Design and Implementation of the CEBAF Element Database

With inauguration of the CEBAF Element Database (CED) in Fall 2010, Jefferson Lab computer scientists have taken a first step toward the eventual goal of a model-driven accelerator. Once fully populated, the database will be the primary repository of information used for everything from generating lattice decks to booting front-end computers to building controls screens. A particular requirement influencing the CED design is that it must provide consistent access to not only present, but also future, and eventually past, configurations of the CEBAF accelerator. To accomplish this, an introspective database schema was designed that allows new elements, element types, and element properties to be defined on-the-fly without changing table structure. When used in conjunction with the Oracle Workspace Manager, it allows users to seamlessly query data from any time in the database history with the exact same tools as they use for querying the present configuration. Users can also check-out workspaces and use them as staging areas for upcoming machine configurations. All Access to the CED is through a well-documented API that is translated automatically from original C++ into native libraries for script languages such as perl, php, and TCL making access to the CED easy and ubiquitous. Notice: Authored by Jefferson Science Associates, LLC under U.S. DOE Contract No. DE-AC05-06OR23177. The U.S. Government retains a non-exclusive, paid-up, irrevocable, world-wide license to publish or reproduce this manuscript for U.S. Government purposes.

43 PARTICLE ACCELERATORS↗

COMMISSIONING AND OPERATION OF THE CEBAF 100 MV CRYOMODULES

The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of ten new 100 MV cryomodules and RF systems. The superconducting RF cavities are designed to operate CW at a maximum accelerating gradient of 19.3 MV/m. To support the higher gradients and higher Q{sub L} ({approx} 3 x 10{sup 7}), a new RF system has been developed and is being installed to power and control the cavities. The RF system employs digital control and 13 kW klystrons. Recently, two of these cryomodules and associated RF hardware and software have been installed and commissioned in the CEBAF accelerator. Electrons at linac currents up to 540 {micro}A have been successfully accelerated and used for nuclear physics experiments. This paper reports on the commissioning and operation of the RF system and cryomodules.

43 PARTICLE ACCELERATORS↗

CEBAF SRF Performance during Initial 12 GeV Commissioning

The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of eleven new 100 MV cryomodules (88 cavities). The superconducting RF cavities are designed to operate CW at an accelerating gradient of 19.3 MV/m with a Q L of 3×10 7 . Not all the cavities were operated at the minimum gradient of 19.3 MV/m with the beam. Though the initial 12 GeV milestones were achieved during the initial commissioning of CEBAF, there are still some issues to be addressed for long term reliable operation of these modules. This paper reports the operational experiences during the initial commissioning and the path forward to improve the performance of C100 (100 MV) modules.

43 PARTICLE ACCELERATORS↗

Design Studies of High-Luminosity Ring-Ring Electron-Ion Collider at CEBAF

An electron-ion collider of a center-of-mass energy up to 90 GeV at luminosity up to 1035 cm-2s-1 with both beams highly polarized is essential for exploring the new QCD frontier of strong color fields in nuclear and precisely imaging the sea-quarks and gluons in the nucleon. A conceptual design of a ring-ring collider based on CEBAF (ELIC) with energies up to 9 GeV for electrons/positrons and up to 225 GeV for protons and 100 GeV/u for ions has been proposed to fulfill the science desire and to serve as the next step for CEBAF after the planned 12 GeV energy upgrade of the fixed target program. Here, we summarize recent design progress for the ELIC complex with four interaction points (IP); including interaction region optics with chromatic aberration compensation scheme and complete lattices for the Figure-8 collider rings. Further optimization of crab crossing angles at the IPs, simulations of beam-beam interactions, and electron polarization in the Figure-8 ring and its matching at

