF data and analysis tool, formerly known as UNF-ST&DARDS, is being developed as a foundational resource to assist in the management of UNF data. It has the key capability to model UNF throughout the entire back end of the fuel cycle. STANDARDS also includes several compatible analysis tools for the time-dependent characterization of UNF and related systems by interfacing with the SCALE code system for nuclear analysis and COBRA-SFS for thermal analysis. Also, within the data and tools area is the Next Generation System Analysis Model (NGSAM), which is an agent-based simulation software tool expressly designed to be capable of modeling the waste management system, including the transportation of UNF to and from a FSF. NGSAM has been developed to enable informed decision-making by providing the capability to analyze various potential system options for the management of UNF and high-level radioactive waste. Finally, in the systems engineering execution area, the team has begun to apply a disciplined systems engineering approach at the system level along with supporting analysis to guide the development of the FSF project requirements (including associated transportation infrastructure). Systems engineering principles and practices and their adaptation/application to design and development activities will ensure that the waste management system is effectively implemented as work proceeds. Other activities include investigating the implications of changes in various assumptions and parameters related to waste management systems, such as UNF acceptance rates, receipt logic, facility capacities and capabilities, use of standardized canisters, and different assumed facility operation start dates. Keywords: federal staging facility (FSF), used nuclear fuel (UNF), integrated waste management (IWM) system, Next Generation System Analysis Model (NGSAM), STANDARDS, systems engineering

Joseph, Robert

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI