Traditionally, power system generation sources have been composed of synchronous generators, of which the fault current behavior is understood with minimal differences between generation size and types due to the physics of their construction. Present protection schemes and modeling methods are based upon these understood characteristics. Most renewable generation is composed of inverter-based resources (IBR), in which fault current is determined by switching control software and hardware limitations, each of which can vary between manufacturers and even between models of the same manufacturer. The resulting fault current is low in magnitude, low in negative-sequence current, unpredictable phase angles, and is a challenge to model. These characteristics also result in a challenge to traditional protection schemes and fault simulation software. To address several of these concerns, the project has the following goals: 1. Improve IBR models: Improve IBR models used in short circuit (SC) programs to accurately capture the response of IBRs at the bulk power system (BPS) level for fault and protection studies. 2. Develop automation tool: Develop an automation tool that allows engineers to identify protection coordination and sensitivity issues by performing SC and protection coordination studies in a high IBR-penetrated grid by applying variations to the IBR models, faults, contingencies, etc. 3. Develop schemes: Develop new protection mitigation solution schemes that complement the existing protection systems to ensure safe operation of the BPS with higher IBR penetration levels. The project team did not achieve this final goal, as the Department of Energy (DOE) stopped the project early due to changes in DOE funding priorities. The termination notice came at the beginning of the final project phase, while the team was identifying and beginning to investigate protection issues. It should be noted that the team discussed a 100% penetration scenario. However, this scenario would require the use of grid-forming IBR models that are not presently available. Since developing these models requires additional effort, the 100% penetration scenario was not pursued during this project. In the future, developing the methodology and models for the 100% scenario could benefit the industry.