43 PARTICLE ACCELERATORS↗

Overview of the First Five Refurbished CEBAF Cryomodules

The Thomas Jefferson National Accelerator Facility is currently engaged in a cryomodule refurbishment project known as the C50 project. The goal of this project is robust 6 GeV, 5 pass operation of the Continuous Electron Beam Accelerator Facility (CEBAF). The scope of the project includes removing, refurbishing and replacing ten CEBAF cryomodules at a rate of three per year. Refurbishment includes reprocessing of SRF cavities to eliminate field emission and increase the nominal gradient from the original 5 MV/m to 12.5 MV/m. New "dogleg" couplers between the cavity and helium vessel flanges will intercept secondary electrons that produce arcing at the 2 K ceramic window in the fundamental Power Coupler (FPC). Modifications of the external Q (Qext) of the FPC will allow higher gradient operations. Other changes include new ceramic RF windows for the air to vacuum interface of the FPC and improvements to the mechanical tuner. Any damaged or worn components will be repla

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Reduction of waveguide vacuum trips in CEBAF accelerating cavities with a combination ion pump and non-evaporable getter pump

Pressure spikes in the fundamental power coupler waveguide are a significant source of trips during the operation of both original and refurbished superconducting radio-frequency cavities installed in the CEBAF accelerator. In its original configuration, two waveguides from a cavity-pair are connected to a single 32 l/s ion pump. In 2017 a new cavity-pair was installed in a refurbished cryomodule in which a NEXTorr® D200-5 combination ion pump and non-evaporable getter pump was installed for each waveguide. It is shown that hydrogen is the dominant residual gas in the waveguide and simulations with Molflow+ indicated that the new pumping scheme allows reducing the pressure at the end of the waveguide by a factor of ~5 , compared to the original configuration. In conclusion, the new cavity-pair has been operating in CEBAF for a total of 431 days and it only had a total of 3 trips due to vacuum spikes in the waveguide.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Physics with CEBAF at 12 GeV and future opportunities

Here, we summarize the ongoing scientific program of the 12 GeV Continuous Electron Beam Accelerator Facility (CEBAF) and give an outlook into future opportunities. The program addresses important topics in nuclear, hadronic, and electroweak physics, including nuclear femtography, meson and baryon spectroscopy, quarks and gluons in nuclei, precision tests of the standard model and dark sector searches. Potential upgrades of CEBAF and their impact on scientific reach are discussed, such as higher luminosity, the addition of polarized and unpolarized positron beams, and doubling the beam energy.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Multiple Synchrotron Light Monitors for Transverse Matching and Monitoring at CEBAF

Beam setup at the Continuous Electron Beam Accelerator Facility (CEBAF) involves threading beam through the machine and monitoring global transfer functions to identify and address cumulative lattice errors. Transverse beam emittance may grow by as much as two orders of magnitude, mediated by synchrotron radiation. Re-matching the enlarged beam phase space into successive re-circulation arcs minimizes this emittance growth but requires knowledge of the actual beam distribution. This is now accomplished through quadrupole scans using wire profile monitors, the most time-consuming activity in our setup process. We propose to use Synchrotron Light Monitors (SLMs) to image the beam at homologous points in the four super-period recirculation arc lattices. Benefits include real-time monitoring of beam parameters and reduced elapsed time for initial setup.These SLMs will be installed in Arc 7 of the CEBAF machine, where Synchrotron Radiation contributes moderately to emittance growth. One of four required SLMs will be installed and commissioned this year, with the rest being installed next year.

Freeman, B.↗

Development of a Smart Alarm System for the CEBAF Injector

RadiaSoft and Jefferson Laboratory are working together to develop a machine-learning-based smart alarm system for the CEBAF injector. Because of the injector’s large number of parameters and possible fault scenarios, it is highly desirable to have an autonomous alarm system that can quickly identify and diagnose unusual machine states. We present our work on artificial neural networks designed to identify such undesirable machine states. In particular, we test both auto-encoders and inverse models as possible tools for differentiating between normal and abnormal states. These models are being developed using both supervised and unsupervised learning techniques, and are being trained using CEBAF injector data collected during dedicated machine studies as well as during regular operations. Lastly, we discuss tradeoffs between the two types of models.

Abell, D. T.↗

Pursuing the Origin and Remediation of Low Q0 observed in the Original CEBAF Cryomodules

We report on results of a new investigation into the Q0 degradation phenomenon observed in original CEBAF cavities when assembled into cryomodules. As a result, the RF dissipation losses increased by roughly a factor of two. The origin of the degradation, first observed in 1994, has remained unresolved up to current period, despite much effort. Recently, a new investigation has been launched, taking advantage of the latest cryomodule to undergo refurbishment. Systematic measurements are conducted with respect to the magnetic shielding effects of the double-layer shields and the magnetic properties of various components within the inner shield. This resulted in the new discovery of strongly magnetized strut springs as a major source of remnant magnetic flux near a cavity inside of all magnetic shielding. New springs with superior magnetic properties have been found, evaluated and implemented into the current cryomodule. Cryogenic RF testing of this module is expected to complete by end of 2013. In this contribution, we will review the data accumulated so far. Options for complete Q0 preservation of assembled cavities and possible Q0 remediation for those 330 cavities already installed in CEBAF will be presented.

Geng, R.L.↗

12 GeV CEBAF Initial Operational Experience and Challenges

The 12 GeV Upgrade for the Continuous Electron Beam Accelerator Facility (CEBAF) achieved CD-4B, or Project Completion, on September 27, 2017. The 13-year $338M project doubled the beam energy of the CEBAF accelerator while also adding a fourth experimental hall. The scope of work for the accelerator complex was completed in 2014. Over the subsequent three years the upgrades for the experimental halls were completed, beamlines and spectrometers commissioned and transitions made to production running for the Nuclear Physics program. This paper will present an overview of the operational experience gained during initial accelerator commissioning through the recent achievements of simultaneous 4-Hall operations at full beam power.

Spata, Michael F.↗

20-24 GeV FFA CEBAF Energy Upgrade

A proposal was formulated to increase the CEBAF energy from the present 12 GeV to 20-24 GeV by replacing the highest-energy arcs with Fixed Field Alternating Gradient (FFA) arcs. The new pair of arcs would provide six or seven new beam passes, going through this magnet array, allowing the energy to be nearly doubled using the existing CEBAF SRF cavity system. One of the immediate accelerator design tasks is to develop a proof-of-principle FFA arc magnet lattice that would support simultaneous transport of 6-7 passes with energies spanning a factor of two. We also examine the possibility of using combined function magnets to configure a cascade, six-way beam split switchyard. Finally, a novel multi-pass linac optics based on a weakly focusing lattice is being explored.

Bogacz, Slawomir Alex↗

HIGH VOLTAGE DESIGN AND EVALUATION OF WIEN FILTERS FOR THE CEBAF 200 keV INJECTOR UPGRADE

High-energy nuclear physics experiments at the Jefferson Lab Continuous Electron Beam Accelerator Facility (CEBAF) require highly spin-polarization electron beams, produced from strained super-lattice GaAs photocathodes, activated to negative electron affinity in a photogun operating at 130 kV dc. A pair of Wien filter spin rotators in the injector defines the orientation of the electron beam polarization at the end station target. An upgrade of the CEBAF injector to better support the upcoming MOLLER experiment requires increasing the electron beam energy to 200 keV, to reduce unwanted helicity correlated intensity and position systematics and provide precise control of the polarization orientation. Our contribution describes design, fabrication and testing of the high voltage system to upgrade the Wien spin rotator to be compatible with the 200 keV beam. This required Solidworks modeling, CST and Opera electro- and magnetostatic simulations, upgrading HV vacuum feedthroughs, and assembly techniques for improving electrode alignment. The electric and magnetic fields required by the Wien condition and the successful HV characterization under vacuum conditions are also presented.

Palacios-Serrano, G.↗

Current Status of the FFA@CEBAF Energy Upgrade Study

This work will describe the current status of the FFA@CEBAF energy upgrade feasibility studies. Technical updates are given, but more specific details are left to separate contributions. Specifically, this work will discuss improvements to the FFA arcs, a new recirculating injector proposal, and numerous modifications to the current 12 GeV CEBAF which will be required, such as the spreaders and recombiners architecture, splitters (time-of-flight chicanes), the extraction system, and the hall lines.

Bodenstein, R. M.↗

DESIGNING THE SPREADERS AND SPLITTERS FOR THE FFA@CEBAF ENERGY UPGRADE

A degrader device is being built at the CEBAF injector to degrade the electron beam phase space for machine acceptance studies. The electron beam is degraded through multiple scattering in a thin target before further transport in the injector beamline for injection into CEBAF. The degraded electron beam will approximate phase space distributions expected from a bremsstrahlung-based polarized positron source as in the PEPPo method. The effort is in broader support of the Ce+BAF positron capability that is currently under study. Two options for the degrader device are considered, and simulation results are presented.

Sy, A.↗

Polarized electron injector for positron production at CEBAF

As a part of the effort to expand the capabilities of CE-BAF 12 GeV (Continuous Electron Beam Accelerator Facility) at Jefferson Lab, the addition of a polarized positron source is considered. This capability would provide acceleration of high duty-cycle polarized posi-trons, with spin >60% polarization, through the same main CEBAF accelerator machine with appropriate mag-net field reversals and linac phasing to the four CEBAF experimental halls. To produce this positron beam, a high average current (3-10 mA) highly polarized electron beam with energy of 100 ? 150 MeV is required at the positron source target. The focus of this paper is the de-sign of that polarized electron beam injector. We will describe the production and delivery of a >3 mA highly polarized electron beam. We will discuss different aspects of the design, the photocathode gun, beam dynamics simulation results, spin manipulation, bunching and accelerating process and final electron beam parameters.

Kazimi, R.↗

COMMISSIONING RESULTS OF THIRD C75 CRYOMODULE FOR CEBAF

The program to upgrade CEBAF cryomodules has been implemented to enhance the energy gain of refur-bished cryomodules up to 75 MeV. This strategy in-volves reusing the waveguide end-groups from original CEBAF cavities produced in the 1990s, and existing five elliptical cell cavities are replaced with a new optimized cell shape cavity constructed from large-grain, ingot Nb material. Following fabrication, each cavity undergoes centrifugal barrel polishing and electropolishing and is tested at 2.07 K. Eight cavities are then assembled into "cavity pairs" and tested at 2.07 K before integration into the cryomodule. This paper pre-sents the outcomes of the cavity qualification for the third C75 module, providing a detailed account of the assessment in both a vertical cryostat and the acceptance test results of the cryomodule. Furthermore, efforts have been made to address performance limitations arising from field emission and multipacting

Senevirathne, I.↗

SRF Cavity Instability Detection with Machine Learning at CEBAF

During the operation of the Continuous Electron Beam Accelerator Facility (CEBAF), one or more unstable superconducting radio-frequency (SRF) cavities often cause beam loss trips while the unstable cavities themselves do not necessarily trip off. The present RF controls for the legacy cavities report at only 1 Hz, which is too slow to detect fast transient instabilities during these trip events. These challenges make the identification of an unstable cavity out of the hundreds installed at CEBAF a difficult and time-consuming task. To tackle these issues, a fast data acquisition system (DAQ) for the legacy SRF cavities has been developed, which records the sample at 5 kHz. A Principal Component Analysis (PCA) approach is being developed to identify anomalous SRF cavity behavior. We will discuss the present status of the DAQ system and PCA model, along with initial performance metrics. Overall, our method offers a practical solution for identifying unstable SRF cavities, contributing to increased beam availability and machine reliability.

Carpenter, A.↗